to Procedure 80A5035, Reactor Pressure Vessel Preservice Insp Program Plan.
ML18017B699
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 04/30/1982
From: Ahmed A
NUCLEAR ENERGY SERVICES, INC.
To:
Shared Package
ML18017B698 List:
References
80A5035, NUDOCS 8205210269
Download: ML18017B699 (109)


Text

DOCUMENT NO, MA>O3> REV.

NUCLEAR ENERGY SERVICES. INC. PAGE ~1F 77 82052i0269 8205i8 PDR ADOCK 05000400 6 PDR REACTOR PRESSURE VESSEL PRESER VICE INSPECTION PROGRAM PL'AN SHEARON HARRIS NUCLEAR POWER PLANT UNIT 81 Prepared for Carolina Power and Light Company IlOETROLLfll IlOI'7 YALID DNLY IF THi$ STAMP IS RED Project Application Prepared By Dete APPROVALS TITLE/DEPT. SIGNATURE DATE FORM er NES 204 2/80

C 41~ I E

IC

DOCUMENT NO.

REVISION LOG PAGE 2 OF NUCLEAR ENERGY SERVICES, INC.

REV PAGE NO.

DATE NO. DESCRIPTION APP RO VA L FORM NES 2062/80

80A503

~QF~

DOCUMENT NO.

H NUCLEAR ENERGY SERVICES, INC.

PAGE TABLE OF CONTENTS

~Pa e

l. Introduction
2. Bases for Preservice Inspection Program
3. Preservice Inspection Program Plan Description 3.1 Classification 3.2 Exemptions 3.3 Exceptions 3.0 Ultrasonic Testing Calibration Standards 6 3.5 Examination Procedure 6 3.6 Figures and Sketches 7 3.7 Quality Assurance 8 3.8 *Evaluation Criteria 8 3.9 Records and Reports 8 3.10 Personnel Qualifications Requirements 8 3.11 Pre-examination Requirements 8
0. Program Plan R Schedule Weld Map Figures 10-19 Schedule Sheets 20-77

¹ FORM NES 205 2/80

80A5035 DOCUMENT NO.

77 PAGE OF NUCLEAR ENERGY SERV(CES, INC.

1- INTRODUCTION This Program Plan has been prepared to fulfill the Preservice Inspection (PSI) requirements for the Reactor Pressure Vessel (RPV) of the Shearon Harris Nuclear Power Plant, Unit N I, owned by Carolina Power 4 Light Company (CPRL).

The scope of these examinations, procedures and acceptance criteria meet the requirements outlined in Section XI of the ASME Boiler and Pressure Vessel Code, hereafter referred to asSection XI "Rules for Inservice Inspection of Nuclear Power Plant components", 1980 Edition, up to and including the Winter 1981 Addenda.

2. BASES FOR PRESERVICE INSPECTION PROGRAM 10 CFR 50.55(a) establish the edition of Section XI applicable to the PSI of the Reactor Pressure Vessel based upon the construction permit which was issued on 3anuary 27, 1978. However, it is the intention of Carolina Power 8 Light Company to comply with the requirements of Section XI, 1980 Edition with Addenda through Winter 1981. This represents a voluntary upgrade from the applicable 1970 Edition, Summer 1975 Addenda. It should be noted that at the time this Plan was prepared, the Winter 1981 Addenda had not been approved. This edition of Section XI was selected in anticipation of its approval and to provide baseline data comparable to that which will be taken during Inservice Inspection. CPdcL feels that this code upgrade will meet the intent of 10 CFR 50.55(a) and Section XI.

Compliance with Nuclear Regulatory Commission (NRC) Regulatory Guide 1.150, "Ultrasonic Testing of Reactor Vessel Welds during Preservice and Inservice Examinations" is given in the Shearon Harris Nuclear Power Plant FSAR.

3. PRESERVICE INSPECTION PROGRAM PLAN DESCRIPTION 3.1 CLASSIFICATION All components in this program plan are part of the reactor coolant pressure boundary as defined in 10 CFR 50 Section 50.2(v) and are, therefore, Class I.

3.2 EXEMPTIONS None of the welds or components of the RPV are exempted from examination by subparagraph IWB-1220 of Section XI 3.3 EXCEPTIONS Exceptions to Code required examinations may be authorized by the regulatory authority, as allowed by 10 CFR 50.55 a(a)(2), provided that design, fabrication, installation, testing and inspection performed in compliance with codes and Section XI requirements would result in hardship without a compensating increase in the level of quality and safety, or provided that the proposed alternative examination will provide an acceptable level of quality and safety.

FORM 0 NES 205 2/80

DOCUMENT NO.

8 PAGE OF

'NUCLEAR ENERGY SERVICES. INC.

Detailed descriptions and justifications for exceptions taken can be found in Table 3.3.

Table 3.3 Exceptions System Reactor Pressure Vessel Category B-A Quality Group A.

Component

Description:

Pressure retaining welds in the reactor pressure vessel 4

Code Requirement Volumetric examination of 100% of the pressure retaining welds and required volumes.

S h

Basis for Relief Specific regions of the welds and required volumes may not not be examined due to part geometries (e.g. core support lugs, flange ID taper, nozzle bores, bottom head instrumentation tubes), laminar defects, and ultrasonic examination effects (e.g. near field effects, cladding/parent metal interfaces). Ultrasonic examination will be performed on as much of the welds and required volumes as practical (as def ined by 10CFR 50.55a(a)(2)) details of the unexamined areas will be provided in the final examination report.

Alternate Testing None FORM 0 NES 205 2/80

\ ~ Alt ~ ~ I 'la +'

I e

NUCLEAR ENERGY SERVICES, INC.

DOCUMENT NO.

PAGE ~OF~

3.0 ULTRASONIC TESTING CALIBRATIONSTANDARDS The UT examination calibration standard design and material selection is in accordance with subarticle T-030 of Article 0 of ASME Section V, 1980 Edition, up to and including the V/inter 1981 Addenda.

Table 3A lists all the UT calibration standards required to perform the ultrasonic examinations for the RPV at Shearon Harris NPP.

Table 3A Block Title Where Used Wall Thickness Material SHNPP-UT-1 RPV 9 II SA533 SHNPP-UT-2 RPV 8ll SA533 SHNPP-UT-3 RPV 5ll SA533 SHNPP-UT-0 RP V Nozzles and inner radius N/A SA508 SHNPP-UT'-0 Flange N/A SA508 SHNPP-UT-5 Flange Ligament I 2ll SA508 SHNPP-UT-6 Nozzle Safe End (Nozzle Side) 2.65" SA508 SHNPP-UT-7 Outlet Nozzle Safe End (Pipe Side) 7ll SA376 SHNPP-STUD-6 Studs 6ll SA500 3.5 EXAMINATION PROCEDURES Subarticle IV/A-1000 of Section XI requires the development and preparation of written examination procedures necessary for the conduct of the nondestructive examinations associated with PSI operations. The written procedures for the performance of visual, surface, and volumetric examinations are referenced in Table 3.5.

Visual Testing (VT) examination is employed to provide a report of the general condition of the part, component or surface to be examined; including such conditions as scratches, wear, cracks, corrosion or erosion on the surfaces; misalignment or movement of the part or component; or any evidence of leaking.

The NES VT examination procedures are based on the requirements of Paragraph IV/A-2210 of Section XI.

Liquid Penetrant Testing (PT) examination is specified as the surface examination method to delineate or verify the presence of cracks or discontinuities open to the examination surface. The NES PT Examination Procedure is based on the requirements of Paragraph IV/A-2222 of Section XI.

The Ultrasonic (pulse echo) Testing (UT) examination is selected as the volumetric examination method to indicate the presence of subsurface discontinuities by examining the required volume of metal contained beneath the surface to be examined. The NES UT examination procedures are based on Section XI and Article 0 of Section V.

¹ FORM NES 205 2/80

80A5035 h DOCUMENT NO.

h PAGE OF NUCLEAR ENERGY SERVICES, INC.

Table 3.5 Reference NDE Procedures SOA 5037 Automated UT Examination Procedure for Reactor Vessel Shell and Head Welds h

80A 5038 Automated UT Examination Procedure for Reactor Vessel Upper shell to Flange Weld from the Flange Mating Surface 80A5039 Ultrasonic Examination Procedure for Reactor Vessel Flange Ligaments SOA 5000 Automated UT Examination Procedure for Reactor Vessel Nozzle to Shell Welds SOA500l Automated UT Examination Procedure for Reactor Vessel Nozzle Inner Radii 1

SOA5002 Automated UT Examination Procedure for Reactor Vessel Nozzle to Pipe Welds SOA5003 Visual Examination Procedure SOA5000 Liquid Penetrant Examination Procedure SOA 5006 Ultrasonic Examinations General Requirements SOA5007 Ultrasonic Examination Procedure for Reactor Vessel Closure Head Welds SOA5008 Ultrasonic Examination Procedure for Bolts and Studs 3.6. FIGURES AND SKETCHES The figures listed in Table 3.6 show the identification and location of areas of the Reactor Pressure Vessel requiring examinations.

Table 3.6 Reactor Pressure Vessel Sketches A-Ol Rev 0 General Arrangement A-02 Rev 0 Circumferential Weld Map Reactor Vessel Assembly A-03 Rev 0 Longitudinal Weld Map Reactor Vessel Assembly FORM ONES 205 2/80

,hh Y'

II NUCLEAR ENERGY SERVICES, INC.

DOCUMENT NO.

PAGE OF A-00 Rev 0 Bottom Head Weld Map A-05 Rev 0 Inlet and Outlet Nozzles A-06 Rev 0 Sectional View Nozzles A-07 Rev 0 Top Head partial Penetration Welds A-08 Rev 0 Bottom Head Partial Penetration Welds A-09 Rev 0 Top Head Bolting A-10 Rev 0 Bolting Details 3.7 QUALITYASSURANCE The NES Quality Assurance Program Plan (QAPP) Document P/80A5030, governs the design review and implementation of the Shearon Harris Nuclear Power Plants Preservice/Inservice Inspection Program Plan. This document is in accordance with NES ISI-Quality Assurance Manual, document j/80A9021, which is in compliance with Appendix B of 10 CFR 50. The QAPP includes the detailed quality assurance requirements that are common to.all activities of the program including organization, management, liaison, examination implementations, control of inspection records, qualifications of personnel, materials and procedures, etc.

3.8 E VALUATIONCRITERIA Evaluation of "any indications detected during PSI shall be made in accordance with IWA-3000 of Section XI. Indications detected may be evaluated by other nondestructive methods, where practical, to assist in the determination (size, shape, lo'cation, orientation) before final disposition is made.

3.9 RECORDS AND REPORTS A system of records of the Preservice Inspection, plans, schedules and calibration standards; the examination results and reports, the corrective action required and taken, will be developed and maintained at the site in accordance with Article IWA-6000 of Section XI..

3.10 PERSONNEL QUALIFICATIONREQUIREMENTS Personnel performing nondestructive examination operations shall be qualified with procedures prepared in accordance with SNT-TC-lA, 1980 Edition, for the applicable examination technique and methods as required by Article IWA-2300 of Section XI. All examinations shall be performed and the results evaluated by qualified nondestructive examination personnel.

For those nondestructive examination methods not covered by SNT-TC-IA MOINES documents, NES shall qualify personnel on the particular method involved. The NES procedures for such qualification provide uniform programs of training, evaluation and certification of personnel.

3.11 PRE-EXAMINATION REQUIREMENTS General provisions for accessibility have been defined by Article IWA-1500 of Section XI.

FORM 205 2180

80A 5035 DOCUMENT NO.

9 77 PAGE OF NUCLEAR ENERGY SERVICES, INC.

All portions of RPV that require inspection in accordance with the requirements of Section XI are designed with adequate physical access to allow the required inspection except as noted in paragraph 3.3.

0. PROGRAM PLAN AND SCHEDULE The specific PSI examination requirements are defined in the PSI Program Plan and its schedule tables. Each weld or other examination area is designated by a unique identification number, and then described. Also identified are applicable examination category, method, procedure number and any calibration standard number referenced for ultrasonic examination as described in Section 3 of the General Reference Text.

Examination items are first divided according to the figure that they appear on.

Multiple examination requirements of the same component are listed together in the schedule tables.

FORM ¹NES 205 2/80

~ "<<g f>>% A V + I '4 ~

8 4

DQClJMENT NQ SOA5035 PAGE >O OF NUCLEAR ENERGY SERVICES, INC.

