ML18018B520

From kanterella
Jump to navigation Jump to search
Forwards Survey to Assist in Developing Staffing Profile That Should Be in Place at Time OL Obtained.Completed Forms Due No Later than 831216
ML18018B520
Person / Time
Site: Harris  
Issue date: 12/09/1983
From: Knighton G
Office of Nuclear Reactor Regulation
To: Utley E
CAROLINA POWER & LIGHT CO.
References
NUDOCS 8312160326
Download: ML18018B520 (6)


Text

Docket Nos.:

50-400 and 50-401 Mr. E.

E. Utley Executive Vice President Power Supply and Engineering and Construction Carolina Power 5 Light Company Post Office Box 1551 Raleigh, North Carolina 27602

Dear Mr. Utley:

DISTRIBUTION ~

~Document=-Cont~ x(50=400/401=-)i NRC PDP L PDR NSIC PRC System LBP3 Reading JLee BBuckley GWKnighton Th)Noyak

Attorney, 0ELD ELJordan;IE JMTaylor: IE QCRS

(,16)

Subject:

Facility Staffing Survey - Shearon Harris, Units 1 and 2

The attached survey has been prepared to assist in developing the expected staffing profile that will be in place for your facility at the time you are ready to obtain an operating license.

We request that you fill in the blanks with the best information available and r,~turn the completed form by December 16, 1983.

If any of the requested

".nformation is not available, please indicate the date when it can be provided.

If you have any questions regarding this request, please contact the NRR staff Licensing Project Manager o

Attachment:

As stated O).U1;.;.;~g.".CJ~ b):

George N. Kaipheon George H. Knighton, Chief Licensing Branch No.

3 Division of Licensing cc:

See next page 83i2ih0326 83i209 PDR ADGCK 05000400 A

, PDR L

)

OFFICED SURNAME/

I~ i@83 oATE h Di

~

BBu ley:ft

~ o ~ o ~ ~ too

~ o ~ ~ ~ ~ O

~ ~ ~ ~ ~ ~

J

~

~

~ ~

~ ~t ~ ~ ~ ~ ~ ~ ~t ~otto

~ ~ ~ ~ ~

GWY6> gh on

~ o ~ o ~\\ ~\\otto ~ o ~toot ~ o

~ ~ r

~

~ oooooo ~ oooo

~ ~ ~ ~ ~ ~ ~ ~ ~t ~ o ~ ~ o ~t ~ ~ t ~t

~ ~

~t ~t ~t ~ ~t ~ o ~t ~t ~t ~t ~ ~

NRO FOAM 318 (10-80) NRCM 0240 OFFlClAL RECORD COPY USGPO: 1981~960

Mr. E.

E. Utley Executive Vice President Power Supply and Engineering and Construction Carolina Power 5 Light Company Post Office Box 1551

Raleigh, North Carolina 27602 George F. Trowbridge, Esq.

Shaw, Pittman, Potts 5 Trowbridge 1800 M Street, NW Washington, DC 20036 Richard E. Jones, Esq.

Associate General Counsel Carolina Power 5 Light Company 411 Fayetteville Street Mall Raleigh, North Carolina 27602 M. David Gordon, Esq.

Associate Attorney General State. of North Carolina Post Office Box 629

Raleigh, North Carolina 27602 Thomas S. Erwin, Esq.

115 W. Morgan Street Raleigh, North Carolina 27602 Mr. George Maxwell Resident Inspector/Harris NPS c/o U.S. Nuclear Regulatory Commission Route 1,

Box 315B New Hill, North Carolina 27562 Char 1 es D. Barham, Jr.,

Esq.

Vice President 5 Senior Counsel Carolina Power 5 Light Company Post Office Box 1551

Raleigh, North Carolina 27602 Mr. John Runkle, Executive Coordinator Conservation Council of North Carolina 307 Granville Road Chapel Hill, North Carolina 27514 Mr. Wells Eddleman 718-A Iredell Street Durham, North Carolina 27705 Shearon Harris Mr. George Jackson, Secretary Environmental Law Project School of Law, 064-A Univeristy of North Carolina Chapel Hill, North Carolina 27514 Dr. Phyllis Lotchin 108 Bridle Run Chapel Hill, North Carolina 27514 Mr. Travis Payne, Esq.

723 W. Johnson Street Post Office Box 12643 Raleigh, North Carolina 27605 Mr. Daniel F.

Read, President CHANGE Post Office Box 524
Raleigh, North Carolina 27514 Bradley W. Jones, Esq.

U.S. Nuclear Regulatory Comm.

Region II 101 Marietta Street Atlanta, Georgia 30303 Richard D. Wilson, M. D.

725 Hunter Street Apex, North Carolina 27502 Regional Administrator - Region II U.S. Nuclear Regulatory Commission 101 Marietta Street Suite 3100

Atlanta, Georgia 30303 Karen E. Long, Esq.

Staff Attorney Public Staff -

NCUC Post Office Box 991

Raleigh, North Carolina 27602

Dr. Linda Little Governor's Waste Nanagement Board 513 Albemarle Building 325 North Salisbury Street Raleigh, North Carolina 27611

~age l of 3

FACILITY STAFFING SURVEY A.

OPERATING SHIFT 1.

No. of Shi fts PLANT Anticipated Licensing Date 2.

No. of ROs Assigned to Shift Work No. of Yrs. of Commercial RO experience on Hot plants (post-initial criticalitv) 3.

No. of SROs Assigned to Shift Work No. of Yrs of Commercial RO experience on Hot plants No. of Yrs of Commercial SRO experience on Hot plants 4.

No. of SROs 'with 4-yr degree's 5.

No. of Shift Supervisors (SS)

Won-enaineering Non-engineering Engineering Engineering Note:

SS is senior authority on shift work.

0.

OH-SITE HANA491EHT Page 2 of: 3 Fill in Table (Use Appropriate Titles)

STA To have license at time of OL Operations Su ervisor Assistant Plant H r.

Plant M r.

Maintenance Mana er QA/QC H r Previously licensed RO/SRO Type Plant Wo. Years flo. Years "Hot" Exp.

Degreed Type.(Discipline(s))

Level (A/0/H/D)

Page 3 of 3

C.

CORPORATE NUCLEAR EXPERIENCE

~i.e.,

- ate anagv~i~nt J POSITION*

NAME NUC NAVY

~

~

Operator Lic.

Yrs. at (if ever held)

Oper.

Nuc.

RO/SRO/None Stations Yrs. at Other Nuc. Support/

Management Position Degrees Level (A/0/M/D)

Disci line(s)

VP Div VP Tech Serv kg r Maint Mgr Oper Hgr Asst VP Sta Nuc Eng Mgr Dir Nuc fuel Ser Dir t5uc Lic QC/QA Hqr Other rs ndicate wh.ther BWR or n-1 e

1 e

(I PWR)

'Position titles shown are illustrative; please enter appropriate titles