Forwards Amend 9 to FSAR
ML18018A704
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 08/18/1983
From: Mcduffie M
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML18018A705 List:
References
LAP-83-239, NUDOCS 8308240240
Download: ML18018A704 (10)


Text

I I'EGULATORY FORMATION DISTRIBUTION SY M (RIDS) p4r ACCES8ION NBR:8308240240 DOO.DATE: 83/08/18 NOTARIZED:

YES DOCKET 0

,FACIL:50 400 Shearon Harris Nuclear Power Planti Unit ii'Carolina 05000400 50-401 Shearon Harris Nuclear Power Planti Unit 2E Carolina 05000401 AUTHiNAME AUTHOR AFFILIATION MCDUFFIE<M,A, Car ol ina Power 5 Light Co.

'RECIP ~ NAME RECIPIENT AFFILIATION DENTONiH ~ RE 0 fice of uclerL Reacton Regulationr Director

/- S Z'arear SUBJECT; For wards mend to F

AR ~

DISTRIBUTION CODE:

B0010 COPIES RECEIVEDtLTR,J ENCL,@SSIZE: /+A~

TITLE: Licensing Submi ttal:

PSAR/FSAR Amdts L Related Cor respondence NOTES:

RECIPIENT ID CODE/NAMiE NRR/DL/ADL NRR L83 LA INTERNAL: ELD/HDS1 IE/DEPER/EPB 36 IE/DEQA/QAB 21:

NRR/DE/CEB 11 NRR/DE/EQB 13 NRR/DE/MEB 18 NRR/DE/SAB 24 NRR/DHFS/HFE840 NRR/DHFS/PSRB NRR/DS I/AE8 26 NRR/OSI/CPB 10 NRR/DSI/ICSB 16 NRR/DS I/PSB 19 NRR/DS I/RSB 23 RGN?

EXTERNALe ACRS DMB/OSS (AMDTS)

I PDR 03-NSIC 05 COPIES LTTR ENCL 1

0 0

1 0

3 3

1 1

1 2

2 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

3,'

6 1

1 1

1 1

1 RECIPIENT ID CODE/NAME NRR LB3 BC BUCKLEYiB 01 IE FILE IE/DEPER/IRB 35 NRR/DE/AEAB NRR/DE/EHEB NRR/OE/GB 28 NRR/OE/MTEB 17.

NRR/DE/SGEB

?5

.NRR/DHFS/LQB 32 NRR/DL/SSPB NRR/DS I/ASB NRR/OS I/CSB 09 NRR/DSI/METB 12 N

8 22 E

FI E

04 BNL(AMDTS ONLY)

FEMA"REP DIV 39 NRC POR 02 NTIS COPIES LTTR ENCL

.0 1

1 1

1

,1

.1 0

1 1

2 2

1 1

1 1

1 1

0 1

1 1

1 1

1 1

1 1

1 0

1 1

1 1 1 1 1

1

'TOTAL NUMBER OF 'OPIES REQUIRED:

LTTR '3 ENCL 46

ft t<<

f w

~

~

t I<<

'I

~

\\

w I I

Ir

,)h,

'I w

w

C%QE, Carolina Power & Light Company auG aS >983 SERIAL:

LAP-83-239 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS.

1 AND 2 DOCKET NOS. 50-tl00 AND 50-tl01 FINAL SAFETY ANALYSIS REPORT AMENDMENT 9

Dear Mr. Denton:

Carolina Power

& Light Company (CP8L) hereby transmits"three (3) originals and sixty (60) copies of Amendment 9 to the Shearon Harris Nuclear Power Plant (SHNPP) Final Safety Analysis Report (FSAR).

This information is being submitted in response to discussions held at 'the Instrumentation and Control Systems Branch (ICSB) meetings of August 16-19, 1982 and September 1ti-16, 1982 and the Mechanical Engineering Branch (MEB) meeting of February 1-3, 1983.

Commitments from the ICSB and MEB meetings are documented in CP&L letters dated September 30, 1982 and March 16, 1983.

In order to facilitate NRC staff review of this Amendment, a table is provided as Attachment 1.

This table lists the Safety Review Question (SRQ) number (where applicable),

the CP&L Draft Safety Evaluation Report (DSER)

Open Item number (where applicable),

and the FSAR Sections amended.

Except for corrections of minor typographical errors, this table contains all changes made in this Amendment.

Additionally, Sections 2.5E and 2.5F of the FSAR have been replaced by the permanently bound final reports entitled "Final Geologic Report on Foundation Conditions Power Plant,

Dams, and Related Structures" and "Final Embankment Report Main Dam, Auxiliary Dam, and Auxiliary Separating Dike,"

and this is reflected in the Amendment instruction sheets.

These final reports are being sent to you under separate cover.

Each revised page bears the amendment number.

Only those changes which are technical in nature are indicated by vertical bars.

Instructions for entering the revised pages are included.

8308240240 830818 PDR ADOCK 05000400 PDR 411 Fayettevllle Street o P. O. Box 1551 o Raleigh, N. C. 27602

l

- V ll CPQ'f 8 ) Qil,~III 4

II h

(I II)

~liI I

I ii I'

ll e

1I Jp

/>

<g ti,rt.

1 pCII l,l I f

~

II

~ J l I

t wI,<t

'i

'I I

I'

~ I")

pil II al gy f)(

I'i 1'l I

~ t

'I I

I,I I.'

I I

II I,*

iI Il1I,l I,

'I

'I l

H. R. Denton As required by Commission Regulations, this Amendment is signed under oath by a duly author ized officer of CPAL. If you have any questions concerning this Amendment, please contact our staff.