VENT PIPE CONTROL ROD DRIVE

~

STUDS-I~ TOP HEAD FLANGE t TOP HEAD INLET NOZZLE OUTLET NOZZLE RING NO.3 VESSEL SUPPORT PAD RING N0.2 RIENG NO. I LOWER CORE SUPPORT PAD

~

$ +pggggg g~ Qg~

GENERAL ARRANGEMENT BOTTOM HEAD Eiev: g Fn. FEO. A Of ASSEMBLY I. T~~A~m3/a/sZ0 cl.l+

'SHEARON HARRIS N.P. R FORM =NES 205 2/80

II 4 NUCLEAR ENERGY SERVICES, INC.

DOCUMENT NO PAGE 80A5035

~~ OF I/

5 4

BASE METAL I-SH-RV-018 I -SH-RV-OOI RING NO.Z ~ C

~

I-SH-RV-002 l

I RING N0.2 I- SH-RV- 003 Ip 7 3 BASE METAL RING NO. I I-SH-RV-004 I

NVCISLO NE SOT MNVICtO SYIltM HQ.

"'CIRCUMFERENTIAL WELD MAP II I-SH-RV-0 I7 REACT. VESSEL ASShLY sev: Q s>o. m.A 02 BASE METAL er:~Q(pJ oava 3/3 j

,~~ira <J8

'SHEARON HARRIS N.P,P.

mr ro scca FORM o NES 205 2/80

'L DOCUMENT NO.

NUCLEAR ENERGY SERVICES, INC.

PAGE ~0F~P 225 0 25 45 l35 2I5 ,3I5 360 I-SH-RV-OOI I-SH- V- '-SH-RV-OOS 5e/z 67 DIA. DIA.

I -SH-RV-007 I-SH-RV-008 I-SH-RV- 03 I-SH>>RV-009 I- H-RV-OIO I-SH- RV-004 LCNER CORE P SUPPORT PADS I so I

180 270 I-SH-CS-Ol I"SH-CS-02 I-SH-CS-03 I-SH-CS-04 SYSTEM TEO.

>>T<<LONGITUDINAL WELD MAP REACT. VESSEL ASS BLY Q 4-03 T~

EEEYE saba. PEO.

~E ~TEE~/>

AlH ~ATE>>. 4 SHEARON HARRIS N.PP.

PEOT TO SCALE FORM TTNES 205 2/80

DOCUMENT NO 80A5035 PaGa >3 PF NUCLEAR ENERGY SERVICES INC 0

- SH-RV-OI 345 I I 45 P ANV W I-SH-RV-OI2 I" SH-RV-OI6 285~

270 90 IOS I" SH-RV-OI3 I-SH"RV-OI5 225 I-SH-RV-OI4 le I65 I-SH-RV-OII I-SH-RV-OI2 I-SH-RV-OI6

~

MEPIDIONAL Tl NA VIEN 'NELD

I- .RV"Ol BASE'ETAL WC%M CIWMTttSVCtI 5YS'IKQ TITLE HO.

BOTTOM HEAD IIIELD IvlAP slav: Q sIo. ~, A-O4 ev: ~Q~ oAra:~gqIIQZ, APt gggPJ)A+

SHEARON HAPRIS N.P. P.

NOT IO SCAEC FORM NES 205 2/80

~ ~ ~, w ~

DOCUMENT NO.

NUCLEAR ENERGY SERVICES, INC. PAGE ~OP I-SH-SP-OI I-SH-SP-06 335 25 Nl'i N6 I-SH-SE-Ol SAFE-END WELD I-SH-SE-06 (TYP. OF 6) V

/

I OUTLET INLET NOZZLE I-SH-N-OI I-SH-N-06 I- SH- N-Ol- I R 6-IR I-SH-N-02-IR

/ I-SH-N-05-I R

/ li~lLr,T OUTLET NOZZLE / NOZZLE I-SH-SP-05 I-SH-SP-0 27G i 90 I>>

265 I c5 N2 I L N5 I -SH "SE-02 I-SH-SE-05 I-SH-N-02 I- H-N" 5 I- SH-N-03 I-SH-N-04 INL"T OUTLET NOZZLE NOZZLE I-SH-SE-03 I "SH"SE-04 N3, P

XQN4 o

2I5 I-SH-SP-03 I-SH-SP-04

-N.O -IR I-SH-N-04-I R IBQ NOTE N-NOZZLE WELD PPUCM M GPPGNGT GGNVPCGG SE- SAFE-END WELD SP- SUPPORT PAD WELD INLET+OUTLET NOZZLES SEV:Q E~.~, A-05 ev:7 oava3/q P APP; /ZJ7COATE:

SHEARON HARRIS N.P.P.

NOT TO SCALE FORM "

-NES 205 2/80

DOCUMENTNO. son o PAGE ~ 5 OF NUCLEAR ENERGY SERVICES, INC.

PLAN VIEW PLAN VIEW 5UPPORT PAD (TYP. OF 3 EA FOR WELD NOS

)

1NLET SEE DWG. A-OS OUTLET NOZZLE NOZZLE

~INNER RADIUS (TYP. OF 3 EA.)

SAFE-END WELDS (TYP. OF 3 EA. )

SECTION V I EVI SECTION Yl EW WC!le CSCIW ygyyggi Fl'ALE SECTIONAL VIEW NOZZLES slav: Q rn. m. 4-O6

~ 7~~A~ oasa3 5

'SHEARON HARRIS N.PR wlT TO~a FORM < NES 205 2/80

DOCUMENT NO.

NUCLEAR ENERGY SERVICES, INC. PAGE ~6 OF 7~

0 C.R.D.

PENETRATIONS (TYP. )

VENT PIPE CRD PENETRATION .AND PENETRATION 'CROM HOUSIN6 NOS.(TYP)

I-SH-VP "Q55 . Q5A 55

.~5--O4I -! g-IB ~2

@ @- OI'- OA7 270 Q5 I III QEI OI5 Q9 O5

,QI O5

'E Oo QT~I9 OIs 6 II mrs)

Q5 90 y

Q OEI I OI.

g, QIP-O.

QE O5 OI5 OII

g. y OE I g 6I O

OET QSI

@9 NOTE ALL TOP AEAD PARTIAL PENETRATION WELD NOS.

ARE PRECEEDED SY IBO I-SH-CRD" FOR COMP.

OUTSIDE VIEW- TOP HEAD WELD IDENTIFICATION.

CRD HOUSING WELD rival TOP HEAD IDENT. NOS I-SH-CRH- PARTIAL (TYP. OF 58) PENETRATIONS

~~. ~~.A-P7 42 aava

~OAT@

SHEARON HARRIS N.P.P.

C NTR ROD HOUSING FORM ONES 205 2/80

DOCUMENT NO so NUCLEAR ENERGY SERVICES, INC. PAQE >7 pp 77 0

MELD NUVBERS AND INSTRUMENT PENETRATIONS (TYP.)

- '-Qzs I

's Os Os SO'i Qas Qm Oso

. 270 y @ Oo g.......Oi Os @g so (g----Oi7 -

6

...0Ois.,~i.~.---

ih ~

0 0eQs--

8 t

- ---. "- Qs 04' - giga--------y 9

IBO OUTSfDE VIEW-BOTTOM HEAD

~NT~

naia BOTTOM HEAD ALL BOTTOM HEAD PARTIAL PARTIAL PENETRATION WELD NOS., ARE PRECEEDED BY I-SH-I P- FOR PENETRATIONS COMP. WELD IDENTIFICATION. aev: Q rss. m. A os':3 OB,'T B2.

SHEARON HARRIS N.P. P.

FORM 0 NES 205 2/80

DOCUMENT NO 80A5035 NUCLEAR ENERGY SERVICES, INC. PaGE ~OF 0

0' g~,Qs 066 Os ps ps 06, QG 060 0$

0 9

Pis (o

'Qe O

Qio 5, Q 90 016 Oas Qs QGi Qis OGo Qss Qi IDENTIFICATION NOS.

FOR BOLTING oeoe oe ,o I80 PLAN VIEW OF TOP HEAD FLANGE STUD HOLE LOCATIONS TITLE ~

TOP HEAD BOLTING nEL Eio. A Og T W ~~3qgZ

'SHEARON HARRIS N.P.P, FORM 0 NES 205 2/80 Vt << ~ <<~ ~ ~

e DOCUMENT NO. 80>5035 NUCLEAR ENERGY SERVICES, INC. PAGE ~OP i I q +0 IIEP 3X I

I I

I I

O-IID cD + I D

I 04 IG I I -le o

+

I

-Ie aIA I

I I

I CYLINDRICALNUT I

I IDENT. NUMBERS I

I I

I-SH-NUT-I el (TYP. OF 58)

+I IDIIII z O

STUD DETAIL IDENT. NUMBERS g) I-SH-STUD-D (TYP. OF 58)

Ld s I U I I II D I I O I I

,Z I I I I I L9

'I I I SPHERICAL WASHER g I IDENT. NUMBERS I

"fm o I-SH-WSH-g I + I hIco (TYP. OF 58)

I I

IDIIII TAPPING DETAIL OF TITLE SHELL FLANGE ASSY. BOLTING IDENT. NUMBERS DETAILS I-SH-THD-(TYP. OF 58) IImv: Q sIo. IIo. A IO oAva3 g(

Ia ~Q~

ISHEARON HARRIS N.P.P.

FORM -" NES 205 2/80

Sys: Reactor Pressure Vessel BY: DATE: 2.

Reference Drawing: A-02 Preservice Inspection PROGRAM PLAN AND SCHEDULE APP: ~(l DATE:

SHNPP - 5565 REV: o PAGE 2 OF 77 I

CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE No. IDENTIFICATION DESCRIPTION NUMBER (II applicable) CATEGORY METHOD No. REMARKS REACTOR VESSEL WELDS 80A 5037 SHNPP- B-A UT N/

I-SH-RV-001 Flange to Vessel Ring //3 UT-I B1.30 Circumferential Weld 80A5038 SHNPP-UT-0 SHNPP- B-A UT I-SH-RV-002 Circumferential Vessel Shell Weld 80A5037 UT-I Bl. I I Ring II3 to Ring //2 SHNPP-UT-2 I-SH-RV-003 Circumferential Vessel Shell Weld 80A5037 SHNPP- B-A UT N/

Ring //2 to Ring //I UT-2 Bl.l I SHNPP- B/A UT I-SH-RV-000 Circumferential Vessel Shell Weld 80A5037 UT-2 Bl.l I Ring //I to Bottom Head SHNPP-I-SH-RV-017 Circumferential Bottom Head Shell Weld 80A5037 SHNPP- B-A UT N/

UT-3 Bl.21 I-SH-RV-018 Flange to Top Head Circumferential Shell 80A 5007 SHNPP- B-A UT N/

Weld UT-3 BI.OO NES 223/11/81

e System:, Reactor Pressure Vessel BY: DATE! S'2 Reference Drawing: A-03 Preservice Inspection PROGRAM PLAN AND SCHEDULE SHNPP - 5565 REV: o PAGE 21 OF 77 CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE NO. IDENTIFICATION DESCRIPTION NUMBER {IIapplicable) CATEGORY METHOD No.

