ML18018B533

From kanterella
Jump to navigation Jump to search
Forwards Response to Facility Staffing Survey,Per NRC 831209 Request.Operating Staff Not Finalized Since Fuel Load Not Scheduled Until June 1985
ML18018B533
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 12/16/1983
From: Cutter A
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
LAP-83-574, NUDOCS 8312290362
Download: ML18018B533 (10)


Text

>>> S Iiae ~ l I I "IRN" '"

t I Ni~l 1

I N GIN Ia ) lg '1 1 lvf" C

1 Pa 771t l

>>1 vr I >>I "I I >>

7

~ 7>>

I 1, vl fa," ",I l ~ r ~ ~

l "," >>7 I 7 7 '>>I'1>>>>>> <>1>>->> '1 ll,"') '

>> ~ >> ~

I I ~ ~

i)n 7 rl I i oui btli Itt' n kt 4c I I>> 1>>l >> ~

t" NI

>>7 y ~

I l 7>> I a>> l I I<'>>) i

~ )')a />>17>> Rl, >> >I ',I ", I 1IQ A< 1 ~ 'l J I '%II>>

~7 l T 9ll') ll "el, ) ~1>> I',3 l,al'

>>J '1 e>>1 fr>> NN '>>II ,) )" l il')a I j I/a ~

t," R 1 r I IN1 1)IN I vrR

>>>II 0

'Xaf.t u>>>>"

~ ',I II

')

va ~ I R N a

I  ! '>> '.r.uv, I

'l IIX '>>

)I

)'ue,'A 5 l ev" I Ia '>>Nlr C'7 7 i@i lcd ,gr 'tu, I ) Na I I

~ ) )>>I INI l

>>l l "I I)aadw l I,'al'Ia'~, II 1I e

R I Na lu RR I (x li l) g',I 0) II 1 y N " I Nyl>>',"

v 7 If >> II'N J)>> I 7 . 'l u I II "I';l N; ) < l I) l

@ME, LAP-83-574 1983'ERIAL:

Carolina Power 8 Light Company gag y 6 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS ~ 1 AND 2 DOCKET NOS ~ 50-400 AND 50-401 FACILTY STAFFING SURVEY

Dear Mr. Denton:

Per your request via letter from G. W. Knighton to E. E. Utley dated December 9, 1983, attached is the response to the Facility Staffing Survey.

The response portrays the Shearon Harris Nuclear Power Plant organization as it is currently envisioned, however, the scheduled fuel load date for Unit 1 is June 1985; therefore, our operating staff is not finalized as yet.

If you have any further questions, please do not hesitate to contact me ~ "'-

Yours very uly, A. B. Cutter Vice President Nuclear Engineering 6 Licensing GSC/cfr (9069GSC)

Cct Mr. B. C. Buckley (NRC) Mr. Wells Eddleman Mr. G. F. Maxwell (NRC-SHNPP) Dr. Phyllis Lotchin Mr. J. P. O'Reilly (NRC-RII) Mr. John D. Runkle Mr. Travis Payne (KUDZU) Dr. Richard D. Wilson Mr. Daniel F. Read (CHANGE/ELP) Mr. G. 0. Bright (ASLB)

Chapel Hill Public Library Dr. J. H. Carpenter (ASLB)

Wake County Public Library Mr. J. L. Kelley (ASLB) 83i2290362 83i2i6 PDR ADOCK 05000400

'DR 1i,, I Soa I A ~>>

I (

411 Fayetteville Street o P. O. Box 1551 o Raleigh, N. C. 27602

I I

e

~ ~

If

FACILITY STAFFING S URVEY PLANT SHNPP Anticipated Licensing Date 5/85 A>> OPERATING SHIFT

1. No. of Shifts: 6 planned
2. No. of ROs Assigned to Shift Work:* 12 (2/shift)

No. of Yrs. of Commercial RO experience on BWR PWR Hot plants (post-initial criticality): 0 0

3. No. of SROs Assigned to Shift Work:*~ 12 (includes shift foreman)

No. of Yrs of Commercial RO experience on BWR PWR Hot plants: 8 14 No. of Yrs of Commercial SRO experience on BWR PWR Hot plant's: 4 16

4. No. of SROs with 4-yr degrees: Non-engineering Engineering 0 0
5. , No. of Shift Foremen (SF) Non-engineering Engineering with 4-year degrees: 0 0 Note: SF is senior authority on shift work.
  • A11 previously licensed ROs non.on the'HNpp staff, are being trained to become SROs. Their experience is included in Item 3.
    • Includes all shift- operations personnel that CP&L plans to have SRO, except STAs.

