Forwards Response to Draft SER Open Item Re Svc Water Sampling,Raised by Meteorological & Effluent Treatment Branch.Svc Water Sys Will Be Modified to Include Liquid Radiation Monitor Downstream of All Inputs to Sys
ML18018B485
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 11/22/1983
From: Mcduffie M
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
LAP-83-539, NUDOCS 8311300141
Download: ML18018B485 (6)


Text

REGULATORY ORMATION DISTRIBUTION SYS 1

(RIDS)

'ACCESSION NBR:8311300141 DOC ~ DATE: 83/11/22 NOTARIZED: NO.

FACIL:50 400 Shearon Harris Nuclear Power Planti Unit 1i Caqolina 50-401 Shearon Harris Nuclear Power Plant~ Unit 2~ Carolina AUTH BYNAME AUTHOR AFFILIATION MCDUFFIE~M+A~

Car ol ina Power L Light Co ~

RECIP, NAME RECIPIENT AFFILIATION DENTONiH.Ro Office of Nuclear Reactor Regulationi Director

SUBJECT:

Forwards response to draft SER open item re svc water samplingrraised by Meteorological 8 Effluent Treatment Branch,Svc water sys will be modified to include liquid radiation monitor downstream of all inputs to sys.

DISTRIBUTION CODE:

8001S COPIES RECEIVED:LTR, ENCL SIZEe

(

TITLE: Licensing Submittal:

PSAR/FSAR Amdts 8, Related Correspondence NOTES:

DOCKET 05000400 05000401 RECIPIENT ID CODE/NAME NRR/DL/ADL NRR LB3 LA INTERNAL: ELD/HDS1 IE/DEPER/EPB 36 IE/DEQA/QAB 21 NRR/DE/CEB

, 11 NRR/DE/EQB 13 NRR/DE/MEB 18 NRR/DE/SAB 24 NRR/DHFS/HFEB45 NRA/DHFS/PSRB NRR/DSI/AEB 26 NRR/DSI/CPB 10 NRR/DSI/ICSB 16 NRR/DSI/PSB 19 NRR/DS I/RSB 23 RGN2 EXTERNALS ACRS 41 DMB/DSS (AMDTS)

LPDR 03 NSIC 05 COPIES LTTR ENCL 1

0 1

0 1

0 3

3 1

1 2

2 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 3

3 6

6 1

1 1

1 1

1 RECIPIENT ID CODE/NAME NRR LB3 BC BUCKLEYgB 01 IE FILE IE/DEPER/IRB 35 NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB 28 NRR/DE/NTEB 17 NRR/DE/SGEB 25 NRR/DliFS/LQB 32 NRR/DL/SSPB NRR/DSI/ASS NRR/DS I/CSB 09 NRR/DSI/METB 12 W'DYE-B 22 G

F ILE 04 RM AMI /MIB BNL(AMDTS ONLY)

FEMA REP DIV 39 NRC PDR 02 NTIS COPIES LTTR ENCL 1

0 1

1 1

1 1

1 1

0 1

2 2

1 1

1 1

1 1

0 1

1 1

1 1

1 1

1 1

1 1

0 1

1 1

1 1

1 1

1 TOTAL NUMBER OF COPIES REQUIRED'TTR 53 ENCL 46

W

~ W f I I

~

'I f ),f II h

4

)

ll

')W

)

lI W>f

) If )

fh

  • 'f~

~

~

I.W 1l

. I '

It W f iI gS g I) W;,"

IWtw'),')

f WIWF)

I ll WI f g

'WV' W 'f f II I )

CW I

,I'I N

II W

W, f f)fli I

h

)

W

) J WW

0 Carolina Power & Light Company NOV a~ 1983 SERIAL:

LAP-83-539 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS.

1 AND 2 DOCKET NOS ~ 50-400 AND 50-401 DRAFT SAFETY EVALUATION REPORT

RESPONSE

METEOROLOGICAL AND EFFLUENT TREATMENT BRANCH

Dear Mr. Denton:

Carolina Power

& Light Company (CP&L) hereby transmits one original and forty copies of a response to a Shearon Harris Nuclear Power Plant Draft Safety Evaluation Report Open Item.

This item deals with a question, relative to service water sampling, asked by the Meteorological and Effluent Treatment Branch.

We willbe providing,responses to other Open Items in the Draft Safety Evaluation Report shortly.

83ii OCR, 05000400 300i41 831122 PDR ADO E

Yours very truly, 32k~

M Ai McD ffi Senior Vice President Nuclear Generation FXT/ccc (8534FXT)

Attachment cct Mr. B. C. Buckley (NRC)

Mr. N. Wagner (NRC)

Mr. G. F. Maxwell (NRC-SHNPP)

Mr. J.

P. O'Reilly (NRC-RII)

Mr. Travis Payne (KUDZU)

Mr. Daniel F.

Read (CHANGE/ELP)

Mr. R. P. Gruber (NCUC)

Chapel Hill Public Library Wake County Pub lie Library Mr. Wells Eddleman Dr. Phyllis Lotchin Mr. John D. Runkle Dr. Richard D. Wilson Mr. G. 0. Bright (ASLB)

Dr. J.

H. Carpenter (ASLB)

Mr. J. L. Kelley (ASLB) oi 411 Fayetteville Street

~ P. O. Box 1551 o Raleigh, N. C. 27602 l \\

K 4" ~ "}

II \\ ~

't I

Shearon Harris Nuclear Power Plant Draft SER Open Item Revised Res onse This is a revised response to Item 14 from Carolina Power 6 Light's September 21, 1983 submittal.

The previous response committed to weekly sampling of the service water system for radioactivity.

This commitment is acceptable only if the following additional items are addressed as appropriate for the component cooling water (CCW) system, waste processing closed cooling water (WPCCW) system, and service water (SW) system:

1.

Weekly sample and analysis of the

CCW, WPCCW, and SW systems.

Daily sampling and analysis of the CCW system and service water system if the CCW monitor is inoperable.

Daily sampling and analysis of the WPCCW system and service water system if the WPCCW monitor is inoperable.

2.

Daily sample and analysis of the service water discharge when the CCW or WPCCW concentration is > 10 pCi/cc.

3.

Sampling and analysis of the service water once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> when the activity level in the CCW (or WPCCW) is > 10 iCi/cc and leakage is confirmed from the CCW (or WPCCW) to the service water system.

4.

Installation of a rate-of-change alarm which will indicate a decreasing liquid g evel in the CCW or WPCCW head tank based upon detecting an LLD-10 PCi/ cc.

~Res oese The design of the service water system willbe modified to include a liquid radiation monitor downstream of all inputs to the system.

The added monitor obviates the need for sampling of the service water system outlined in the NRC's position.

Sampling of the service water system will be performed when the radiation monitor is out of service.

The sampling frequency willbe addressed in the SHNPP Technical Specifications.

(8528NLU cfr)