REACTOR VESSEL WELDS I-SH-R V-005 Longitudinal Vessel Shell Weld on 80A5037 SHNPP- B-A UT=- N/

Ring II/3 at 25 UT-I B1.12 I-SH-RV-006 Longitudinal Vessel Shell Weld on 80A 5037 SHNPP- B-A UT N/

Ring I/3 at 2i5 UT-I Bl.12 I-SH-RV-007 Longitudinal Vessel Shell Weld on 80A5037 -SHNPP- B-A UT Ring I/2 at 05 UT-2 B 1.12 I-SH-RV-008 Longitudinal Vessel Shell Weld on 80A5037 SHNPP- B-A UT Ring I/2 at 225 UT-2 B1.12 I-SH-RV-009 Longitudinal Vessel Shell Weld on 80A5037 SHNPP- B-A UT N/

Ring I/I at 135 UT-2 Bl.12 I-SH-R V-010 Longitudinal Vessel Shell Weld on 80A5037 SHNPP- B-A UT N/

Ring I/I at 315 UT-2 Bl.12 RES 223/11/81

Syste T Reactor Pressure Vessel BY: RPC/ DATE: 5  ?-

Reference Drawing: A-00 Preser vice Inspection PROGRAM PLAN AND SCHEDULE REV. 0 PAGE 22 OF 77 CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE NO. IDENTIFICATION DESCRIPTION NUMBER (II applicable) CATEGORY METHOD NO. REMARKS REACTOR VESSEL WELDS I-SH-RV-Ol I Meridional Bottom Head Weld at 305 SOA5037 SHNPP- B-A UT N/

UT-3 Bl.22 I-SH-RV-012 Meridional Bottom Head Weld at 2S5 80A5037 SHNPP- B-A UT N/

UT-3 Bl.22 I-SH-RV-013 Meridional Bottom Head Weld at 225 SOA5037 SHNPP- B-A UT N/

UT-3 B1.22 I-SH-RV-010 Meridional Bottom Head Weld at 165 SOA5037 SHNPP- B-A VT N/

VT-3 Bl.22 I-SH-R V-015 Meridional Bottom Head Weld at 105 SOA5037 SHNPP- B-A UT N/

UT-3 Bl.22 I-SH-R V-016 Meridional Bottom Head Weld at 05 i 80A5037 SHNPP- B-A VT N/

UT-3 B1.22 MES 223/11/81

Sys Reactor Pressure Vessel BY: DATE: S 82.

Reference Drawing: A-05, 06 DATE:

Preservice Inspection PROGRAM PLAN AND'SCHEDULE PAGE 2 OF 77 SHNPP - 5565 CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE No. IDENTIFICATION DESCRIPTION NUMBER (Il eppIIcable) CATEGORY METHOD No. REMARKS VESSEL NOZZLE WELDS 80A5037 SHNPP- B-D UT N 1-SH-N-01 Inlet Nozzle Nl to Vessel at 335 UT-1 B3.90 80A5000 SHNPP-UT-0 1-SH-N Inlet Nozzle Nl In'ner Radius 80A5001 SHNPP- B-D UT N/

IR UT-T1 B3.10 80A 5002 SHNPP- B-F UT I-SH-SE-Ol Inlet Nozzle Nl Safe End Weld UT-6 B5.10 80A5000 PT 80A5037 SHNPP- B-D UT N/

I-SH-N-02 Outlet Nozzle N2 to Vessel at 265 UT-1 B3.90 80A5000 SHNPP- PT =

UT-0 1-SH-N-02 Outlet Nozzle N2 Inner Radius 80A5001 SHNPP- B-D UT N/

IR i UT-0 B3.10 80A5002 SHNPP B-F UT.

I-SH-SE-02 Outlet Nozzle N2 Safe End Weld UT-6 B5.10 80A5000 SHNPP- PT UT-7 80A 5037 SHNPP- B-D UT N/

1-SH-N-03 Inlet Nozzle N3 to Vessel at 215 UT-1 B3.90 80A5000 SHNPP-UT-0 1-SH-N-03 Inlet Nozzle N3 Inner Radius 80A5001 SHNPP- B-D UT N/

IR UT-0 B3.10 N ES 223/11/81

Sys  :'eactor Pressure Vessel BY: DATE: 5'Z Reference Drawing: A-05, 06 Preservice Inspection PROGRAM PLAN AND SCHEDULE APP:

Rpy'.

( DATE:

pgpp'2y pp

- 5565 77 SHNPP CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM 20NE No. IDENTIFICATION DESCRIPTION NUMBER Bf appIicable) CATEGORY METHOD No.

VESSEL NOZZLE WELDS OA5 002 HNPP- U I-SH-SE-03 Inlet Nozzle N3 Safe End Weld UT-6 B5.10 80A5000 PT I-SH-N-00 Outlet Nozzle N0, to Vessel at 105 UT-I B3.90 SOA5000 SHNPP-UT-0 I -SH-N-00 Outlet Nozzle N0 Inner Radius 80A 5001 SHNPP- B-D UT N/

IR UT-0 B3.10 SOA 5002 SHNPP- B-F UT N I-SH-SE-00 Outlet Nozzle N0 Safe End Weld UT-6 B5.10 SOA5000 SHNPP- PT UT-7 80A5037 SHNPP B-D. UT N I-SH-N-05 Inlet Nozzle N5 to Vessel at 95 UT-I B3.90 80A5000 SHNPP-UT-0 I-SH-N-05 Inlet Nozzle N5 Inner Radius SOA5001 SHNPP- B-D UT N/

IR UT-0 B3.10 SOA5002 SHNPP- B-F UT N I-SH-SE-05 Inlet Nozzle N5 Safe End Weld UT-6 B5.10 80A5000 PT SOA5037 SHNPP- B-D UT N/

I-SH-N-06 Outlet Nozzle N6 to Vessel at 25o UT-I B3.90 SOA5000 SHNPP-N ES 223/11/81

System: Reactor Pressure Vessel BY: DATE: 5'82 le Reference Drawing: A-05, 06 Preservice Inspection PROGRAM PLAN AND SCHEDULE CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE No. IDENTIFICATION DESCRIPTION NUMBER (II spplicabie) CATEGORY METHOD No. REMARKS VESSEL NOZZLE WELDS I-SH-N-06 Outlet Nozzle N6 Inner Radius 80A5001 SHNPP- B-D UT N/

IR UT-0 B3. I 0 80A5002 SHNPP- B-F UT N I-SH-SE-06 Outlet Nozzle N6 Safe End Weld UT-6 B5.10 80A5000 SHNPP- -PT UT-8 NES 223/11/81

Sy: Reactor Pressure Vessel Reference Drawing: A-05, Preser vice Inspection 06 PROGRAM PL'AN AND SCHEDULE BY:

APP:

~ DATE:

DATE:

5'2 SHNPP - 5565 RQQ, PAGE 2 QF 77 CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE No. IDENTIFICATION DESCRIPTION NUMBER (II applicable) CATEGORY METHOD NO. REMARKS ATTACHMENTWELDS I-SH-SP-01 Inlet Nozzle Nl to Support Pad 80A 5000 N/A B-H Note I of category B-H I-SH-SP-02 Outlet Nozzle N2 to Support Pad 80A 5000 N/A B-H N/ Note I of category B-H I-SH-SP-03 Inlet Nozzle N3 to Support Pad 80A 5000 N/A B-H N/ Note I of category B-H I-SH-SP-00 Outlet Nozzle NO to Support Pad 80A 5000 N/A B-H N/ Note I of category B-H I-SH-SP-05 Inlet Nozzle N5 to Support Pad 80A 5000 N/A B-H N/ Note I of category B-H I-SH-SP-06 Outlet Nozzle N6 to Support Pad 80A 500 0 N/A B-H Note I of category B-H NES 223/ll/81

S n: Reactor Pressure Vessel Reference Drawing: A-07 BY: DATE: r z.

Preservice Inspection PROGRAM PLAN AND SCHEDULE REV- o PAGE 2 oF 77 CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE No. IDENTIFICATION DESCRIPTION NUMBER , (II appllcabIe) CATEGORY METHOD No. REMARKS CLOSURE HEAD PENETRATION WELD I-SH-CRD-Ol CRDM Penetration 80A5003 N/A B-E VT- N/

B0.12 I-SH-CRD-0 CRDM Penetration 80A5003 N/A B-E B0.12 I-SH-CRD-0 CRDM Penetration 80A5003 N/A B-E VT- N/

B0.12 I-SH-CRD-0 CRDM Penetration 80A 5003 N/A B-E VT- N/

B0.12 I-SH-CRD-0 CRDM Penetration 80A5003 N/A B-E VT- N/

B0.12 I-SH-CRD-0 CRDM Penetration 80A 5003 N/A B-E VT- N/

B0.12 I-SH-CRD-0 CRDM Penetration 80A 5003 N/A B-E VT- N/

BO.I2 I-SH-CRD-0 CRDM Penetration 80A 5003 N/A B-E B0.12 MES 223/11/81

II

~

"P Sy . Reactor Pressure Vessel BY: DATE: Ed'2, Reference Drawing: A-07 APP: C DATE:

Preservice Inspection PROGRAQ@PQPPD SCHEDULE REY: pAGE 28 oF 77 CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE No. IDENTIFICATION DESCRIPTION NUMBER (II eppIicable) CATEGORY METHOD No. REMARKS CLOSURE HEAD'PENETRATION WELDS I-SH-CRD-09 CRDM Penetration 80A50 03 N/A B-E N/

BO.I2 I-SH-CRD-10 CRDM Penetration 80A5003 N/A B-E VT-2 N/

B0.12 I-SH-CRD-11 CRDM Penetration 80A5003 N/A B-E VT-2 B0.12 I-SH-CRD-12 CRDM Penetration 80A50 03 N/A B-E VT-2 N/

B0.12 I-SH-CRD-13 CRDM Penetration 80 A5003 N/A B-E VT-2 80.12 I-SH-CRD-10 CRDM Penetration 80A50 03 N/A B-E VT-2 B0.12 I-SH-CRD-15 CRDM Penetration 80A5003 N/A B-E VT-2 N/

B0.12 I-SH-CRD-16 CRDM Penetration 80A 5003 N/A B-E BO.I2 NES 223/11/81

0 Syst T Reactor Pressure Vessel Reference Drawing: A-07 PROGRAM PLAN AND SCHEDULE BY: ~ DATE:~E82 Preser vice Inspection - 5565 REV'- o PAGE 2 OF 77 SHNPP CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE -

BLOCK CODE EXAM NO. IDENTIFICATION DESCRIPTION NUMBER (II applicable) CATEGORY METHOD CLOSURE HEAD PENETRATION %ELDS 1-SH-CRD-17 CRDM Penetration 80A 5003 N/A B-E N/

B0.12 1-SH-CRD-18 CRDM Penetration 80 A5003 N/A B-E B0.12 1-SH-CRD-19 CRDM Penetration 80A5003 N/A B-E BQ. 12 1-SH-CRD-20 CRDM Penetration 80A5003 N/A B-E B0.12 I-SH-CRD-21 CRDM Penetration 80A 5003 N/A. B-E VT-2 BO.I2 1-SH-CRD-22 CRDM Penetration 80A 5003 N/A B-E B0.12 1-SH-CRD-23 CRDM Penetration 80A 5003 N/A B-E VT-2 N/

B0.12 1-SH-CRD-20 CRDM Penetration 80A 5003 N/A B-E N/

B0.12 NES 223/11/Sl

System: Reactor Pressure Vessel BY: R~ DATE: F 82 Reference Drawing: A-07 PROGRAM PLAN AND SCHEDULE Preservice Inspection SHNPP - 5565 REV: g PAGE 30 OF 77 CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (II applicabIe) CATEGORY METNOD CLOSURE HEAD PENETRATION WELDS I-SH-CRD-25 CRDM Penetration 80 A5003 N/A B-E VT-2 N/

B0.12 I-SH-CRD-26 CRDM Penetration 80 A5003 N/A B-E VT-2 N/

BO.I2 I-SH-CRD-27 CRDM Penetration 80A 5003 N/A B-E VT-2 N/

BO.I2 I-SH-CRD-28 CRDM Penetration 80 A5003 N/A B-E VT-2 B0.12 I-SH-CRD-29 CRDM Penetration 80A 5003 N/A B-E VT-2 BI1.12 I-SH-CRD-3 CRDM Penetration 80A5003 N/A '-E VT-2 N/

B0.12 I-SH-CRD-31 CRDM Penetration 80A5003 N/A B-E VT- N/

B0.12 I-SH-CRD-3 CRDM Penetration 80A5003 N/A B-E VT- N/

B0.12 NES 223/11/81

E 0

Sy T Reactor Pressure Vessel Reference Drawing: A-07 BY: ~ 0 DATE: S 82-Preservice inspection PROGRAM PLAN AND SCHEDULE SHNPP 5565 REV'AGE 3 OF 77 CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE No. IDENTIFICATION DESCRIPTION NUMBER III epplicebte) CATEGORY METHOD No.

