DOCKET 05000400 05000401 NOTES!
REGULATO INFORMATION DISTRIBUTION TEM ('RIDS).
=AGCESSION NBR! 8305270023 DOO ~ DATE "83/05/23 NOTARI'ZED NO FACIL'.,50-400 Shearon Har ris Nuclear power Plenty Uni,t ii.Carol ina 50 401 Shear on.Har r i-s Nuclear power Pl antr Uni't 2r <<Carol ina A'UTH ~ NAME' AUTHOR AFFILIATION MUDUFFIEiM.A, "Car al ina ~Power 3 light Co.
"RE<<CIP,NAME~
RECIPIENT AFFILIATION DENTONrH ~ RE Office-of Nuclear Reactor Regul.atiani Directar
'SUBJECT! Forwards responses to draft Chemical Engineering -Branch SER Open Item 145 8
148 re TMI Item II.B.'3."Post Accident
'SamPling Sys," L Operator 'training requirements far past" accident sampling <<sysivespectively.
DISTRIBUTION 'CODE:
8001S COPIES RECEIVED!L'TR, 'i"'ENCL. g
'SIZE:.~ ~
- TITLE: Licensing 'Submittali PSAR/FSAR Amdts 8, Related Corr espandence>>'ECIPIENT ID CODE/NAME<
NRR/DL/ADL NRR-L83 lA INTERNAL: <<ELD/HDS1 IE/DEPER/EPB 36
- IE/DEQA/GAB 21 NRR/DE/CEB ii NRR/OE/EQB 13 NRR/DE/MEB 18 NRR/DE/SAB 24 NRR/DE/SGEB 30 NRR/OHFS/LQB 32'RR/DL/SSPB'RR/DS I/ASB'RR/DSI'/CSB 09 NRR/DS I/h1ETB 12 AB 22 G
04=
R DDAMI/MI8 EXTERNAL: ACRS 41=
DMB/DSS (AMDTS) lPDR 03*
NSIC 05
,<<COPIES L'T'TR ENCL 1
0
.1 0
1 0
3 "3
1
~
1.
1 2
2 1
1 1
1 1
1
=0 1
1-1-
1 1
1 0
1 1
1 1
RECIPIENT ID CODE/NAME NRR LB3 BC KADAMBIr P 01 IE FIlE IE/DEPER/IRB 35 NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB 28 NRR/DE/MTEB 17 NRR/DE/SGEB 25 NRR/DHFS/HFiE840 NRR'/DHFS/PSRB NRR/DSI/AEB 26 NRR/DSI/CPB 10 NRR/DS I'/ICSB 16 NRR/DSI/PSB 19 NRR/DSI/RSB 23 RGN2 BNL(AMDTS ONLY:)
FEMA REP DIV '39 NRC PDR 02 NTIS'OP IF-'S LTTR ENCL 1
0 1
1 1
1 1
1 1
0
,1 1
2 2
1 1
2 2
1 1
1 1
1 1
1 1-1 1
,.1 1"
1 1
<<3 3
1 1
1 1
1 1
lTOTAL NUMBER OF COPIES REQUIRED:
LTTR 55 ENCL 48
I
'<<0
>>I
~
Il
'I tl
>>g~<<l Ir I t
t ll I "I << 'AI Il I
$ >>>>gtt I f;I "x
>>>>l >> <<
tr II I
il
,>>k 0 II
)
ii f
) lt~
LJ f
' '!'Irt'ij II'
'I
', I,
~ '<<
e rl II' k 'll II 1f>> x
<< '$f I
I I
<<II Il l' I'
1,~'lk')
<<)
I 'S'q
<<( 'I<<f <<
lr /l<</
I 'f]P, lr'I It I 5 I,
o jj
)'k 5
- l tt
)
Ii I<< ft<< I I
I lt 'II'>>II ) lit>>I I
II Il <<I
Dear Mr. Denton:
Carolina Power
& Light Company (CP&L) hereby transmits one original and forty copies of responses to Shearon Harris Nuclear Power Plant Draft Safety Evaluation Report Open Items.
These responses are for the Chemical Engineering
- Branch, and are CP&L Open Item Nos.
145 and 148.
We will be providing responses to other Open Items in the Draft Safety Evaluation Report shortly.
Yours very truly, JDK/kyar (6833JDK) cc:
Mr. N. Prasad Kadambi (NRC)
Mr. G. F. Maxwell (NRC-SHNPP)
Mr. J.
P. O'Reilly (NRC-RII)
Mr. J.
Wing (NRC)
Mr. Travis Payne (KUDZU)
Mr. Daniel F.
Read (CHANGE/ELP)
Chapel Hill Public Library Wake County Public Library M. A. McDuffie Senior Vice President Engineering
& Construction Mr. Wells Eddleman Dr. Phyllis Lotchin Mr. John D. Runkle Dr. Richard D. Wilson Mr. G. 0. Bright (ASLB)
Dr. J.
H. Carpenter (ASLB)
Mr. J. L. Kelley (ASLB) 830M70023 830523 FtDR ADQCK 05000400
.,E PDR 411 Fayetteville Street
~ P. O. Box 1551 o Raleigh, N. C. 27602
OPEN ITEN 145 9.3.2.2 Post Accident Sampling System pg.
9-35
~URSA ION Provide plant procedures for chemical analyses after an accident.
Provide
- accuracy, range, and sensitivity thereof.
(TMI II.B.3) (Sec. 9.3.2)
RESPONSE
Preparation of the plant procedures for the chemical and radiochemical analyses of post-accident samples shall be initiated after the installation of the post-accident sampling system and shall be completed prior to fuel load.
These procedures shall provide information regarding accuracy,
- range, and sensitivity of each radionuclide and chemical analyses.
This is a confirmatory item.
,)
1 ll g $~,j
(
It (
(
1
OPEN ITEM 148 9.3.2.2 Post Accident Sampling System Pg.
9.35
~UESTION Describe operator training requirements for Post-Accident Sampling System
RESPONSE
Information on the type of testing, the testing frequency, and the operator training requirements for the post-accident sampling system shall be provided after the installation of the system.
This is a confirmatory item.