Text
I REGUL ORY INFORMATION DISTRIBUTE SYSTEM
('RIDS)
'AOCBSSION NBR:8206040311 DOC ~ DATE: 82/06/01 NOTARIZED:
NO FAOIL:50 400 'Shearon Harris Nuclear Power Planti Unit 1, Carolina
, 50-401 Shearon Harris Nuclear Power Planti Unit 2< Carolina AUTH'AME AUTHOR AFFILIATION MCDUFFIEgMiA~
Carolina Power 8 Light Co.
'RBCIP.NAME RECIPIENT AFFILIATION,.
DENTONIH ~ RE Office of Nuclear Reactor Regulationr Director
SUBJECT:
Informs <that main control board, as been vedesigned certain equipment -j'elocated.as result of detailed control room design, r eview.Commi~ssioner s response to.secy 82<<111 awaited before proceeding further.
DISTR/BUTION CODE!
B001S COPIES RECEIVED:LTR k ENCL SIZE:
TITLE: PSAR/FSAR AMDTS and Related Correspondence NOTES0 DOCKET 050004'00 05000401 RECIPIENT ID CODE/NAME A/D LICENSNG LIC BR 03 LA
-INTERNAL: ELD/HDS1 IE/DEP EPOS 35 MPA NRR/DE/EQB 13 NRR/DE/HGEB 30 NRR/DE/MTEB 17 NRR/DE/SAB 24 NRR/DHFS/HFEB40 NRR/DHFS/OLB 34 NRR/DSI/AE8 26 NRR/DSI/CPB 10 NRR/DSI/ETSB 12 NRR/DSI/PS 8 19 NR I/RSB 23 REG 04 EXTERNAL: ACRS 41 FEMA<<REP DIV 39 NRC PDR 02 NTIS COPIES LTTR ENCL 1
1 1
1 1
3 2
1 1
1 1
1 1
1 1
1 1
16 1
1 1
1 RECIPIENT ID CODE/NAME LIC BR 03 BC LICITRAg M ~
01 IE FILE IE/DEP/FPLB 36 NRR/DE/CEB 11 NRR/DE/GB 28 NRR/DE/MEB 18 NRR/DE/QAB 21 NRR/DE/SEB 25 NRR/DHFS/LQB 32 NRR/DHFS/PTRB20 NRR/DSI/ASB 27 NRR/DSI/CSB
'09 NRR/DSI/ICS8 16 NRR/DS I/RAB 22 NRR/DST/LGB 33 RGN2 BNL(AMDTS ONLY)
LPDR 03 NSIC 05 COPIES LT'TR ENC 1
1 1
1 2
1 1
1 1
1 1
1 1
1 1
2 0
)TOTAL NUMBER OF COPIES REQUIRED:
L'TTR'3 'NCL I
Y'N 4'Q C
g 1
N j f Nf k j)
~
N +
l
<<N "J
~
j YN NN it
~
M I
ff If N
PN IN I'
I I N
<N1 N
I Y
~.
P' f Yf I, <<,
<<N I
CSQE Carolina Power & Light Company
'JUN 01
$982 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D.C.
20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS.
1 AND 2 DOCKET NOS. 50-ti00 AND 50-ti01 HUMAN FACTORS ENGINEERING BRANCH CONTROL ROOM REVIEW
Dear Mr. Denton:
In reference to NRC letter to Mr. J.
A. Jones dated March 26,
- 1982, Carolina Power
& Light Company (CP&L) has conducted a Detailed Contr ol Room Design Review.
This extensive review was performed by the Essex Corporation between April 1980 and January 1981.
As a result of this study, the Main Contr ol Board was redesigned and certain equipment relocated.
For those design features which could not be evaluated or measured due to the then present stage of construction, Essex developed 17 human engineering specifications.
These specifications are being incorporated as necessary to ensur e a well-engineered Control Room from a human factors engineering standpoint.
Carolina Power
& Light Company completed this "state of the art" Control Room Design Review prior to any regulatory requirement.
We are awaiting the Commissioners response to SECY 82-111 before proceeding further.
Yours very truly, M. A. McDuffie Senior Vice President Engineering
& Construction GSC/lr (n-67) cc:
Mr. Manny Licitra (NRC)
Mr. J.
P. O'Reilly (NRC-RII) 82060403ii 82060i I
)lie Street
~ P. O. Box 1551 o Raleigh, N. C. 27602
'DR AOaCV, OSaOO4OO