CLOSURE HEAD PENETRATION WELDS I-SH-CRD-33 CRDM Penetration 8OA5003 N/A B-E VT-2 N/A B0.12 I-SH-CRD-30 CRDM Penetration SOA5003 N/A B-E VT-2 N/

B0.12 I-SH-CRD-35 CRDM Penetration 80A5003 N/A B-E VT-2 N/

B0.12 I-SH-CRD-36 CRDM Penetration 80A 5003 N/A B-E VT-2 80.12 I-SH-CRD-37 CRDM Penetration SOA 5003 N/A B-E VT-2 N/

B0.12 I-SH-CRD-38 CRDM Penetration SOA5003 N/A B-E VT-2 N/

B0.12 I-SH-CRD-39 CRDM Penetration SOA5003 N/A B-E VT-2 N/

B0.12 I-SH-CRD-00 CRDM Penetration SOA5003 N/A B-E VT-2 N/

B0.12 NES 223/11/81

Sy: 'Reactor Pressure Vessel DATE:~882.

Reference Drawing: A-07 Preservice Inspection PROGRAM PLAN AND SCHEDULE /( DATET~~~

SHNPP - 5565 REV: PAGE 32 OF 77 CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE No. IDENTIFICATION DESCRIPTION NUMBER III applicable) CATEGORY METHOD NO. REMARKS CLOSURE HEAD PENETRATION WELDS I-SH-CRD-01 CRDM Penetration 80A 5003 N/A B-E VT-2 N/A B0.12 I-SH-CRD-02 CRDM Penetration SOA 5003 N/A B-E VT-2 N/A B0.12 I-SH-CRD-03 CRDM Penetration 80A5003 N/A B-E VT-2 N/A B0.12 I-SH-CRD-00 CRDM Penetration 80A 5003 N/A B-E VT-2 N/A B0.12 I-SH-CRD-05 CRDM Penetration SOA5003, N/A B-E VT-2 N/A B0.12 I-SH-CRD-06 CRDM Penetration SOA 5003 N/A B-E VT-2 N/A B0.12 I-SH-CRD-07 CRDM Penetration 80A5003 N/A B-E VT-2 N/A B0.12 I-SH-CRD-0S CRDM Penetration '0A5003 N/A B-E B0.12 VT-2 N/A NES 223/ll/81

Syste: Reactor Pressure Vessel Reference Drawing: A-07 PROGRAM PLAN AND SCHEDULE BY: ~ DATE: E 82.

Preser vice Inspection REV: o PAGE OF 77 SHNPP - 5565 CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE No. IDENTIFICATION DESCRIPTION NUMBER BI applicable) CATEGORY METHOD No. REMARKS CLOSVRE HEAD PENETRATION WELDS I-SH-CRD-09 CRDM Penetration 80 A5003 N/A B-E VT-2 N/

B0.12 I-SH-CRD-50 CRDM Penetration 80A5003 N/A B-E VT-2 N/

B0.12 I-SH-CRD-51 CRDM Penetration 80A 5003 N/A B-E VT-2 N/

B0.12 I-SH-CRD-52 CRDM Penetration 80A5003 N/A B-E -VT-2 N/

B0.12 I-SH-CRD-53 CRDM Penetration 80A 5003 N/A B-E VT-2 N/

B0.12 I-SH-CRD-50 CRDM Penetration 80A5003 N/A B-E VT-2 N/

B0.12 I-SH-CRD-55 CRDM Penetration 80A5003 N/A B-E VT-2 B0.12 I-SH-CRD-56 CRDM Penetration 80A 5003 N/A B-E VT-2 N/

B0.12 NES 223/11/81

System: Reactor Pressure Vessel BY: R~ DATE: F82.

Reference Drawing: A-07 Preservice Inspection PROGRAM PLAN AND SCHEDULE SHNPP - 5565 REV: 0 PAGE 30 OF 77 CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE NO. IDENTIFICATION DESCRIPTION NUMBER III applicable) CATEGORY METHOD No. REMARKS CLOSURE HEAD PENETRATION WELDS 1-SH-CRD-57 CRDM Penetration SOA50I13 N/A B-E VT-2 N/

B0.12 1-SH-CRD-58 CRDM Penetration SOA50TIt3 N/A B-E VT-2 N/

B0.12 I-SH-VP Vent Pipe Penetration SOA5003 N/A B-E VT-2 B0.11 NES 223/11/81

E System. eactor Pressure Vessel Reference Drawing: A-07 Preser vice Inspection PROGRAM PLAN AND SCHEDULE BY: ~ DATE: 5'2-SHNPP - 5565 CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE No. IDENTIFICATION ,

DESCRIPTION NUMBER (II epplicabie) CATEGORY METHOD No. REMARKS CRDM HOUSING V/ELDS

-SH-CRDH-50 CRDM Housing /I54 80A5000 N/A B-0 PT N/A B10.10

-SH-CRDH-58 CRDM Housing I/58 80A5000 N/A B-O PT N/A B10.10

-SH-CRDH-06 CRDM Housing I/06 80A5040 N/A B-0 PT N/A B10.10

-SH-CRDH-02 CRDM Housing k/02 80A 5000 N/A B-0 PT N/A B10.10

-SH-CRDH-07 CRDM Housing //07 80A5000 N/A B-O PT N/A B10.10

-SH-CRDH-59 CRDM Housing I/59 80A5000 N/A B-0 PT N/A B10.10

-SH-CRDH-55 CRDM Housing /155 80A5000 N/A B-O PT N/A B10.10

-SH-CRDH-60 CRDM Housing I/60 80A5000 N/A B-0" PT N/A B10.10 NES 223/11/81

System. eactor Pressure Vessel DATE: 5 82 Reference Drawing: A-07 DATE: .

Preser vice Inspection - PROGRAM PLAN AND SCHEDULE REV: PAGE 36 OF 77 SHNPP - 5565 cf CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE No. IDENTIFICATION DESCRIPTION NUMBER (II applicabfe) CATEGORY METHOD No.

'RDM HOUSING WELDS I-SH-CRDH-08 CRDM Housing I/08 80A5000 N/A B-0 PT N/A B10.10 I-SH-CRDH-03 CRDM Housing I/03 80A 5000 N/A B-0 PT N/

B10.10 I-SH-CRDH-09 CRDM Housing //09 80A5040 N/A B-0 PT N/

B10.10 I-SH-CRDH-61 CRDM Housing I/61 80A5000 N/A B-0 PT N/

B10.10 I-SH-CRDH-56 CRDM Housing II56 80A5000 N/A B-0 PT N/

B10.10 I-SH-CRDH-62 CRDM Housing I/62 80A5000 N/A B-0 PT N/

B10.10 I-SH-CRDH-50 CRDM Housing II50 80A5000 N/A B-0 PT N/

BI0.10 I-SH-CRDH-00 CRDM Housing 840 80A5000 N/A B-Q PT N/

B10.10 NES 223/ll/81

Syste eactor Pressure Vessel BY: R~ DATE: 6 g2.

Reference Drawing: A-07 APP: DATE:

Preservice Inspection PROGRAM PLAN AND SCHEDULE REV: o PAGE 3 OF 77 SHNPP - 5565 CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDIJRE BLOCK CODE EXAM ZONE No. IDENTIFICATION DESCRIPTION NUMBER (II applicable) CATEGORY METHOD No. REMARKS CRDM HOUSING WELDS I-SH-CRDH-51 CRDM Housing II51 80A5000 N/A B-O PT N/

B10.10 I-SH-CRDH-63 CRDM Housing I/63 80A 5000 N/A B-0 PT B10.10 I-SH-CRDH-57 CRDM Housing //57 8OA 5000 N/A B-0 PT N/

BI 0.10 I-SH-CRDH-60 CRDM Housing /160 SOA 5000 N/A B-0 PT N/

B10.10 I-SH-CRDH-52 CRDM Housing k/52 SOA5000 N/A B-O PT B10.10 I-SH-CRDH-05 CRDM Housing I/05 SOA5000 N/A B-0 PT BI0.10 I-SH-CRDH-53 CRDM Housing $753 SOA5000 N/A B-0 B10.10 I-SH-CRDH-65 CRDM Housing II65 80A 5000 N/A B-0 PT N/

B10.10 NES 223/11/81

System: Reactor Pressure Vessel Reference Drawing: A-08 PROGRAM PLAN AND SCHEDULE BY: ~

'@~ca'~~

DATE: 5 R Preser vice Inspection - 5565 REV: o SHNPP CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE No. IDENTIFICATION DESCRIPTION NUMBER (II appIicable) CATEGORY METHOD No. REMARKS BOTTOM HEAD INSTRUMENT PENETRATION WELDS 1-SH-IP-01 Instrument Penetration $/I 80A5003 N/A B-E VT-2 B0.13 I-SH-IP-02 Instrument Penetration //2 80A5003 N/A B-E VT-2 B0.13 I-SH-IP-03 Instrument Penetration /$ 3 80A5003 N/A B-E VT-2 N/

B0.13 I-SH-IP-00 Instrument Penetration //0 80A 5003 N/A B-E VT-2 B0.13 I-SH-IP-05 Instrument Penetration //5 80A 5003 N/A B-E VT-2 N/

B0.13 I-SH-IP-06 Instrument Penetration //6 80A5003 N/A B-E VT-2 N/

B0.13 I-SH-IP-07 Instrument Penetration //7 80A5003 N/A B-E VT-2 N/

B0.13 I-SH-IP-08 Instrument Penetration kN 80A5003 N/A B-E VT-2 N/

B0.13 NES 223/ll/81

Syst . Reactor Pressure Vessel DATE: <82-Reference Drawing: A-08 DATE: 6 Preservice Inspection PROGRAM PLAN AND SCHEDULE o PAGE 3 OF 77 SHNPP - 5565 CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER OI applicable) CATEGORY METHOD No. REMARKS BOTTOM HEAD INSTRUMENT PENETRATION WELDS I-SH-IP-09 Instrument Penetration /$ 9 80A5043 N/A B-E VT-2 N/A B4.13 I-SH-IP-10 Instrument Penetration //10 80A5043 N/A B-E VT-2 N/A B4.13 I-SH-IP-11 Instrument Penetration //11 80A 5043 N/A B-E VT-2 N/A B4.13 I-SH-IP-12 Instrument Penetration /I12 80A5043 N/A B-E VT-2 N/A B4.13 I-SH-IP-13 Instrument Penetration //13 80A5043 N/A B-E VT-2 N/A B4.13 I-SH-IP-14 Instrument Penetration /I 14 80A5043 N/A B-E VT-2 N/A B4.13 I-SH-IP-15 Instrument Penetration $/15 80A 5043 N/A B-E VT-2 N/A B4.13 I-SH-IP-16 Instrument Penetration /I16 80A5043 N/A B-E VT-2 N/A B4.13 N ES 223/11/81

Syst . Reactor Pressure Vessel BY: DATE: F82 Reference Drawing: A-08 APP: DATE:

Preservice Inspection PROGRAM PLAN SHNPP, - AND SCHEDULE 5565 REV: o PAGE 0 OF 77 CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE NO. IDENTIFICATION DESCRIPTION NUMBER III eppliceble) CATEGORY METHOD No.

