ML18018B533
| ML18018B533 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 12/16/1983 |
| From: | Cutter A CAROLINA POWER & LIGHT CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| LAP-83-574, NUDOCS 8312290362 | |
| Download: ML18018B533 (10) | |
Text
>1 7
vr I >>I "I I >>
~
~
~ 7>>
I 1, vl l ","
>>7 I
7 7 '>>I'1>>>>>>
i)n 7
rl I i oui
<>1>>->> '1 ll,"')
>> ~ >>
I I>> 1>>l
~
t" NI
~ I I
~
~
>>7 y ~
I l I I<'>>)
i
~)')a
/>>17>>
Rl,
>> >I ',I I
1IQ A<
1
~
'l J I
'%II>>
7>>
I a>> l
~ 7 l
>>J '1 T9ll')
e>>1 I
ll"el, )
~1>>
fr>>
NN
'>>II t,"
R 1 r I IN1 1)IN I',3 l,al'
,) )" l il')a j I/a
~
R I
vr
>>>II 0 va ')
R I
'l
)'ue,'A 5 l ev" I Ia
'>>Nlr I ~ ) Na I I
) )>>I INI
>>l I)aadw l I,'al'Ia'~, II I Na
)I l
C'7 7
l"I 1I R
e N
a
'.r.uv, I i@i lcd IIX '>>
,gr 'tu, lu RR I
'Xaf.t u>>>>"
~ I
~ ',I II (x li l) y N
I Nyl>>',"
v 7
g',I If >> II'N 0)
II 1
J)>>
I 7
. 'l u I I I"I';l N; ) < lI) l
@ME, Carolina Power 8 Light Company gag y 6 1983'ERIAL:
LAP-83-574 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS ~
1 AND 2 DOCKET NOS ~ 50-400 AND 50-401 FACILTY STAFFING SURVEY
Dear Mr. Denton:
Per your request via letter from G.
W. Knighton to E. E. Utley dated December 9,
1983, attached is the response to the Facility Staffing Survey.
The response portrays the Shearon Harris Nuclear Power Plant organization as it is currently envisioned,
- however, the scheduled fuel load date for Unit 1
is June 1985; therefore, our operating staff is not finalized as yet.
me ~ "'-
If you have any further questions, please do not hesitate to contact Yours very
- uly, A. B. Cutter Vice President Nuclear Engineering 6 Licensing GSC/cfr (9069GSC)
Cct Mr. B. C. Buckley (NRC)
Mr. G. F. Maxwell (NRC-SHNPP)
Mr. J.
P. O'Reilly (NRC-RII)
Mr. Travis Payne (KUDZU)
Mr. Daniel F. Read (CHANGE/ELP)
Chapel Hill Public Library Wake County Public Library Mr. Wells Eddleman Dr. Phyllis Lotchin Mr. John D. Runkle Dr. Richard D. Wilson Mr. G. 0. Bright (ASLB)
Dr. J.
H. Carpenter (ASLB)
Mr. J.
L. Kelley (ASLB) 83i2290362 83i2i6 PDR ADOCK 05000400 1i,,
I A
'DR ~>>
Soa I
I
(
411 Fayetteville Street o P. O. Box 1551 o Raleigh, N. C. 27602
I I
e
~ ~
If
FACILITY STAFFING S URVEY PLANT SHNPP Anticipated Licensing Date 5/85 A>>
OPERATING SHIFT 1.
No. of Shifts:
6 planned 2.
No. of ROs Assigned to Shift Work:*
12 (2/shift)
No. of Yrs. of Commercial RO experience on Hot plants (post-initial criticality):
0 3.
No. of SROs Assigned to Shift Work:*~
12 (includes shift foreman)
No. of Yrs of Commercial RO experience on Hot plants:
14 No. of Yrs of Commercial SRO experience on Hot plant's:
16 4.
No. of SROs with 4-yr degrees:
Non-engineering Engineering 0
0 5.
, No. of Shift Foremen (SF) with 4-year degrees:
Non-engineering 0
Engineering 0
Note:
SF is senior authority on shift work.
A11 previously licensed ROs non.on the'HNpp staff, are being trained to become SROs.
Their experience is included in Item 3.
- Includes all shift-operations personnel that CP&L plans to have
8 ~
ON-S I TE MANAGEMENT Page 2 of 3.
Fl I I In Table (Use Appropriate Titles)
To have license at time of OL STA Yes" Operations Supervisor Yes Operations Mana er Yes Plant M r.