Yours very truly, JHE/cfr (7092JHE)

M. A. McDuffie Senior Vice President Engineering 5 Construction CC:

Mr. E. A. Licitra (NRC)

Mr. H. C. Li (NRC)

Mr. G. F. Maxwell (NRC-SHNPP)

Mr. J.

P. O'Really (NRC-RII)

Mr. David Terao (NRC)

Mr. Travis Payne (KUDZU)

Mr. Daniel F.

Read (CHANGE/ELP)

Chapel Hill Public Library Wake County Public Library Mr. Wells Eddleman Dr. Phyllis Lotchin Mr. John D. Runkle Dr. Richard D. Wilson Mr. G. 0. Bright (ASLB)

Dr. J.

H. Carpenter (ASLB)

Mr. J. L. Kelley (ASLB)

M. A. McDuffie, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief; and that the sources of his information are

officers, employees and agents of Carolina Power 4 Light Company.

My Commission Expires:

()N 04 /986 Notary

( eal)

Ol

', IIII o'

y 'o y~O F 0

'(QTARQ BL[C:

~

~

~o,

',r,"~Cpu@<

'pi~

/gi

I I%

I P)P fj 100$ I'I' 0 fj 0

lj'I 0

l 4

0 pj 0

0 jj 4

0 0

0 0

IIIl Wii'fI viif) jj tfj fJU 'l>>

I

'(P'

INDEX OF DRAFT SAFETY EVALUATIONREPORT (DSER)

OPEN ITEM RESPONSES, ASSOCIATED FINAL SAFETY ANALYSIS REPORT (FSM),

SAFETY REVIEW QUESTIONS (SRQ),

AND FSAR LOCATIONS Mechanical En ineerin Branch Items 0 en Item No.

FSAR SR No.

FSAR Sections Amended 243 244 248 250 251 252 253 254 257 261 262 265 267 270 271 272 273 274 275 276 210. 01 210.02 210. 06 210.08 210. 09 210.10 210 11 210.12 210. 15 210.19 210. 20 210.23 210. 25 210.28 210. 29 210.30 210. 31 210.32 210 33 210.34 Table 3.2.1-1, Notes to Table 3.2.1-1 Table 3.2.1-1 3.6.1.3 3.6.2.1.1.2 3.6.2.1.1.3 3.6.2.1.4, 6.6.8, Figure 3.6.2-1 3.6.2.1.4, 6.6.8, Figure 3.6-2-1 3.6.2.2.1, Figures 3.6A-l thru -27 3.6.2.3.4.2 Table 3.6.2-2 Tables 3.6A-15, 3.6A-16, 3.6A-17.1, 3.6A-17.2, 3.6A-17.3, and 3.6A-18, Figure 3.6A-1 3.7'.F 1 3.7.3.8.1, Figure 3.7.3-1 Tables 3.9.1-2 and 3.9.1-3 3.9.1.2.2 3.9.1.2.2 3.9.1.4.7 3.9.2.1.1, 3.9.2.1.3, 14 2.12.1.12 3.7.3.1.1, 3.7.3.9.1, 3.7.3.9.2 1.8

FSAR SR No.

FSAR Sections Amended 277 280 281 284 286 343 210.35 210.38 210.39 210. 42 210.44 210. 46 3.9.3.1, Table 3.9.3-7 Tables 3.9.3-10 and 3.9.3-11 Appendix 3.9A Table 3.9.3-1 3.9.6.2 Table 3.9.3-7 Instrumentation and Control S stem Branch Items 0 en Item No.

FSAR SR No.

FSAR Sections Amended 79 88 91 95 92 ICSB-2 ICSB-2 (a)

ICSB-2(b)

ICSB-23 7.2.1.1.2 (e) 8.3.1.1.2.4 7.3.2.1, Section 7.3 References THI II.F.1 TNI II.D.3 7.3.1.3.3, 10.4.9 Tables 7.1.1-1, 7.4.1-2, and l0.4.9-2, Figures 7.3.1-9; 7.3.1-9a, 7.3.1-9b, and 7.3.1-10 101 82 ICSB-6 ICSB-11 ICSB-12 ICSB-13

-ICSB-14 ICSB-15 ICSB-16 ICSB-17 ICSB-18 7.7.1.11 Table 3.2.1-1, Notes to Table 3.2.1-1 Figures 7.2.1-1 and 7.3.1-1 7.2.1.1.2 (i)

Figure 7.2.1-1 sh 2

Figure 7.2.1-1 sh 8 7.3.1.3.2, 7.3.1.5.7 7.3.1.3.2, Figure 7.2.1-1 sh 8 7.4.1.11, Figure 7.4.1-8

~

~

e en Item No.

FSAR SR No.

FSAR Sections Amended 78 77 ICSB-19 ICSB-19(d)

ICSB-20 ICSB-21 ICSB-22 ICSB-24 7.2.1.1.2 (f), Table 7.3.1-4, Figure 7.3.1-1 sh 5, 6

8.3.1.2.30 7.3.2.3 7.2. 1. 1.2 (f), Figure 7.3.1-1 sh 7

14. 2. 12. 1. 10 7.3.1.3.3, 7.4.1.3, 7.5.1.3.5 Tables 7.4.1-1 and 7.5.1-2 97 80 ICSB-27 ICSB-30 ICSB-46 ICSB-47 ICSB-48 ICSB-49 ICSB-57 Figure 7.3.1-17 6.5.2.2, 6.5.2.5, Table 7.5.1-1 6.2.2.2.2.2, 6.2.2.3.2 7.5.1.9 8.3. 1. 2. 30 5.4.7.1 6 3.5.5.1, 6.3.2.2.9.6 7.3.1.2, 7.3.1 3.2, 7.3.1.3.4, 7.3.1.5.7, Table 7.3.1-3 (7 481NLUlcv)