BOTTOM HEAD INSTRUMENT PENETRATION WELDS I-SH-IP-17 Instrument Penetration //17 80A 5003 N/A B-E VT-2 N/A BO.I3 I-SH-IP-18 Instrument Penetration /I I 8 80A5003 N/A B-E VT-2 N/A B0.13 I-SH-IP-19 Instrument Penetration I/19 80A5003 N/A B-E VT-2 N/A B0.13 I-SH-IP-20 Instrument Penetration I/20 80A5003 N/A B-E VT-2 N/A B0.13 I-SH-IP-21 Instrument Penetration I/2l 80A5003 N/A B-E VT-2 N/A B0.13 I-SH-IP-22 Instrument Penetration I/22 80A5003 N/A B-E VT-2 N/A BT1.13 I-SH-IP-23 Instrument Penetration I/23 80A5003 N/A B-E VT-2 'N/A B0.13 I-SH-IP-20 Instrument Penetration II20 80A5003 N/A B-E VT-2 N/A B0.13 NES 223/II/81

System:T Reactor Pressure Vessel Reference Drawing: A-08 Preservice Inspection PROGRAM PLAN AND SCHEDULE BY: ~ DATE: 8 82 SHNPP - 5565 REV: a PAGE 01 OF 77 CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK COO E EXAM ZONE IOENTIFICATION DESCRIPTION NUMBER {IIeppllcable) CATEGORY METHOO No. REMARKS BOTTOM HEAD INSTRUMENT PENETRATION WELDS 1-SH-IP-25 Instrument Penetration II25 80A5003 N/A. B-E VT-2 B0.13 I-SH-IP-26 Instrument Penetration k/26 80A5003 N/A B-E VT-2 N/

B0.13 1-SH-IP-27 Instrument Penetration /f27 80A5003 N/A B-E VT-2 N/

B0.13 1-SH-IP-28 Instrument Penetration f328 80A5003 N/A B-E VT-2 N/

B0.13 1-SH-IP-29 Instrument Penetration I/29 80A 5003 N/A B-E VT-2 N/

B0.13 r

.1-SH-IP-30 Instrument Penetration /I30 80A5003 N/A B-E VT-2 N/

B0.13 1-SH-IP-31 Instrument Penetration II31 80A 5003 N/A B-E VT-2 N/

B0.13 1-SH-IP-32 Instrument Penetration /$ 32 80A5003 N/A B-E VT-2 N/

B0.13 N ES 223/I 1/81

r Sy: Reactor Pressure Vessel BY: V~ DATE: 5'dit2 Reference Drawing: A-08 Preservice Inspection PROGRAM PLAN AND SCHEDULE APP: ( DATE: . z SHNPP - 5565 REV: o PAGE 02 OF 77 CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE No. IDENTIFICATION DESCRIPTION NUMBER (II appllcabla) CATEGORY METHOD No. REMARKS BOTTOM HEAD INSTRUMENT PENETRATION WELDS I-SH-IP-33 Instrument Penetration I/33 80A 5003 N/A B-E VT-B0.13 I-SH-IP-30 Instrument Penetration I/30 80A 5003 N/A B-E VT-2 B0.13 I-SH-IP-35 Instrument Penetration I/35 SOA50TI'3 N/A B-E VT-2 N/

B0.13

= I-SH-IP-36 Instrument Penetration I/36 8OA5003 N/A B-E VT-2 B0.13 I-SH-IP-37 Instrument Penetration II37 SOA5003 N/A B-E VT-2 N/

B0.13 I-SH-IP-38 Instrument Penetration /I38 80A 5003 N/A B-E VT-2 BO.I3 I-SH-IP-39 Instrument Penetration /$ 39 SOA5003 N/A B-E VT-2 BO. 13 I-SH-IP-00 Instrument Penetration I/00 SOA5003 N/A B-E VT-2 N/

BO.I3 NES 223/11/81

System: Reactor Pressure Vessel Reference Drawing: A-08 Preser vice Inspection PROGRAM PLAN AND SCHEDULE BY: ~ DATE: 2.

SHNPP - 5565 CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE No. IDENTIFICATION DESCRIPTION NUMBER (II eppIlceble) CATEGORY METHOD No. REMARKS BOTTOM HEAD INSTRUMENT PENETRATION WELDS 1-SH-IP-01 Instrument Penetration 1301 80A5003 N/A B-E VT-2 N/

B0.13 I-SH-IP-02 Instrument Penetration II02 80A 5003 N/A B-E VT-2 N/

B0.13 1-SH-IP-03 Instrument Penetration //03 80A5003 N/A B-E VT-2 N/

B0.13 I-SH-IP-00 Instrument Penetration 5300 80A5003 N/A B-E VT-2 N/

B0.13 1-SH-IP-05 Instrument Penetration I/05 80A5003 N/A VT-2 N/

1-SH-IP-06 Instrument Penetration II06 80A5003 N/A VT-2 N/

I-SH-IP-07 Instrument Penetration I/07 80A5003 N/A B-E VT-2 N/

B0.13 I-SH-IP-08 Instrument Penetration II08 80A5003 N/A B-E VT-2 N/

B0.13 N ES 223/11/81

Sys . Reactor Pressure Vessel Reference Drawing: A-OS Preser vice Inspection CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE NO. IDENTIFICATION DESCRIPTION NUMBER (II applicable) CATEGORY METHOD No. REMARKS BOTTOM HEAD INSTRUMENT PENETRATION WELDS I-SH-IP-09 Instrument Penetration /N9 8OA5003 N/A B-E VT-2 N/A B0.13 I-SH-IP-50 Instrument Penetration /750 SOA5003 N/A B-E VT-2 N/A BO.I3 NES 223/11/81

Syste T Reactor Pressure Vessel BY: DATE: 82.

Reference Drawing: A-09, 10 PROGRAM PLAN AND SCHEDULE Preservice Inspection- - 5565 REV: o PAGE 0 OF 77 SHNPP CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE No. IDENTIFICATION DESCRIPTION NUMBER (II eppIicable) CATEGORY METHOD No. REMARKS CLOSURE HEAD BOLTING 80A5008 SHNPP- UT I-SH-STUD-Ol Closure Stud I/OI STUD-6 B-G-I N/A 80A5000 N/A B6.30 PT 80A5008 SHNPP- UT I-SH-STUD-02 Closure Stud //02 STUD-6 B-G-I N/A 80A5000 N/A B6.30 PT 80A5008 SHNPP- UT I-SH-STUD-03 Closure Stud //03 STUD-6 B-G-I N/A 80A 5000 N/A B6.30 PT 80A5008 SHNPP- UT I-SH-STUD-00 Closure Stud //00 STUD-6 B-G-I N/A 80A5000 N/A B6.30 PT 80A5008 SHNPP- UT I-SH-STUD-05 Closure Stud //05 STUD-6 B-G-I N/A 80A5000 N/A B6.30 PT 80A5008 SHNPP- UT I-SH-STUD-06 Closure Stud I/06 STUD-6 B-G-I N/A 80A5000 N/A B6.30 PT 80A5008 SHNPP- UT I-SH-STUD-07 Closure Stud II07 STUD-6 B-G-I N/A 80A5000 N/A B6.30 PT 80A5008 SHNPP- UT I-SH-STUD-08 Closure Stud I/08 STUD-6 B-G-I N/A 80A 5000 N/A B6.30 PT NES 223/11/81

Sy  : Reactor Pressure Vessel Reference Drawing: A-09, 10 Preser vice Inspection PROGRAM PLAN AND SCHEDULE SHNPP - 5565 BY:

REV

~

o DATE: 5 PAGE f16 2.

OF 77 CALIBRATION CODE ITEM 'OMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE NO. IDENTIFICATION DESCRIPTION NUMBER (II epplicebfe) CATEGORY METHOD No. REMARKS CLOSURE HEAD BOLTING

- SOA5008 SHNPP- UT I-SH-STUD-0 Closure Stud //09 STUD-6 8-G-I SOA50N N/A 86.30 PT N P- UT I-SH-STUD-I Closure Stud I/10 STUD-6 8-G-I SOA5000 N/A 86.30 PT SOA50ff8 SHNPP- UT I-SH-STUD-I Closure Stud //11 STUD-6 B-G-I SOA5000 N/A 86.30 PT SOA5008 SHNPP- UT I-SH-STUD-I Closure Stud II12 STUD-6 B-G-I SOA5000 N/A 86.30 . PT, SOA500S SHNPP- UT I-SH-STUD-I Closure Stud //13 STUD-6 8-G-I SOA5000 N/A 86.30 PT SOA5008 SHNPP- UT.

I-SH-STUD-I Closure Stud //10 STUD-6 8-G-I SOA5000 N/A 86.30 PT SOA5008 SHNPP- UT I-SH-STUD-I Closure Stud II15 STUD-6 8-G-I I

SOA5000 N/A 86.30 PT SOA5008 SHNPP- UT I-SH-STUD-I Closure Stud I/16 STUD4 8-G-I SOA5000 N/A 86.30 PT NES 223/11/81

Sys m: Reactor Pressure Vessel Reference Drawing: A-09, 10 PROGRAM PLAN AND SCHEDULE BY: ~ DATE: 5 82.

Preservice Inspection SHNPP - 5565 REV: o PAGE 07 OF'7 CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE NO. IDENTIFICATION DESCRIPTION NUMBER BI e pplicable) CATEGORY METHOD No. REMARKS CLOSURE HEAD BOLTING SHNPP- UT I-SH-STUD-I Closure Stud /I 17 80A5008'0A5000 STUD-6 B-G-I N/A B6.30 .PT 80A5008 SHNPP- UT I-SH-STUD-I Closure Stud I/18 STUD-6 B-G-I 80A5000 N/A B6.30 PT 80A5008 SHNPP- UT I-SH-STUD-I Closure Stud //19 STUD-6 B-G-I 80A 5000 N/A B6.30 PT 80A'5008 SHNPP- UT I-SH-STUD-2 Closure Stud I/20 STUD-6 B-G-I 80A5000 N/A B6.30 80A5008 SHNPP- UT I-SH-STUD-2 Closure Stud I/21 STUD-6 B-G-I N/

80A5000 N/A B6.30 PT 80A5008 SHNPP- UT I-SH-STUD-2 Closure Stud II22 STUD-6 B-G-80A5000 N/A B6.30 PT 80A5008 SHNPP- UT I-SH-STUD-2 Closure Stud II23 STUD-6 B-G-80A5000 N/A B6.30 PT 80A5008 SHNPP- UT I-SH-STUD-2 Closure Stud /I20 STUD-6 B-G-80A50N N/A B6.30 PT N ES 223/11/81

r Sys: Reactor Pressure Vessel BY: DATE: S 2.

Reference Drawing: A-09, 10 DATE: 2 Preservice Inspection PROGRAM PLAN AND SCHEDULE o SHNPP - 5565 REV: PAGE 08 OF 77 CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE NO. IDENTIFICATION DESCRIPTION NUMBER (II applicabfe) CATEGORY METHOD No. REMARKS CLOSURE HEAD BOLTING 80A5008 SHNPP- UT I-SH-STUD-2 Closure Stud //25 STUD-6 B-G-I N/

SOA5000 N/A B6.30 PT SOA500S SHNPP- UT I-SH-STUD-2 Closure Stud I/26.. STUD-6 B-G-I 80A5000 N/A B6.30 PT 80A5008 SHNPP- UT I-SH-STUD-2 Closure Stud /I27 STUD-6 B-G-I N/

SOA 5000 N/A B6.30 PT SOA5008 SHNPP- UT I-SH-STUD-2 Closure Stud II28 STUD-6 B-G-I N/

80A5000 N/A B6.30 PT SOA5008 SHNPP- UT I-SH-STUD-2 Closure Stud I/29 STUD-6 B-G-I N/

80A5000 N/A B6.30 PT SOA5008 SHNPP- UT I-SH-STUD-3 Closure Stud I/30 STUD-6 B-G-I 80A 5000 N/A B6.30 PT SOA5008 SHNPP- UT I-SH-STUD-3 Closure Stud /I31 STUD-6 B-G-I N/

8OA5000 N/A B6.30 80A5008 SHNPP- UT I-SH-STUD-3 Closure Stud /132 STUD-6 B-G-I N/

80A5000 N/A B6.30 PT NES 223/11/81

System: Reactor Pressure Vessel Reference Drawing: A-09, 10 Preservice Inspection PROGRAM PLAN AND SCHEDULE BY: ~ DATE: S 82-OF 77 SHNPP - 5565 REV PAGE 4 CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE No. IDENTIFICATION DESCRIPTION NUMBER (II epplicebIe) CATEGORY METHOD NO. REMARKS CLOSURE HEAD BOLTING 80A504S SHNPP- UT I-SH-STUD-3 Closure Stud II33 STUD-6 B-G-I SOA5044 N/A B6.30 PT 80A5048 SHNPP- UT I-SH-STUD-3 Closure Stud II34 STUD-6 B-G-I N/

80A5044 N/A B6.30 PT SOA 5048 SHNPP- UT I-SH-STUD-3 Closure Stud II35 STUD-6 B-G-I N/

SOA5044 N/A B6.30 PT SOA5048 SHNPP- UT I-SH-STUD-3 . Closure Stud II36 STUD-6 B-G-l N/

SOA5044 N/A B6.30 PT SOA5048 SHNPP- UT I-SH-STUD-3 Closure Stud II37 STUD-6 B-G-I N/

SOA5044 N/A B6.30 PT SOA5048 SHNPP- UT I-SH-STUD-3 Closure Stud I/38 STUD-6 B-G-I

, 80A5044 N/A B6.30 PT SOA5048 SHNPP- UT I-SH-STUD-3 Closure Stud II39 STUD-6 B-G-l N/

80A5044 N/A B6.30 PT 80A5048 SHNPP- UT I-SH-STUD-4 Closure Stud I/40 STUD-6 B-G-I SOA5044 N/A B6.30 PT NES 223/11/81

Sys  : Reactor Pressure Vessel BY: DATE: 82.

