Forwards Response to Matls Engineering Branch Draft SER Open Item 36 Re Beltline Matl Test Requirements of 10CFR50,App G, Paragraph III.C.2
ML18018A582
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 07/01/1983
From: Mcduffie M
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
LAP-83-244, NUDOCS 8307060163
Download: ML18018A582 (6)


Text

REOULATOPQXNFORMATION DISTRIBUTION TEM (RIDE)

ACCESSION NBR:8307060163 OOC ~ DATEt 83/07/01 NOTARIZED; NO FACIL:50-000 Shearon Harris Nuclear Power Plant<

Uni't ii Carolina 50-001 Shearon Harris Nuclear Power Planti Unit 2i Carolina AUTH,NAME AUTHOR AFFILIATION MCOUFFIEiMBA~

Carolina Power S Light Co, AECLP ~ NAME RECIPIENT AFFILIATION D~NTONzH ~ RE Office of Nuclear Reactor RegulationE Director DOCKET i'5000400 05000401

SUBJECT:

Forwards response to Matls Engineering Br anch dr af t SER Open Item 36 re beltline matl test requirements of 10CFR50<App Gi Paragraph III',C<2~

DISTRIBUTION CODE:

8001S COPIES RECEIVED;LTR ENCL SIZE ~.

I t

TITLE: Licensing Submittal PSAR/FSAR Amdts 8, Related Correspondence'

'OTES:

RECIPIENT IO CODE/NAME NRR/DL/ADL NRA L83 LA INTERNAL: ELD/HDS1 IEPDEPER/EPB 36 IE/DEQA/QAB 21 NRR/DE/CEB 11 NRR/DE/EQB 13 NRR/DE/HEB 18 NRA/OE/SAB 24 NRR/OHFS/HFEB40 NRR/DHFS/PSRB NRR/DSI/AEB 26 NRR/Osl/cPB 10 NRR/OSI/ICSB 16 NRA/DSI/PSB 19 NRR/DSI/RSB 23 RGN2 EXTERNAL! ACRS 41 DMB/DSS (AMDTS)

LPOR 03 NSIC 05 COPIES LTTR ENCL 0

1 0

1 0

3 3

1 1

1 1

2 2

i 1

1 1

1 1

1 1

1 1

1 1

1 1

3 e

6 1

1 1

1 1

RECIPIENT IO CODE/NAME NRR LB3 BC KAOAMBIiP 01 IE F ILE IE/DEPER/IRB 35 NRR/DE/AEAB NRR/DE/EHEB NRR/OE/GB 28 NRR/DE/ATES 17 NRR/DE/SGEB 25 NRR/DHFS/I QB 32=

NRR/OL/SSPB NRR/DS I/ASB NRR/DSI/CSB 09 NRR/DSI/METB 12 N

DSI RAB 22 FXL 0O RM/DDAMI/MI8 BNL (AMDTS ONlY)

FEMA REP DIV 39 NRC PDR 02 NTIS COPIES LTTR ENCL 1

0 1

1

-1 1

1 1

O 1

2 1

1-1,1 1

0 1

1 1

1 i

1 1

i 1

0

=1 1

1 1

1 1

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 53 ENCL tl6

s~)>>zr f

W H

f I-lk i lju II H '

'l$

Ng

'I

'3f f p'I ry9g) 7 e

~

H t

HH ~ 'i

'lpf

'ifI',Pr>>ll 0

g

<H f SI

<<p~

9c.

<s0 r.','ill H

H 1 5

'H I

>fp 4

HtH

)y f lip lf

" "H'll

)ul f I,Hgr)qg 1

H) f fH Hu 0 H l I Hler r>>

I f IIIIII-Q,p II) 'H'3 u

<HN 1 )

I g,

f,9p t

'ggHH,',Hf.'4" I pf I 'III u

~

f f)rig j,) J

~If f f

NIl II tr HH f

f

$ $ 'l

,i "ll-Irq

'[

Q ru', HH "I

H) 5

&H H,

Ht la

, +r

,H, X J(

( f f

)r)mls 1

1 pl f I

I I f p

C%Q.E, Carolina Power & Light Company JUL 01 f983 SERIAL:

LAP-83-2 i4 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS.

1 AND 2 DOCKET NOS-50-400 AND 50-401 DRAFT SAFETY EVALUATION REPORT RESPONSES MATERIALS ENGINEERING BRANCH

Dear Mr. Denton:

Carolina Power

& Light Company (CP&L) hereby transmits one original and forty copies of the response to the Shearon Harris Nuclear Power Plant Draft Safety Evaluation Repor t (DSER)

CP&L Open Item 36.

Carolina Power

& Light Company will be providing responses to other Open Items in the DSER shortly.

Yours very truly, PS/kyar (7097PSA)

Attachment M. A. McDuffie Senior Vice President Engineering

& Construction Cc1 Mr. B. J. Elliot (NRC-MTEB)

Mr. N. Prasad Kadambi (NRC)

Mr. G. F. Maxwell (NRC-SHNPP)

Mr. J.

P. O'Reilly (NRC-RII)

Mr. Travis Payne (KUDZU)

Mr. Daniel F.

Read (CHANGE/ELP)

Chapel Hill Public Library Wake County Public Library Mr. Wells Eddleman Dr. Phyllis Lotchin Mr. John D. Runkle Dr. Richard D. Wilson Mr. G. 0. Bright (ASLB)

Dr. J.

H. Carpenter (ASLB)

Mr. J. L. Kelley (ASLB) 83070b01b3 830701 PDR ADOCK 05000400 E

PDR 411 Fayettevllle Street o P. O. Box 1551 o Raleigh, N. C. 27602 i

0 C

V

Shearon Harris Nuclear Power Plant Draft Safety Evaluation Report (DSER)

Materials Engineering Branch 0 en Item 36 (DSER Section 5.3.1.2 a es 5-12 and 5-19)

To demonstrate compliance with the beltline material test requirements of Paragraph III.C.2 of Appendix G, 10 CFR 50:

Indicate the post-weld heat treatment used in the fabrication of the beltline production and test welds.

Indicate the plates used to fabricate the test welds.

Indicate whether the test specimens for the beltline weld seams were removed from excess material in the vessel shell course following completion of the weld joint.

~Res esse The post weld heat treatment used in fabrication of the beltline production and test welds is as follows:

Production Weld Test Meld Unit 1

Unit 2 1150'F 10-1/4 Hr-'FC 1150'F 9 Hr-FC 1150'F 10 Hr-PC 1150'F 9-1/2 Hr-PC Plates used to fabricate test welds are as follows:

Unit 1 Plate B4197-2 and A9153-1 Unit 2 Plate B4197-1 and A9154-2 Test specimens for beltline weld seams were removed from a separate weldment since the same welding process was used for longitudinal and circumferential welds in the plates.

The same weld procedure was used in fabricating the production welds and test weld.

The following weld parameters were used to fabricate the welds.

Single Mire+

3/16" dia.

RACD INMM 550-650 Tandem Wire (head) 3/16" dia.

RACD INMM 650-750 (trail) 3/16" dia.

RACD INMM 550-650 Electrode Current Submer ed Arc Weld Size

~e

~(an s)

Voltage (Volts) 28-32 32-36 34-37 Travel (1

PM) 10-18 24 (Min.)

  • Single wire used until joint was wide enough for tandem wire welding.