Ma I ntenance Mana er No OA/q:
Other r
M rs See Attach 2
No Prevl cus ly I I censed RO/SRO Yes-SRO Yes RRO No on Ccmeercl a I P lant No on Commercial Plant T
e Plant N/A BWR No. Years N/A No. Years "Hot" Exp.
with LIcense N/A Oe reed T pe (Olscl I Inc(s))
Level (A/8/M/D)
See Attach I Textl le Te chnol BS Business Admi nlstrati on BS EIectr I ca I En I neerln BS
- 1. Gen.
Eng.
- 2. Personnel M mt.
I~ BS 2
MS None Other Nuclear Experience
" Planned and tralnlng In progress but not a coen'ment.
5 yrs. Nuclear Sh I pyard 3 yrs. Ccmmrclal Startup 4 yrs.
Comnarcl al operating plant 2 5 yrs. at SHNPP by fuel load 6 yr.
Nuc Navy 8 yrs. util lty support and consultant on operator tral nl ng 24 yrs. In Nuclear Navy I yr. at Ccmaarclal operating plant 3,5 yrs, at SHNPP by fuel load 20 yrs. In Nuclear Navy 3.5 yrs. at SHNPP by fuel I oad 15 yrs. Nuclear Shipyard 6 yrs, with AE as a gA/()C supervisor 10 years as CPCL manager In Q (Gener a I Off I ce)
Page 3 of 3 CORPORATE NUCLEAR EXPERIENCE (I.e., "Off-Site" Management)
As of December 1983 Pos ltlon Name Years Nuc Nav Operator Lic.
(If ever held)
RO/SRO/None Yrs at Oper.
Nuc.
Stations Yrs. at Other Nuc. Support/
Management Position Degrees Level (A/B/M/D)
Disci lines(s)
(On-Site)
(Off-Site)
Sr.
VP Nuc. Gen.
M,A~ McDuffle None 14 BS Civil Engineering VP - Harris" Nuc. Plant R ~ A, Watson SRO 28 BS MS Nuclear Engineering Ph slcs VP-Tech. Serv.
B. J. Furr SRO 10 BS Mech. Engineering Sta.
Nuc."
En.
M r.
L I ~ Lof I In 0
SRO 10 BS BS Electrical Engineering Nuclear En lneerin Mgr. Nuc.
Fuel De t.
W. J. Hurford None 28 BS MS Metallurgical Engrg.
Industrial I mt.
VP - Nuc En. and Lic.
A. B. Cutter None
.0 16 BS MS Chemical Engineering Nuc. Science 8, En r.
M r. Nuc. Llc.
S. R. Zlmmerman 6
None 14 BS En Ineerln Cor orate QA H. R. Banks 10 None N/A
" On-site
Attachnent 1
STAs eight total Two have previous experience in operating PNRs as STAs Three have masters degrees in nuclear engineering.
Two have bachelors degrees in electrical engineering.
One has a bachelors degree in mechanical engineering.
One has a bachelors degree in nuclear engineering.
One has a bachelors degree in aerospace engineering.
Attachnent 2
Manager Tech.
Su ort nager E&RC Manager
~St ar tu To Have License No No No Previously No Licensed No No Degree Level BSElectrical Engineering BS General Engineering Masters Business Administration BSElectrical Engineering Other Experience yrs. Nuclear Navy 9 yrs. with AE doing both nuclear and
-other AE work 1 yr. Nuclear UtilitySupport
.75 yr. at a
Commercial Operat-ing Plant "3.5 yrs. at SHNPP by fuel load 3 yrs. in startup of commercial plant (BWR) 6 yrs. at operating commercial plant (BWR) 2 yrs. in startup of PWR 2.5 yrs. general office of TMI la8 yrs. at SHNPP by fuel load 4 yrs. Nuclear Shipyard 4 yrs. startup at commercial BWR 2 yrs. at operating commercial plant 1 yr. at NSSS supplier 4 yrs. at SHNPP in construction 4.5 yrs. in startup
'at SHNPP by fuel load
Attachnent 2 (Cont'd)
Manager Administration To Have License No Previously Licensed No Degree Level BS Chemical Engineering MS Management Other Experience 22 yrs. military engineering 5 yrs. General Office Nuclear Support 1 yr. at commercial operating plant 6 yrs. at SHNPP by fuel load (9056NLU cfr)