Forwards List of Vendors Who Will Be Conducting Equipment Qualification Testing,In Response to 830202 Request for Addl Info for Seismic & Dynamic Qualification Review
ML18018B644
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/27/1984
From: Mcduffie M
CAROLINA POWER & LIGHT CO.
To: Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NLS-84-187, NUDOCS 8405030067
Download: ML18018B644 (8)


Text

~ ~

REGULA1 Y L..ORMATION DISTR IBUTIO . ~ YS M (R IDS)

ACCESSION NBR:8405030067 DUG ~ DATE: 84/04/27 NOTARIZED: NO DOCKET ff FACIL:50'400 Shearon Harris Nuclear power Plant~ Unit 1~ Carolina 050Q0400 AUTH, NAME AUTHUR AFFILIATION MCDUFFIEEMRA ~ Cai ol ina Power 8 Light Co ~

RECIP.NAME RECIPIENT AFFILIATION DEYOUNGER ~ C ~ Director s, UfficeE Office of Inspection and Enfor cement

SUBJECT:

For wards l ist of vendor s who wil l be conducting equipment qualification testingiin response to 83020? request for addi info for seismic 8 dynamic qualficiatjon review.

DISTRXSUTXUN CDDE: AOOSS COPIES RECEXYED:LTR ENCL J SIZE: h3 TITLE: OR/Licensing Submitt'al: Equipment Qualification NOTES; REGIP IENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME , LTTR ENCL NRR LB3 BC 12 0 BUCKLEYEB 01 I 1 1 INTERNAL: ELD/HDSi'E 12 1 1 GC 13 1 1 FILE 09, 1 1 NRR KARSCHgR 1 1 ERR/DE/EQB 07 2 NRR/DL DIR 14 1 1 RAB 06 1 1 NRR/DS I/AEB 1 1 REG FILE 04 1 RGN2 1 1 EXTERNAL: AGRS 15 8 8 LPDR 03 1 1 NRC PDR Qg 1 1 NSIC 05 1 NTIS 31 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR c% ENCL

~ ~ p ~

F W

o I'

1 I If Pl W W II f

f, k 1

1W 11 h~

W 1 Wf r ff Wk I

1 1 Wf ik j

.Wk, j" "W lw

SERIAL: NLS-84-187 Carolina Power, & Light Company APR 37 1984 Hr. Richard C. DeYoung, Director Office of Inspection & Enforcement United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO ~ 1 DOCKET NO. 50-400 EQUIPHENT QUALIFICATION FUTURE TEST PROGRAMS

REFERENCE:

NRC Letter Dated Feburary 2, 1983, G. W. Knighton to E. E. Utley, "Request for Additional Information for Seismic and Dynamic Qualification Review for Shearon Harris" Carolina Power & Light Company (CP&L) hereby submits a list of vendors who will be conducting equipment qualification testing in the future. This information is being provided in response to the referenced request for information.

Should you have any questions with regard to this issue, please contact Hr. Pedro Salas at (919) 836-8015.

Yours very truly, H. A. HcDuffie Senior Vice President Nuclear Generation PS/pgp (9897PSA)

Enclosure:

SHNPP EQ Test Schedule CC 1 Hr. B. C. Buckley (NRC) Nr. Wells Eddleman Hr. G. F. Maxwell (NRC-SHNPP) Dr. Phyllis Lotchin Nr. J P. O'Reilly (NRC-RII) Nr. John D. Runkle Hr. Gary Zeck (NRC-I&E) Dr. Richard D. Wilson Nr. Travis Payne (KUDZU) lir. G. 0. Bright (ASLB)

Hr. Daniel F. Read (CHANGE/ELP) Dr. J. H. Carpenter (ASLB)

Chapel Hill Public Library Hr. J. L. Kelley (ASLB) F40 Wake County Public Library 8405030067 840427 ~I PDR ADOCX OS000400 PDR 411 Fayetteville Street o P. 0. Box 1551 ~ Raleigh, N. C. 27602

~ 5 V

~ <<'y a 1 h

  • g t 1 ) % l ~F I

ATTACHMENT EQUIPMENT QUALIFICATION FUTURE TEST PROGRAMS EQUIPMENT DESCRIPTION TEST LOCATION TYPE MODEL MANUFACTURER SYSTEM AND SCHEDULE

l. Electric Heating Coils, o Control Room AC System Acton Labs (Mass.)

Seismic Test Brasch Manufacturing o Air Cleaning Units June, 1984 (Humidity Control)

2. Water Chiller (WC-2) Essential Services Acton Labs (Mass.)

Control Panel Only Chilled Water System Seismic Test Serving RAB & FHB March, 1984 ESF Air Handling Units

3. Aux Feedwater Pump/ Aux Feedwater Terry Turbine Div.,

Turbine Driver (Conn.)

Seismic/Envir.

Qual Test for Turbine Driver Class IE Accessories and Control Panel June, 1984

4. AF Pump Discharge Aux Feedwater Masonellon & Cyzna, Flow Control Valves (Mass.)

Side Load Test 3AF-F1SA-1 (Seismic &

3AF-F2SA-1 Operability) 3AF-F3SA-1 April, 1984

5. Pressurizer Safety Pressurizer Crosby Valve Co.

Relief Valve Position (Mass.)

Indicator Seismic & Envir.

Qual. Test Ongoing to June, 1984

6. H2 Analyzer Cabinet Containment Hydrogen Wyle Labs (CA)

& Remote Control Panel Analyzer System April, 1984

7. Low Range Differential o RAB to outside Gould Facilities Pressure Transmitters Differential Pressure (Calif.)

PO NY-435289 (IN-34) o Cont. to outside *(Qualification will Gould, Inc; Measurement Differential Pressure be by combination of Systems Division o Control Room to outside type test and Differential Pressure similarity).

o FHB to outside diff. Seller shall submit pressure Qualification Report 0 FAN E-6 Discharge Flow not later than o Post Accident OAI Flow 10/26/84.

(9897PSA/pgp)

~ ~ N( H (H( ( ~ ' ~ ~ ( ~( H ~ = ~

EQUIPMENT QUALIFICATION FUTURE TEST PROGRAMS (cont'd)

EQUIPMENT DESCRIPTION TEST LOCATION TYPE MODEL MANUFACTURER SYSTEM AND SCHEDULE

7. Low Range Differential o Emerg. Fltr. Fan. R2 Disch.

Pressure Transmitters flow PO NY-435289 (IN-34) 0 FHB Emerg. Exhaust Fans Gould, Inc; Measurement E-12, E-13 flow Systems Division (Continued)

8. Isokinetic Sampling o Pre-Entry Purge To be determined System for Radiation o Turb Bldg Cond Vac Pump at a later date Monitoring System Accident Effluent Exhaust (IN-41) FHB Exhaust o RAB Normal Exhaust PO (Not awarded yet) o RAB Emerg Exhaust 0 WPB Exhaust Stack (Plenum I) o HP Calibration Room o FHB Emerg Exhaust 0 WPB Control Room WPB Zone 6 o WPB Zone 7 o WPB Zones 1,2,3,4,6 o WPB Hot Lab (9897PSA/pgp)