ML18018B587

From kanterella
Jump to navigation Jump to search
Forwards Rev 0 to Inservice Insp Procedure ISI-201, ASME Preservice Insp Program Plan (Except Reactor Vessel), in Response to Matls Engineering Branch SER Open Item 6
ML18018B587
Person / Time
Site: Harris 
Issue date: 03/07/1984
From: Mcduffie M
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML18018B588 List:
References
NLS-84-101, NUDOCS 8403140174
Download: ML18018B587 (8)


Text

1 1

1 1

0 1

2 1

1 1-1 1

1 0,.

1 1

1 1

1 1

1 1

1 1

1 0,

1 1

1 1

1 1

1 REGULATOR I

RMATION DISTRIBUTION (RIDS)

ACCESSION NBR t 6403140174 DOC ~ DATE: 84/03/07 NOTARIZED:

NO

+

DOCKET FACIL;50-400 Shearon Harris Nuclear Power Planti Unit ii Carolina 05000400 AUTH,NAME AUTHOR AFFILIATION MCDUFFIK~M.A, Carolina Power 8 Light Co.

RKCIP,NAMK RECIPIENT AFFILIATION DENTONiH.R>>

.Office, of'Nuclear Reactor Regulationi Director SUBJECT!

Forwards Rev O..to Inkier vice Insp Pr ocedure ISI 201'ASME Preservice Insp Program Plan (Except Reactor Vessel)i".in-response to Matls Engineering Branch SER Open Item 6".~

DISTRIBUTION CODE! 8001S COPIES RECEIVED-'LTR 'E:

<>bur~ ~+%tea+.

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL NRR/DL/ADL 1

0 NRR L83 BC 1

0 NRR LB3 LA 1

0 BUCKLKYiB 01 1

1 INTERNAL KLD/WDS1 1,

0 IE FILE" IE/DEPER/EPB 3e 3

5 9 IE/DKPER/IRB.35 IE/DQASIP/QAB21 1

1 NRR/DK/AEAB NRR/DE/CEB 11 1

1

'NRR/DE/EHEB NRR/DE/EQB 13 2

2 NRR/DK/GB 28 NRR/DE/ME8 18 1

1 NRR/DE/MTEB 17 NRR/DE/SAB 24 1

1 NRR/DE/SGEB 25

'NRR/DHFS/HFE840 1

1 NRR/DHFS/LQB 32'RR/DHFS/PSRB 1

1 NRR/DL/SSPB NRR/DS I/AEB 26- '

1 1

NRR/DSI/ASB NRR/DSI/CPB 10 1

1 NRR/DSI/CSB 09 NRR/DSI/ICSB 16 1

1 NRR/DSI/METB 12'RR/DSI/PSB 19 1

1 RAB 22 NRR/DSI/RSB 23 1

1 EG

.L 04 RGN2 RM/DD AMI/MI8 EXTERNAL; ACRS 41 b

f BNL(AMDTS ONlY)

DMB/DSS (AMDTS) 1 1

FEMA"RKP DIV 39 LPDR 03-1 1

NRC PDR 02 NSIC 05 1

1 NTIS TOTAL NUMBER OF COPIES REQUIRED:

LTTR 53

'ENCL 46

IO Nk f e F'),, )

<< t

'h e I't l F'i f

')'

>'k')

e

<< 'jl'j!

n I

If','I l I,Y

)yi' I

QI i'l 1

it

~

e <<)i 'f 'I"<<FF<<jff

'pe g

)Fq l

1I ay a

'I i

II ')k)'l 'ik y,r

'k) f ff k I'.

i

~

~

h,k g

~ k,l,

kh

~(cy FF

'h Fk r- ~W~-,WF Wee g

F <<

',') I)'k F)C~I

<<ri IFIFI $

<<1 I

I lg '<,,qj,,

f" N

lk

>>c)

K 'g 3j<<g e

l<<FI) 0

",) et<<k )'f,<< f,ff I

t)A Poll cfk>J flclF'k Ik<<t

<<I I't I '<<Pt i' III'f,lkflf'$

j,1kf'Q 1 I!<<II,, I,kg gf,,"

rig lh'I

,) jul l,"