Reference Drawing: A-09, 10 DATE:

Preservice Inspection PROGRAM PLAN AND SCHEDULE SHNPP - 5565 REy'l PAGE 50 OF 77 CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE No. IDENTIRCATION DESCRIPTION NUMBER (II eppIicable) CATEGORY METHOD No. REMARKS CLOSURE HEAD BOLTING 80A500S SHNPP- UT I-SH-STUD-01 Closure Stud II41 STUD-6 B-G-I N/

SOA5000 N/A B6.30 PT SOA5008 SHNPP- UT I-SH-STUD-02 Closure Stud II42 STUD-6 B-G-I N/

80A5000 N/A B6.30 PT 80A5008 SHNPP- UT I-SH-STUD-03 Closure Stud I/03 STUD-6 B-G-I N/

80A5000 N/A B6.30 PT SOA5008 SHNPP- UT, I-SH-STUD-00 Closure Stud II04 STUD-6 B-G-I SOA5000 N/A B6.30 PT SOA5008 SHNPP- UT I-SH-STUD-05 Closure Stud 805 STUD-6 B-G-I N/

SOA5000 N/A B6.30 PT SOA5008 SHNPP- UT I-SH-STUD-06 Closure Stud /I06 STUD-6 B-G-l N/

80A5000 N/A B6.30 PT SOA5008 SHNPP- UT I-SH-STUD-07 . Closure Stud $307 STUD-6 B-G-I N/

80A5000 N/A B6.30 PT 80A5008 SHNPP- UT I-SH-STUD-08 Closure Stud II48 STUD-6 B-G-I SOA5000 N/A B6.30 PT NES 223/11/81

Sys m: Reactor Pressure Vessel Reference Drawing: A-09, 10 PROGRAM PLAN AND SCHEDULE BY! ~ DATE: < 2.

Preservice Inspection - 5565 REV: o PAGE 5 OF 77 SHNPP CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE No. IDENTIFICATION DESCRIPTION NUMBER (II applicable) CATEGORY METHOD No. REMARKS CLOSURE HEAD BOLTING 80A5008 SHNPP- UT I-SH-STUD-0 Closure Stud //09 STUD-6 B-G-I N/

80A 5000 N/A B6.30 PT 80A 5008 SHNPP- UT I-SH-STUD-5 Closure Stud //50 STUD-6 B-G-I N/

80A 5000 N/A B6.30,. PT 80A5008 UT I-SH-STUD-5 Closure Stud I/5I STUD-6 B-G-I N/

80A5000 N/A B6.30 PT 80A5008 SHNPP- UT I-SH-STUD-5 Closure Stud //52 STUD-6 B-G-I 80A5000 N/A B6.30 PT.

80A5008 SHNPP- UT I-SH-STUD-5 Closure Stud /I53 STUD-6 B-G-I 80A 5000 N/A B6.30 PT 80A5008 SHNPP- UT.

I-SH-STUD-5 Closure Stud II50 STUD-6 80A5000'HNPP- B-G-I N/

80A5000 N/A B6.30 PT 80A5008 SHNPP- UT I-SH-STUD-5 Closure Stud /I55 STUD-6 B-G-I N/

80A5000 N/A B6.30 PT 80A5008 SHNPP- UT I-SH-STUD-5 Closure Stud I/56 STUD-6 B-G-I N/A B6.30 PT NES 223/11/81

Sy: Reactor Pressure Vessel Reference Drawing: A-09, 10 BY: acne DATE:~dI2.

Preservice Inspection PROGRAM PLAN AND SCHEDULE 77.-

SHNPP 5565 REV: o PAGE 52 OF CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE No. IDENTIFICATION DESCRIPTION NUMBER (II applicable) CATEGORY METHOD REMARKS CLOSURE HEAD BOLTING 80A5008 SHNPP- UT I-SH-STUD-5 Closure Stud $/57 STUD-6 B-G-l 80A5000 N/A B6.30 PT 80A5008 SHNPP- UT I-SH-STUD-5 Closure Stud II58 STUD-6 B-G-l N/

80A5000 N/A B6.30 PT NES 223/11/81

Sys  :'Reactor Pressure Vessel R.~ DATE: 6'-

Reference Dravring: A-09, 10 DATE:

Preservice Inspection PROGRAM PLAN AND SCHEDULE SHNPP - 5565 REV: o PAGE 5 OF 77 CAUBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE No. IDENTIFICATION ~ DESCRIPTION NUMBER {IIapplicable) CATEGORY METNOD No. REMARKS CLOSURE HEAD BOLTING I-SH-NUT-01 Closure Head Nut $301 SO A5000 N/A B-G-I PT N/A B6.10 I-SH-NUT-02 Closure Head Nut.I/02 80A 5000 N/A B-G-I PT N/A B6.10 I-SH-NUT-03 Closure Head Nut I/03 SOA5000 N/A B-G-I PT -

N/A B6.10 I-SH-NUT-00 Closure Head Nut //00 SOA5000 N/A B-G-I PT N/A B6.10

= I-SH-NUT-05 Closure Head Nut //05 80A5000 N/A B-G-I PT N/A B6.10 I-SH-NUT-06 Closure Head Nut //06 80 A5000 N/A B-G-I'6.10 PT N/A I-SH-NUT-07 Closure Head Nut //07 80 A5000 N/A B-G-I PT N/

B6.10 I-SH-NUT-OS Closure Head Nut //08 80A5000 N/A B-G-I PT N/

B6.10 NES 223/11/81

Sys . Reactor Pressure Vessel Reference Drawing: A-09, 10 Preser vice Inspection PROGRAM PLAN AND SCHEDULE SHNPP 5565 BY:

REV: ~ DATE: 5 82-DATE:

PAGE 5 OF 77 CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE No. IDENTIFICATION DESCRIPTION NUMBER {IIepplicabfe) CATEGORY METHOD No. REMARKS CLOSURE HEAD BOLTING I-SH-NUT-09 Closure Head Nut 809 SOA5000 N/A B-G-I PT N/

B6.10 I-SH-NUT-10 Closure Head Nut I/10 80A5000 N/A B-G-I PT N/

B6.10 I-SH-NUT-11 Closure Head Nut IIII 80A5000 N/A B-G-I PT N/

B6.10 I-SH-NUT-12 Closure Head Nut II12 SOA 5000 N/A B-G-I PT N/

B6.10 I-SH-NUT-13 Closure Head Nut II'I3 80A5000 N/A B-G-l PT B6.10 I-SH-NUT-10 Closure Head Nut III0 SOA5000 N/A B-G-I N/A B6.10 I-SH-NUT-15 Closure Head Nut I/15 SOA5000 N/A B-G-l PT N/A B6.10 I-SH-NUT-16 Closure Head Nut I/I6 80A5000 B-G-I PT B6.10 NES 223/ll/81

S: Reactor Pressure Vessel Reference Drawing: A-09, 10 Preser vice Inspection PROGRAIIIIglfIIINAPD BCHEDVLE BY:

APP:

~Q DATE:~BE DATE:

BEy. < PAGE 5 QF 77 CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDVRE BLOCK CODE EXAM ZONE No. IDENTIFICATION DESCRIPTION NUMBER (II applfcable) CATEGORY METHOD CLOSURE HEAD BOLTING I-SH-NUT-17 Closure Head Nut /II7 80A5000 N/A B-G-I N/

B6.10 I-SH-NUT-18 Closure Head Nut I/18 80A 500 0 N/A B-G-I PT N/

B6.10 I-SH-NUT-19 Closure Head Nut III9 80A 500 0 N/A B-G-I PT N/

B6.10 I-SH-NUT-20 Closure Head Nut /I20 80A50tf0 N/A B-G-I PT N/

B6.10 I-SH-NUT-21 Closure Head Nut II2I 80A5000 N/A B-G-I PT B6.10 I-SH-NUT-22 Closure Head Nut //22 80A5000 N/A B-G-I PT N/

B6.10 I-SH-NUT-23 Closure Head Nut /I23 80A5000 N/A B-G-I PT B6.10 I-SH-NUT-20 Closure Head Nut I/20 80A5000 N/A B-G-I PT B6.10 NES 223/11/81

Sys Reactor Pressure Vessel BY: RPCJ DATE: g2.

Reference Drawing: A-09, 10 APP: [ DATE:

Preservice InsPection PROGRAM PLAN AND SCHEDULE o SHNPP - 5565 REV: PAGE 5 OF 77 CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE No. IDENTIFICATION DESCRIPTION NUMBER (II applicable) CATEGORY METHOD No. REMARKS CLOSURE HEAD BOLTING I-SH-NUT-25 Closure Head Nut /I25 80 A5000 N/A B-G-I PT N/A B6.10 I-SH-NUT-26 Closure Head Nut 1126 80A5000 N/A B-G-I N/A B6.10 I-SH-NUT-27 Closure Head Nut II27 80A 5000 N/A B-G-I PT N/A B6.10 I-SH-NUT-28 Closure Head Nut I/28 80A5000 N/A B-G-I PT N/A B6.10 I-SH-NUT-29 Closure Head Nut II29 80A5000 N/A B-G-I PT N/A B6.10 I-SH-NUT-30 Closure Head Nut II30 80A5000 N/A B-G-I PT N/A B6.10 I-SH-NUT-31 Closure Head Nut II31 80A5000 N/A B-G-I PT N/A B6.10 I-SH-NUT-32 Closure Head Nut II32 80A5000 N/A B-G-I PT N/A B6.10 NES 223/11/81

Syste . Reactor Pressure Vessel Reference Drawing: A-09, 10 BY: R~ DATE: 82-Preservice Inspection PROGRAM PLAN AND SCHEDULE o SHNPP - 5565 REV:

CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE No. IDENTIFICATION DESCRIPTION NUMBER (II applicable) CATEGORY METHOD No. REMARKS CLOSURE HEAD BOLTING I-SH-NUT-33 Closure Head Nut //33 SOA5044 N/A B-G-l PT N/A B6.10 I-SH-NUT-34 Closure Head Nut II34 SOA5044 N/A B-G-I PT N/A B6.10 I-SH-NUT-35 Closure Head Nut I/35 SOA5044 N/A B-G-l PT N/A B6.10 I-SH-NUT-36 Closure Head Nut //36 80A5044 N/A B-G-I PT N/A B6.10 I-SH-NUT-37 Closure Head Nut II37 I'0A5044 N/A B-G-I PT N/A B6.10 I-SH-NUT-38 Closure Head Nut I/38 80A5044 N/A B-G-I PT N/A B6.10 A

I-SH-NUT-39 Closure Head Nut 839 SOA5044 N/A B-G-I PT N/A B6.10 I-SH-NUT-40 Closure Head Nut I/40 80A 5044 N/A B-G-I PT N/A B6.10 N ES 223/11/81

Sys: Reactor Pressure Vessel Reference Drawing: A-09, 10 Preser vice Inspection CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (II e ppliceble) CATEGORY METHOD No. REMARKS CLOSURE HEAD BOLTING I-SH-NUT-01 Closure Head Nut //01 80A5000 N/A B-G-I N/

B6.10 I-SH-NUT-02 Closure Head Nut L/02 SOA5000 N/A B-G-I - PT N/

B6.10 I-SH-NUT-03 Closure Head Nut //03 SOA5000 N/A B-G-I PT B6.10 I-SH-NUT-00 Closure Head Nut $340 80A5000 N/A B-G-l PT B6.10 I-SH-NUT-05 Closure Head Nut //05 80A5000 N/A B-G-I PT B6.10 I-SH-NUT-06 Closure Head Nut //46 80A5004 N/A B-G-I. PT N/

B6.10 I-SH-NUT-07 Closure Head Nut $/07 SOA5000 N/A B-G-I PT B6.10 I-SH-NUT-0S Closure Head Nut //08 SOA5000 N/A B-G-I PT N/

B6.10 NES 223/11/81

Syst  : 'Reactor Pressure Vessel R~ DATE: 82.

