Responds to Draft SER Open Item 10 Re Meteorological Instrumentation.Util Will Complete Review of Emergency Plan During Emergency Preparedness Implementation Appraisal
ML18018A574
Person / Time
Site: Harris  
Issue date: 07/01/1983
From: Mcduffie M
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
LAP-83-277, NUDOCS 8307060114
Download: ML18018A574 (6)


Text

"!: ~

REGULATORINFORMATION DISTRIBUTION TEM (RIDE)

ACCESSION NBR e 8307060 1 14 DOC N DATE 83/07/0 1 NOTARIZED

.- NO FACIL:50 000 Shearon Harris Nuclear Power Plantg Uni,t lg Carolina 50<<001 Shearon Harris Nu'clear power PlantE Uni,t 2i 'Carolina-AUTH,NAME

'UTHOR AFFILIATION MCDUFFIE, M ~ A, Carolina I ower L L'ight Co, RECIP'B NAME RECIPIENT AFFILIATION DENTONgH ~ RE Office of Nuclear Reactor Regulationi Director DOCKET 05000400 05000401-SUBJECT; Responds to dr af t SER Open Item 10 r e meteoro 1 ogi cal instrumentation,Util, will complete review of emergency. plan during, emergency preparedness implementation appi aisal.

DISTRIBUTION CODE:

BOO IS COPIES RECEIVED:LTR./

ENCLi SIZE:.

TITLE: 'Li'censing Submittal:,PSAR/FSAR Amdts L Related Correspondence,'OTES; RECIPIENT ID CODE/NAME NRA/DL/ADL NRR I B3 LA INTERNALS ELD/HDS1 IE/DEPER/EPB 36" IE/DEQA/QAB 21 NRR/DE/CEB ii NRR/DE/EQB 13 NRR/DE/MKB 18 LIRA/DE/SAB 20 NRR/DHFS/HFEBOO NRR/DHFS/PSRB NRR/Ds I/AEB 26 NRH/DSI/CPB 10 NRR/DSI/ICSB 16 NRR/DSI/PSB 19 NRR/DSI/RSB 23-RGN2 EXTERNAL0 ACRS DMB/DSS (AMDTS)

LPOR 09 NSIC 05.

COPIFS LTTR ENCL 0

1 0

1 0

3 3

1 1

1 1

2 2

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 i

3 3

6 1

1 1

1 1

1 RECIPIENT ID CODE/NAME hlRR LB3 BC KADAMBIzp 01 IE FILE IE/DEPER/IRB 35 NAR/DE/AEAB NRR/DE/EHEB NRR/DE/(sB 28 NRR/DE/MTEB 17 NRR/DE/SGEB 25 NRR/DHFS/LQB 32 NRR/DL/SSPB NRR/Ds I/ASB NRR/Ds I/CS8 09 NRR/DSI/METB'2 NRR/D RAO 22 04 RM/DDAMI/MI8 BNL(AMDTS ONLY)

FEMA REP DIII S9 NRC PDR 02 NTIS

,iCOP IES LTTR ENCL, 1

1 1

1 1

1 1

1 0.

1 1

2 2

1 1

1i 1

0 1

1 1

1

~

1 1

1 l

1 1.

1

-0 1

1-i 1<<

,'TOTAL NUMBER OF COPIES REQUIRED:

LTTR 53 ENCL 46

4 E(

I I

IE EE H

@ME, Carolina Power 8 Light Company JUL 011983 SERIAL:

LAP-83-277 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS.

1 AND 2 DOCKET NOS. 50-400 AND 50-401 DRAFT SAFETY EVALUATION REPORT RESPONSES METEOROLOGICAL AND EFFLUENTS TREATMENT BRANCH

Dear Mr. Denton:

Carolina Power

& Light Company (CP&L) herewith transmits one original and forty copies of the response to the Shearon Harris Nuclear Power Plant Draft Safety Evaluation Report (DSER)

Open Item 10.

Carolina Power

& Light Company will provide responses to other DSER Open Items in the near future.

Yours very truly, PSA/cfr (7187PSA)

Enclosure M. A. McDuffie Senior Vice President Engineering

& Construction CC:

Mr. N. Prasad Kadambi (NRC)

Mr. J. Levine (NRC-METB)

Mr. G. F. Maxwell (NRC-SHNPP)

Mr. J.

P. O'Reilly (NRC-RII)

Mr. Travis Payne (KUDZU)

Mr. Daniel F.

Read (CHANGE/ELP)

Chapel Hill Public Library Wake County Public Library 8307060ii4 83070i I

PDR.ADOCK 05000400 E

PDR Mr. Wells Eddleman Dr. Phyllis Lotchin Mr. John D. Runkle Dr. Richard D. Wilson Mr. G.

O. Bright (ASLB)

Dr. J.

H. Carpenter (ASLB)

Mr. J. L. Kelley (ASLB) g eeX 411 Fayetteville Street

~ P. O. 8ox 1551

~ Raleigh, N. C. 27602

~

4

~

~ =

h fM, L

-.gg Shearon Harris Nuclear Power Plant (SHNPP)

Draft Safety Evaluation Report (DSER)

Meteorological and Effluents Treatment Branch 0 en Item 10 (DSER Section 2.3.3 a e 2-15)

The meteorological instrumentation and the uses thereof during potential emergencies have not been described by the applicant.

The emergency preparedness meteorological program. will be reviewed in accordance with RG 1.101 during the emergency preparedness implementation appraisal and described in a supplement to the Safety Evaluation Report (SER).

~Res ense The meteorological instrumentation and the uses thereof during potential emergencies is described in the SHNPP Emergency Plan.

The Emergency Plan was submitted to the Staff on March 29, 1983.

In a May 24, 1983 telephone conversation, the Staff acknowledged that a preliminary assessment of the information included in the Emergency Plan deems the SHNPP's meteorological instrumentation and its uses as adequate.

The Staff will complete its review during the emergency preparedhess implementation appraisal.

Carolina Power 6

Light Company considers this to be a confirmatory item.