<<III exei p

O g',k 8

ykc J

Qi <<

~,I",

Fi

4 h,"<<<< 'ffr;.> <c Fp I'l

'1 fh

'i>

1 gjf'f 1,

j" <<h<<

hL Fi III Ih i kf

>f I7 I,),

II,IIF,<<II I,

k I' $

h l

I 1(

<<fk<<

e e

I<<

f

,ft Ih hI V<<

, k kf

~

'l p

kf

~ )

I Ii i

I If

'4, j-'v I

f i (II Fi Ie fI 'g lf ll jfff i,k "I I~,', ll I,I h,'T l

'if if Jg p

.<<g) rF

, F

)I he

Carolina Power & Light Company MAR 07 1984 SERIAL:

NLS-84-101 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO+

1

DOCKET NO. 50-400 PRESERVICE INSPECTION PROGRAM

Dear Mr. Denton:

Carolina Power

& Light Company hereby submits additional information concerning the Shearon Harris Nuclear Power Plant (SHNPP) Preservice Inspection Program.

Attached is a copy of the SHNPP Preservice Inspection Program implementing procedure and applicable flow diagrams.

This information is in response to Safety Evaluation Report:

Open Item 6 from the Materials Engineering Branch.

If you have further questions or require, additional information,, please contact our staff.

'ours very truly, M. A. McDuffie Senior Vice President Nuclear Generation JHE/pgp (9614JHE)

Attachment Cct Mr. B.

C. Buckley (NRC)

Mr. G. F. Maxwell (NRC-SHNPP)

Mr. J.

P. O'Reilly (NRC-RII)

Mr. Travis Payne (KUDZU)

Mr. Daniel F.

Read (CHANGE/ELP)

Mr. M. R.

Hum (NRC-MTEB)

Chapel Hill Public Library Wake County Public Library Mr. Wells Eddleman Dr. Phyllis Lotchin Mr. John D. Runkle Dr. Richard D. Wilson Mr. G. 0. Bright (ASLB)

Dr. J.

H. Carpenter (ASLB)

Mr. J. L. Kelley (ASLB) 8403140i74 840307 PDR ADOCX 0@000400 8

tDR pgl i (0 411 Fayetteville Street o P. O. Box 1551 o Raleigh, N. C. 27602

i l

h~

p'j g

'l I

D 1

l N

f g f

4

PRC Government Infotlon Systems MEMORANDUM TO: Jeff Bartlett, DMB FROM: Robin Green, PRC SUBJ: Special Handling Packages

-(RIDS)

COPIES TO:

The attached Specfal Handling package, AH0.8 CPS/W+~+

and its oversized enclosures (maps, etc.)

have been completely processed per DMB's request.

If you have any questions concerning the above package please contact Robin Green at (ext-28641),

a NOTE-* If the total number of drawings exceed 25; the'aperture cards will be sent to you upon their coding completion, I

r RG/)lm 1500 Planning Research Drive, McLean, Virginia 22102 Telephone (703) 556-1500

~~

~

P'

SER OPEN ITEM N00 6

SER Section 5.2.4 6 6.6

~Oen Item:

Preservice/Inservice Inspection Program

~Res onse:

FSAR Sections 5.2.4 and 6.6 identify the criteria that are applicable to the Preservice Inspection Program.

The NRC, in SER Open Item No.

6 and in a request for additional information dated October ll, 1983, identified specific concerns regarding the implementation of CP&L's FSAR commitments related to the preservice inspection program.

In response to this request and the SER open item, CPSL is providing a copy of the preservice inspection program implementing procedure and a copy of the applicable flow drawings.

The attached procedure identifies the FSAR commitments, the section of the ASME Code that will be used to justify exemptions, examination procedures, evaluation criteria, records and reports, personnel qualifications, pre-examination requirements, calibration methods, and a detailed inspection plan summary.

Relief requests identified during the preservice inspections will be submitted to the NRC with the Inservice Inspection Program.

This submittal will be made subsequent to commercial operation of the unit.

The attached procedure is provided to illustrate the implementation of the preservice inspection program.

This procedure will be modified as required by changes to the design of the unit.

Such changes to the procedure will not be submitted to the NRC, but will be available for review on site.-

\\

er ~*