Requests to Be Included in 1984 Schedule for Aerial Gamma Spectral Mapping to Determine Radiological Anomalies of Environ Prior to Operation
ML18018A461
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 03/14/1983
From: Hurford W
CAROLINA POWER & LIGHT CO.
To: Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
LAP-83-43, NUDOCS 8303160556
Download: ML18018A461 (4)


Text

REGULATO INFORMATION DISTRIBUTION 'TEM (RIOS)

'ACCESSION NBR: 8303160556 OOC ~ DATE: 83/03/14 NOTARIZED: NO DOCKET FACIL:50 400 Shearon Harr is Nuclear Power Plant~ Unit 1~ Carolina 05000000 50-001 Shearon BYNAME Harris Nuclear Power Plantr Unit 2q Carolina 05000401 AUTH AUTHOR AFFILIATION HURFORD<N J,~ Carolina .Power L Light Co.

RE'CIPgNAMF- RECIPIENT AFFILIATION DEYOUNG<R,G ~ Director's Office~ Of fice of Inspection and Enforcement

SUBJECT:

Requests to be included .in 1980 schedule for aer'ial gamma spectral mapping ito,determine radiological aromalies of environ prior to plant operation.

DISTRIBUTION CODE: B001S iCOPIES RECEIVED:LTR / ENCL / SIZE:

TITLE: Licensing Submittal t PSAR/FSAR Amdts 8, Related Correspondence NOTES:

REC IP I ENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL IO CODE/NAME LTTR ENCL NRR/OL/ADL 1 0 NRR LB3 BC 1 NRR LB3 LA 1 0 KADAMBIg P 01 1 1 INTERNAL: ELO/HDS1 1 0 IE FILE 1 1

-IE/DEP EPOS 35 1 IE/DEP/EPLB 36 3 3 NRR/OE/AEAB 1 0 NRR/DE/CEB 11 1 1 NRR/OE/EQB 13 2 2 NRR/DE/GB 28 2 2 NRR/DE/HGEB 30 1 1 NRR/DE/MEB 18 .1 NRR/DE/MTE& 17 1 1 NRR/OE/QAB 21 1 1 NRR/DE/SAB 2g 1 1 NRR/OE/SEB 25 1 NRR/DHFS/HFEBPO 1 NRR/DHFS/LQB 32 1 1 NRR/OL/SSPB 0 NRR/OS I/AEB 26 1 1 NRR/DSI/ASB 1 -NRR/DSI/CPB 10 1 1 NRR/OS I/CSB 09 1 NRR/OS I/ICS8 16 1 1 NRR/DS I/METB 12 1 .1 NRR/DS I/PS 8 19 1 1 NRA/DS AB 22 1 1 NRR/DSI/RSB 23 1 1 FILE 00 1 RGN2 3 DAMI/MIB 1 0 EXTERNAL: ACRS 6 BNL (An1OTS ONL Y)

OMB/DSS (AMDTS) 1 1 FEMA<<REP .DIV 39 LPDR 03 1 1 NRC PDR 02 NSIC 05 1 1 NTIS TOTAL NUMBER OF COPIES REQUIRED ~ L'TTR 52 ENCL 45

'4 4 W

f f <<akw n l,til>>1 ', F )a')kV, li', f y<<)>> W l! f

)rR>>w ~ f>> r I W -.I~ WJ~

w l kr

') gx!

I'I 4 I I I>> I W ~ J r ll) 7 W lk w

14 I qf r

I Ik r<<

!l R

Carolina Power & Light Company MAR 14 1983 Mr. Richard C. DeYoung, Director Serial: LAP-83-43 Office of Inspection and Enforcement United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS. 1 AND 2 DOCKET NOS. 50-400 AND 50-tl01 RADIOLOGICAL AERIAL SURVEY

Dear Mr. DeYoung:

Carolina Power & Light Company (CPAL) is in the process of establishing and documenting the radiological characteristics of the Shearon, Harris Nuclear Power Plant (SHNPP) environs prior to fuel loading. As part of the progtam, and in order to identify any radiological anomalies of the environment prior to the operation of the'lant, CP&L wishes to incorporate an aerial gamma spectral mapping.

In a telephone conversation with Mr. Eric Weinstein of your staff on February 1 1, 1983, we learned that SHNPP is not presently included in the 1983 schedule for the Aerial Radiological Monitoring System (ARMS) aerial survey that your office conducts on a periodic basis on nuclear power plants, but that it might be possible to include it in the 1984 schedule. Therefore, we hereby request that the ARMS aerial survey of SHNPP be included in your 1984 schedule, and that the results of the survey be shared with our technical staff as early as possible.

Please advise us as to your disposition of this request. Should you have any questions regarding this request, please contact Mr . Pedro Salas (phone: 919-836-8015). Thank you for your assistance.

Yours very truly, W. J. Hur for Manager Technical Services PS/ce (6301PSA)

Cct Mr.

Mr.

N. Prasad G. F.

Kadambi (NRC)

Maxwell (NRC-SHNPP) goo f Mr. J. P. O'Reilly (NRC-RII)

Mr. E. C. Weinstein (NRC-I&E) 830314

~,:8303ibOSSb 05000400

":'A"'.':

'PDRA DOCK ', PDR ')ettevllle Street ~ P. O. Box 1551 ~ Raleigh, N. C. 27602