Reference Drawing: A-09, 10 PROGRAM PLAN AND SCHEDULE t( DATE:

Preservice Inspection - 5565 REV: cI PAGE 5 OF 77 SHNPP CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE No. IDENTIFICATION DESCRIPTION NUMBER (II eppIiceble) CATEGORY METHOD No. REMARKS CLOSURE HEAD BOLTING I-SH-NUT-09 Closure Head Nut /N9 80A5000 N/A B-G-I PT B6.10 I-SH-NUT-50 Closure Head Nut $550 80 A5000 N/A B-G-I PT N/

B6.10 I-SH-NUT-51 Closure Head Nut II5I 80A5000 N/A B-G-I PT B6.10 I-SH-NUT-52 Closure Head Nut I/52 80A5000 N/A B-G-I PT B6.10 I-SH-NUT-53 Closure Head Nut II53 80A5000 N/A B-G-I PT N/

B6.10 I-SH-NUT-50 Closure Head Nut /I50 80A5000 N/A B-G-I PT N/

B6.10 I-SH-NUT-55 Closure Head Nut /I55 80A5000 N/A B-G-I PT B6.10 I-SH-NUT-56 Closure Head Nut II56 80A5000 N/A B-G-I PT N/

B6.10 N ES 223/11/81

System:T Reactor Pressure Vessel Reference Drawing: A-09, 10 Preservice Inspection PROGRAM PLAN AND SCHEDULF BY: ~ DATE: 82 SHNPP - 5565 CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE No. IDENTIFICATION DESCRIPTION NUMBER (II applicable) CATEGORY METHOD No. REMARKS CLOSURE HEAD BOLTING 1-SH-NUT-57 Closure Head Nut II57 80A5000 N/A B-G-l PT N/

B6.10 1-SH-NUT-58 Closure Head Nut II58 80A 500 0 N/A B-G-1 PT N/

B6.10 NES 223/11/81

Sys  : Reactor Pressure Vessel Reference Drawing: A-09, 10 Preservice Inspection PROGRAM PLAN AND SCHEDULE BY:

REV:

~

o DATE:

PAGE 6 82 OF 77 SHNPP - 5565 CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE No. IDENTIFICATION DESCRIPTION NUMBER (II appIiceble) CATEGORY METHOD No. REMARKS CLOSURE HEAD BOLTING I-SH-THD-01 Vessel Flange Thread, Hole I/OI 80A 5039 SHNPP- B-G-I UT N/

UT-5 B6.00 I-SH-THD-02 Vessel Flange Thread, Hole I/02 80A 5039 SHNPP- B-G-I UT UT-5 B6.00 I-SH-THD-03 Vessel Flange Thread, Hole 803 80A 5039 SHNPP- B-G-l UT N/

UT-5 B6.00 I-SH-THD-00 Vessel Flange Thread, Hole I/00 80A5039 SHNPP- B-G-I UT N/

UT-5 B6.00 I-SH-THD-05 Vessel Flange Thread, Hole II05 80A5039 SHNPP- B-G-I UT UT-5 B6.00 I-SH-THD-06 Vessel Flange Thread, Hole I/06 80A 5039 SHNPP- B-G-I UT N/

UT-5 B6.00 I-SH-THD-07 Vessel Flange Thread, Hole I/07 80A5039 SHNPP- B-G-I UT UT-5 B6.00 I-SH-THD-08 Vessel Flange Thread, Hole I/08 80A5039 SHNPP- B-G-I UT N/

UT-5 B6.00 MES 223/ll/81

Sys . Reactor Pressure Vessel Reference Drawing: A-09, 10 Preservice Inspection PROGRAM PLAN AND SCHEDULE SHNPP - 5565 REVL ~ DATE:~82.

DATE:~I~

PAGE 62 OF 77 CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE No. IDENTIFICATION DESCRIPTION NUMBER {IIepplIcable) CATEGORY METHOD NO.

CLOSURE HEAD BOLTING I-SH-THD-09 Vessel Flange Thread, Hole //09 80A 5039 SHNPP- B-G-I UT N/A UT-5 B6.00 I-SH-THD-10 Vessel Flange Thread, Hole II IO 80A 5039 SHNPP- B-G-I UT N/A UT-5 B6.00 I-SH-THD-11 Vessel Flange Thread, Hole /I I I 80A5039 SHNPP- B-G-I UT N/A UT-5 B6.00 I-SH-THD-12 Vessel Flange Thread, Hole /I12 80A 5039 SHNPP- B-G-I UT N/A UT-5 B6.00 I-SH-THD-13 Vessel Flange Thread, Hole //13 80A 5039 SHNPP- -B-G-I UT N/A UT-5 B6.00 I-SH-THD-10 Vessel Flange Thread, Hole //10 80A5039 SHNPP- B-G-I UT N/A UT-5 B6.00 I-SH-THD-15 Vessel Flange Thread, Hole /I I 5 80A5039 SHNPP- B-G-I UT N/A UT-5 B6.00 I-SH-THD-16 Vessel Flange Thread, Hole $716 80A 5039 SHNPP- B-G-I UT N/A UT-5 B6.00 NES 223/11/81

Sys . Reactor Pressure Vessel DATE: I82.

Reference Drawing: A-09, 10 DATE: 5 Preservice Inspection PROGRAM PLAN AND SCHEDUl E Rpv, PAGE 6 OF 77 SHNPP - 5565 CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE No. IDENTIFICATION DESCRIPTION NUMBER (II sppIicable) CATEGORY METHOD No. REMARKS CLOSURE HEAD BOLTING I-SH-THD-17 Vessel Flange Thread, Hole /I17 80A5039 SHNPP- 8-G-I UT N/A UT-5 86.40 I-SH-THD-18 Vessel Flange Thread, Hole II18 80A5039 SHNPP- 8-G-I UT N/A UT-5 86.40 ~

I-SH-THD-19 Vessel Flange Thread, Hole /I19 80A 5039 SHNPP- 8-G-I UT N/A UT-5 86.40 I-SH-THD-20 Vessel Flange Thread, Hole /I20 80A5039 SHNPP- 8-G-I UT N/A UT-5 86.40 I-SH-THD-21 Vessel Flange Thread, Hole II21 80A5039 SHNPP- B-G-I UT N/A UT-5 86.40 I-SH-THD-22 Vessel Flange Thread, Hole I/22 80A5039 SHNPP- 8-G-I UT N/A UT-5 86.40 I-SH-THD-23 Vessel Flange Thread, Hole II23 80A 5039 SHNPP- B-G-I UT N/A UT-5 86.40 I-SH-THD-24 Vessel Flange Thread, Hole II24 80A 5039 SHNPP- 8-G-I UT N/A UT-5 86.40 NES 223/11/81

Syst Reactor Pressure Vessel Reference Drawing: A-09, 10 BY: R~ DATE: 2 Preser vice Inspection PROGRAM PLAN AND SCHEDULE o 60'F SHNPP - 5565 REV: PAGE 77 CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDINE BLOCK CODE EXAM ZONE No. IDENTIFICATION DESCRIPTION NUMBER (II applicable) CATEGORY METHOD No. REMARKS CLOSURE HEAD BOLTING I-SH-THD-25 Vessel Flange Thread, Hole I/25 80A 5039 SHNPP- B-G-I UT N/A UT-5 B6.00 I-SH-THD-26 Vessel Flange Thread, Hole I/26 80A 5039 SHNPP- B-G-I UT N/A UT-5 B6.00 I-SH-THD-27 Vessel Flange Thread, Hole II27 80A5039 SHNPP- B-G-I UT N/A UT-5 B6.00 I-SH-THD-28 Vessel Flange Thread, Hole I/28 80A5039 SHNPP- B-G-I UT N/A UT-5 B6.00 I-SH-THD-29 Vessel Flange Thread, Hole 1I29 80A 5039 SHNPP-. B-G-I UT N/A UT-5 B6.00 I-SH-THD-30 Vessel Flange Thread, Hole I/30 80A5039 SHNPP- B-G-l UT N/A UT-5 B6.00 I-SH-THD-31 Vessel Flange Thread, Hole II3I 80A 5039 SHNPP- B-G-I UT N/A UT-5 B6.00 I-SH-THD-32 Vessel Flange Thread, Hole II32 80A5039 SHNPP- B-G-I UT N/A UT-5 B6.00 NES 223/11/81

Sy  : Reactor Pressure Vessel Reference Drawing: A-09, 10 Preservice Inspection PgaoggM Pl gg AMP SCHpouLE BY: ~ DATE: & 2.

SHNPP - 5565 REV: a PAGE 6 OF 77 CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE No. IDENTIFICATION DESCRIPTION NUMBER BI applIcable) CATEGORY METHOD No..

CLOSURE HEAD BOLTING I-SH-THD-33 Vessel Flange Thread, Hole //33 80A5039 SHNPP- B-G-I UT N/

UT-5 B6.00 I

I-SH-THD-30 Vessel Flange Thread, Hole f/30 80A 5039 SHNPP- B-G-I UT N/

UT-5 B6.00 I-SH-THD-35 Vessel Flange Thread, Hole //35 80A5039 SHNPP- B-G-I UT N/

UT-5 B6.00 I-SH-THD-36 Vessel Flange Thread, Hole //36 80A 5039 SHNPP- B-G-I UT N/

UT-5 B6.00 I-SH-THD-37 Vessel Flange Thread, Hole /$ 37 80A5039 SHNPP- B-G-I UT N/

UT-5 B6.00 I-SH-THD-38 Vessel Flange Thread, Hole //38 80A5039 SHNPP-UT-5

'-G-I 'T B6.00 N/

I-SH-THD-39 Vessel Flange Thread, Hole $339 80A5039 SHNPP- B-G-I UT N/

UT-5 B6.00 I-SH-THD-00 Vessel Flange Thread, Hole //00 80A5039 SHNPP- B-G-I UT N/

UT-5 B6.00 MES 223/11/81

Sys Reactor Pressure Vessel BY: R&c DATE: 82 Reference Drawing: A-09, 10 Preservice Inspection PROGRAM PL'AN AND SCHEDULE SHNPP - 5565 REV: o PAGE 66 OF 77 CALIBRATION CODE COMPONENT COMPONENT PROCEDURE =

BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER III eppliceble) CATEGORY METHOD No. REMARKS CLOSURE HEAD BOLTING I-SH-THD-01 Vessel Flange Thread, Hole I/01 SOA5039 SHNPP- B-G-I UT N/

UT-5 66.00 I-SH-THD-02 Vessel Flange Thread, Hole //02 80A5039 SHNPP- B-G-I UT N/

UT-5 B6.00 I-SH-THD-03 Vessel Flange Thread, Hole //03 80A5039 SHNPP- B-G-I UT N/

UT-5 B6.00 I-SH-THD-00 Vessel Flange Thread, Hole /100 80A 5039 SHNPP- B-G-I UT N/

UT-5 B6.00 I-SH-THD-05 Vessel Flange Thread, Hole II05 SOA5039 SHNPP- B-G-I UT N/

UT-5 B6.00 I-SH-THD-06 Vessel Flange Thread, Hole /106 8OA5039 SHNPP- B-G-I UT N/

UT-5 B6.00 I-SH-THD-07 Vessel Flange Thread, Hole /I07 SOA 5039 SHNPP- B-G-I UT N/

UT-5 B6.00 I-SH-THD-08 Vessel Flange Thread, Hole //08 SOA5039 SHNPP- B-G-I UT N/

UT-5 B6.00 NES 223/11/81

a Syst Reactor Pressure Vessel B YT PQnC DATE:

g2.

Reference Drawing: A-09, 10 DATE:

Preser vice Inspection PROGRAM PLAN AND SCHEDULE REV: o PAGE 6 OF 77 SHNPP 5565 CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE NO. IDENTIFICATION DESCRIPTION NUMBER (II applicable) CATEGORY METHOD NO. REMARKS CLOSURE HEAD BOLTING I-SH-THD-09 Vessel Flange Thread, Hole lI09 80A5039 SHNPP- B-G-I UT N/A UT-5 B6.00 I-SH-THD-50 Vessel Flange Thread, Hole I/50 80A5039 SHNPP- B-G-I UT N/

UT-5 B6.00 I-SH-THD-51 Vessel Flange Thread, Hole /I51 80A 5039 SHNPP- B-G-l UT N/A UT-5 B6.00 I-SH-THD-52 Vessel Flange Thread, Hole /I52 80A5039 SHNPP- B-G-I UT N/A UT-5 B6.00 I-SH-THD-53 Vessel Flange Thread, Hole II53 80A 5039 SHNPP- B-G-I UT N/A UT-5 B6.00 I-SH-THD-50 Vessel Flange Thread, Hole II50 80A5039 SHNPP- B-G-I UT N/A UT-'5 B6.00 I-SH-THD-55 Vessel Flange Thread, Hole 855 80A 5039 SHNPP- B-G-I UT N/A .