8~ ON-S I TE MANAGEMENT Page 2 of 3.

Fl I I In Table (Use Appropriate Titles)

Operations Operations Ma I ntenance OA/q: Other STA Supervisor Mana er Plant M r. Mana er r M rs See To have license at time of OL Yes" Yes Yes No No Attach 2 Prevl cus ly I I censed No on No on RO/SRO Yes-SRO Yes RRO Ccmeercl a I P lant Commercial Plant T e Plant N/A BWR No. Years N/A No. Years "Hot" Exp.

with LI cense N/A See Oe reed Attach I Textl le Business EI ectr I ca I 1. Gen. Eng.

T pe (Olscl I Inc(s)) Te chnol Admi nl strati on En I neerln 2. Personnel M mt. None I ~ BS Level (A/8/M/D) BS BS BS 2 MS Other Nuclear Experience 5 yrs. Nuclear 6 yr. Nuc Navy 24 yrs. In Nuclear 20 yrs. In 15 yrs. Nuclear Sh I pyard 8 yrs. util lty Navy Nuclear Navy Shipyard 3 yrs. Ccmmrclal support and I yr. at Ccmaarclal 3.5 yrs. at 6 yrs, with AE Startup consultant on operating plant SHNPP by fuel as a gA/()C 4 yrs. Comnarcl al operator 3,5 yrs, at SHNPP I oad supervisor operating plant tral nl ng by fuel load 10 years as 2 5 yrs. at SHNPP CPCL manager by fuel load In Q

" Planned and tralnlng In (Gener a I progress but not a coen'ment. f Of I ce)

Page 3 of 3 CORPORATE NUCLEAR EXPERIENCE (I.e., "Off-Site" Management)

As of December 1983 Yrs. at Other Operator Lic. Yrs at Nuc. Support/ Degrees Years (If ever held) Oper. Nuc. Management Level Pos ltlon Name Nuc Nav RO/SRO/None Stations Position (A/B/M/D) Disci lines(s)

(On-Site) (Of f-Site)

(Indicate whether BWR or PWR)

Sr. VP M,A~ McDuf f le None 14 BS Civil Engineering Nuc. Gen.

VP - Harris" R~ A, Watson SRO 28 BS Nuclear Engineering Nuc. Plant MS Ph slcs VP- B. J. Furr SRO 10 BS Mech. Engineering Tech. Serv.

Sta. Nuc." L I ~ Lof I In 0 SRO 10 BS Electrical Engineering En . M r. BS Nuclear En lneerin Mgr. Nuc. W. J. Hurford None 28 BS Metallurgical Engrg.

Fuel De t. MS Industrial I mt.

VP - Nuc A. B. Cutter None .0 16 BS Chemical Engineering En . and Lic. MS Nuc. Science 8, En r .

M r. Nuc. Llc. S. R. Zlmmerman 6 None 14 BS En Ineerln Cor orate QA H. R. Banks 10 None N/A

" On-site

Attachnent 1 STAs eight total Two have previous experience in operating PNRs as STAs Three have masters degrees in nuclear engineering.

Two have bachelors degrees in electrical engineering.

One has a bachelors degree in mechanical engineering.

One has a bachelors degree in nuclear engineering.

One has a bachelors degree in aerospace engineering.

Attachnent 2 Manager nager Manager Tech. Su ort E&RC ~St ar tu To Have No No No License Previously No No No Licensed Degree Level BS BS BS Electrical General Electrical Engineering Engineering Engineering Masters Business Administration Other '

yrs. Nuclear 3 yrs. in startup 4 yrs. Nuclear Experience Navy of commercial Shipyard 9 yrs. with AE plant (BWR) 4 yrs. startup at doing both 6 yrs. at operating commercial BWR nuclear and commercial plant 2 yrs. at operating

-other AE work (BWR) commercial plant 1 yr. Nuclear 2 yrs. in startup 1 yr. at NSSS Utility Support of PWR supplier

.75 yr. at a 2.5 yrs. general 4 yrs. at SHNPP in Commercial Operat- office of TMI construction ing Plant la8 yrs. at SHNPP 4.5 yrs. in startup "3.5 yrs. at SHNPP by fuel load 'at SHNPP by fuel by fuel load load

Attachnent 2 (Cont'd)

Manager Administration To Have No License Previously No Licensed Degree Level BS Chemical Engineering MS Management Other 22 yrs. military engineering Experience 5 yrs. General Office Nuclear Support 1 yr. at commercial operating plant 6 yrs. at SHNPP by fuel load (9056NLU cfr)