UT-5 B6.00 I-SH-THD-56 Vessel Flange Thread, Hole //56 80A 5039 SHNPP- B-G-I UT N/A UT-5 B6.00 NES 223/11/sl

Sys: Reactor Pressure Vessel DATE: g 2.

Reference Drawing: A-09, 10 DATE:

Preservice Inspection PROGRAIIII PLAN AND SCHEDULE SHNPP - 5565 PAGE 6 OF 77 CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE No. IDENTIFICATION DESCRIPTION NUMBER Bl applicable) CATEGORY METHOD No.

CLOSURE HEAD BOLTING I-SH-THD-57 Vessel Flange Thread, Hole //57 80A5039 SHNPP- B-G-I UT N/A UT-5 B6.00 I-SH-THD-58 Vessel Flange Thread, Hole //58 80A 5039 SHNPP- B-G-I UT N/A UT-5 B6.00 NES 223/11/81

Syst . Reactor Pressure Vessel DATE: 2 Reference Drawing: A-09, 10 DATE:

Preser vice Inspection ROGRAM PLAN AND SCHEDULE PAGE 6 OF 77 CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE No. IDENTIFICATION DESCRIPTION NUMBER (II applicable) ~ CATEGORY METHOD No., REMARKS CLOSURE HEAD BOLTING I-SH-WSH-01 Closure Head Washer /IOI 80 A5003 N/A B-G-I VT-I N/A B6.50 I-SH-WSH-02 Closure Head Washer //02 80A5003 N/A B-G-I VT-I N/A B6.50 I-SH-WSH-03 Closure Head Washer //03 80A5003 N/A B-G-l VT-I N/A B6.50 I-SH-WSH-00 Closure Head Washer $300 80 A5003 N/A B-G-I VT-I N/A B6.50 I-SH-WSH-05 Closure Head Washer //05 80 A5003 N/A B-G-I VT-I N/A B6.50 I-SH-WSH-06 Closure Head Washer //06 80A5003 N/A B-G-I VT-I N/A B6.50 I-SH-WSH-07 Closure Head Washer //07 80A50IT3 N/A B-G-I VT-I N/A B6.50 I-SH-WSH-08 Closure Head Washer //08 80A5003 N/A B-G-I VT-I N/A B6.50 NES 223/11/81

Sys Reactor Pressure Vessel DATE: 2.

Reference Drawing: A-09, 10 DATE:

Preser vice Inspection PROGRAM PLAN SHNPP - AND SCHEDULE 5565 ttett'~~ PAGE 7 OF 77 ITEM NO.

COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK (II epplicebIe)

'ODE CODE CATEGORY EXAM METHOD ZONE No. REMARKS CLOSURE HEAD BOLTING I-SH-WSH-09 Closure Head Washer //09 80A5003 N/A B-G-I VT-I N/A B6.50 I-SH-WSH-10 Closure Head Washer //10 80A 5003 N/A B-G-I VT-I N/A B6.50 I-SH-WSH-11 Closure Head Washer //I I 80 A5003 N/A B-G-I VT-I N/A B6.50 I-SH-WSH-12 Closure Head Washer //12 80A5003 N/A B-G-I VT-I N/A B6.50 I-SH-WSH-I3 Closure Head Washer //13 80A5003 N/A B-G-I VT-I N/A B6.50 I-SH-WSH-10 Closure Head Washer //IO 80A 5003 N/A B-G-I = VT-I N/A B6.50 I-SH-WSH-15 Closure Head Washer //15 80A5003 N/A B-G-I VT-I N/A B6.50 I-SH-WSH-16 Closure Head Washer //I6 80A5003 N/A B-G-I VT-I N/A B6.50 NES 223/I]/Sl

Sys . Reactor Pressure Vessel BY: gghCr DATE: 82.

Reference Drawing: A-09, 10 Preservice Inspection PROGRAM PLAN AND SCHEDULE SHNPP - 5565 REV: o PAGE 7 OF 77 CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE No. IDENTIFICATION DESCRIPTION NUMBER (II eppliceble) CATEGORY METHOD No. REMARKS CLOSURE HEAD BOLTING I-SH-WSH-17 Closure Head Washer /I I 7 80A5003 N/A B-G-I VT-I N/

B6.50 I-SH-WSH-18 Closure Head Washer II18 80A5003 N/A B-G-l VT-I B6.50 I-SH-WSH-19 Closure Head Washer I/19 80A5003 N/A B-G-I VT-I B6.50 I-SH-WSH-20 Closure Head Washer II20 80A5003 N/A B-G-I VT-I N/

B6.50 I-SH-WSH-21 Closure Head Washer /I21 80 A5003 N/A B-G-I VT-I N/

B6.50 I-SH-WSH-22 Closure Head Washer /I22 80 A5003 N/A B-G-I VT-I N/

B6.50 I-SH-WSH-23 Closure Head Washer II23 80A5003 N/A B-G-I VT-I N/

B6.50 I-SH-WSH-20 Closure Head Washer II20 80A5003 N/A B-G-I VT-I N/

B6.50 NES 223/11/81

System: Reactor Pressure Vessel I

Reference Drawing: A-09, 10 Preservice Inspection PROGRAM PLAN AND SCHEDULE SHNPF - 5565 ~~y'~c~'~7OF 77 CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE No. IDENTIFICATION DESCRIPTION NUMBER (II eppllcabfe) CATEGORY METHOD No.

CLOSURE HEAD BOLTING I-SH-WSH-25 Closure Head Washer /I25 80A5003 N/A B-G-I VT-I N/

B6.50 I-SH-WSH-26 Closure Head Washer //26 80A 5003 N/A B-G-I VT-I N/

B6.50 I-SH-WSH-27 Closure Head Washer I/27 80 A5003 N/A B-G-I VT-I N/

B6.50 I-SH-WSH-28 Closure Head Washer //28 80A5003 N/A .B-G-I VT-I N/

B6.50 I-SH-WSH-29 Closure Head Washer /I29 . 80A5003 N/A B-G-I VT-I N/

B6.50 I-SH-WSH-30 Closure Head Washer /I30 80A5003 N/A B-G-I VT-I N/

B6.50 I-SH-WSH-31 Closure Head Washer 1331 80A5003 N/A B-G-I VT-I N/

B6.50 I-SH-WSH-32 Closure Head Washer /I32 80A5003 N/A B-G-I VT-I N/

B6.50 NES 223/1I/81

System: 'eactor Pressure Vessel DATE: 2 Reference Drawing: A-09, 10 DATE:

Preser vice Inspection PROGRAM PLAN AND SCHEDULE PAGE 7 OF 77 SHNPP - 5565 CALIBRATION COOE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE NO. IOENTIPICATION DESCRIPTION NUMBER (II applicable) CATEOORY METHOO NO.

CLOSVRE HEAD BOLTING I-SH-WSH-33 Closure Head Washer I/33 80A5003 N/A B-G-I VT-I B6.50 I-SH-WSH-30 Closure Head Washer I/30 80A50ff3 N/A B-G-l VT-I N/

B6.50 I-SH-WSH-35 Closure Head Washer I/35 80A5003 N/A B-G-I VT-I N/

B6.50 I-SH-WSH-36 Closure Head Washer $336 80A5003 N/A B-G-I VT-I N/

B6.50 I-SH-WSH-37 Closure Head Washer I/37 80A5003 N/A B-G-I VT-I N/

B6.50 I-SH-WSH-38 Closure Head Washer I/38 80A5003 N/A B-G-I VT-I B6.50 I-SH-WSH-39 Closure Head Washer I/39 80A5003 N/A B-G-I VT-I N/

B6.50 I-SH-WSH-00 Closure Head Washer 5100 80A5003 N/A B-G-1 N/

B6.50 N ES 223/I I/8l

Sy Reactor Pressure Vessel DATE:

Refe nce Drawing: A-09, 10- DATE:

Preservice Inspection REV: o PAGE 7 OF 77 PROGR~grgLA554blD SCHEDULE CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE No. IDENTIPICATION DESCAIPTION NUMBER DI applicebIe) CATEGORY METHOD No REMARKS CLOSURE HEAD BOLTING I-SH-WSH-41 Closure Head Washer I/41 80A5043 N/A B-G-I VT-I N/A B6 50 I-SH-WSH-42 Closure Head Washer 842 80A5043 N/A B-G-l VT-I N/A B6.50 I-SH-WSH-43 Closure Head Washer fI43 SOA5043 N/A B-G-I VT-I N/A B6.50 I-SH-WSH-44 Closure Head Washer II44 SOA5'043 N/A B-G-I N/A B6.50 I-SH-WSH-45 Closure Head Washer II45 SOA 5043 N/A B-G-I VT-I N/A B6.50 I-SH-WSH-46 Closure Head Washer II46 80A5043 N/A B-G-I VT-I N/A B6.50 I-SH-WSH-47 Closure Head Washer II47 80A5043 N/A B-G-I VT-I N/A B6.50 I-SH-WSH-48 Closure Head Washer I/48 SOA5043 N/A B-G-I VT-I N/A B6.50 N ES 223/11/81

Sy  : Reactor Pressure Vessel Reference Drawing: A-09, 10 PROGRAM PLAN AND SCHEDULE BY:

APP:

Rpy',~

~ DATE:

DATE:

ca Preservice Inspection SHNPP - 5565 pekoe 7 pp 77 CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE No. IDENTIRCATION DESCRIPTION NUMBER (II appIiceble) CATEGORY METHOD NO. REMARKS CLOSURE HEAD BOLTING I-SH-WSH-09 Closure Head Washer P/09 SOA5003 N/A B-G-I VT-I N/

B6.50 I-SH-WSH-50 Closure Head Washer 7/50 SOA5003 N/A B-G-I VT-I N/

B6.50 I-SH-WSH-51 Closure Head Washer $J5I 80A5003 N/A B-G-I VT-I N/

I-SH-WSH-52 Closure Head Washer $/52 80A5003 N/A B'-G-I VT-I N/

B I-SH-WSH-53 Closure Head Washer //53 80A5003 N/A B-G-I VT-I N/

I-SH-WSH-50 Closure Head Washer //50 SOA5003 N/A B-G-I VT-I N/

I-SH-WSH-55 Closure Head Washer 7/55 SOA5003 N/A B-G-.I VT-I N/

I-SH-WSH-56 Closure Head Washer f/56 SOA5003 N/A B-G-I VT-I N/

B6.50 NES 223/11/81

Sy: Reactor Pressure Vessel Reference Drawing: A-09, 10 BY:

APP:

IEIDIs'ATE! b $ 2.

(

DATE: 6 Preservice Inspection PROGRAM PLAN AND SCHEDULE apy, pp,ca pp SHNPP - 5565 7 77 CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE No. IDENTIFICATION DESCRIPTION NUMBER (II applicable) CATEGORY METHOD No.. REMARKS CLOSURE HEAD BOLTING I-SH-WSH-57 Closure Head Washer //57 80A 5003 N/A B-G-I VT-I N/

B6.50 I-SH-WSH-58 Closure Head Washer 7358 80A5003 N/A B-G-I VT-I B

NES 223/11/81

Sy: Reactor Pressure Vessel BY: lZ~ DATE: g2.

Reference Drawing: A-03 Preser vice Inspection PROGRAM PLAN AND SCHEDIILE aay, SHNPP - 5565 APP:

'pgGa'7 DATE:

pp 77 CALIBRATION CODE ITEM COMPONENT COMPONENT PROCEDDRE BLOCK CODE EXAM ZONE No. IDENTIFICATION DESCRIPTION NDMBER (II applicable) CATEGORY METHOD No. REMARKS VESSEL INTERIOR 1-SH-CS-01 Lower Core Support Pad Q 0 80A 5003 N/A B-N-3 VT-3 N/

B13.3 1-SH-CS-02 Lower Core Support Pad Q 90 80A5003 N/A B-N-3 VT-3 N/

B 3 1-SH-CS-03 Lower Core Support Pad Q 180 80A5003 N/A B-N-3 VT-3 N/

1-SH-CS-00 Lower Core Support Pad Q 270 80A5003 N/A B-N-3 VT-3 N/

Vessel Interior 80A5003 N/A B-N-1 VT-3 N/

NES 223/11/81

0 0