NUCLEAR ENERGY SERVICES. INC.
DOCUMENT NO, MA>O3>
REV.
PAGE~1F 77 82052i0269 8205i8 PDR ADOCK 05000400 6
PDR REACTOR PRESSURE VESSEL PRESER VICE INSPECTION PROGRAM PL'AN SHEARON HARRIS NUCLEAR POWER PLANT UNIT 81 Prepared for Carolina Power and Light Company Project Application TITLE/DEPT.
IlOETROLLfll IlOI'7 YALID DNLY IF THi$ STAMP IS RED Prepared By APPROVALS SIGNATURE Dete DATE FORM er NES 204 2/80
E 41~
I C
REVISION LOG NUCLEAR ENERGY SERVICES, INC.
DOCUMENT NO.
PAGE 2
OF REV NO.
DATE PAGE NO.
DESCRIPTION APP RO VA L FORM NES 2062/80
H NUCLEAR ENERGY SERVICES, INC.
DOCUMENT NO.
80A503 PAGE~QF~
TABLEOF CONTENTS
~Pa e l.
Introduction 2.
Bases for Preservice Inspection Program 3.
Preservice Inspection Program Plan Description 3.1 Classification 3.2 Exemptions 3.3 Exceptions 3.0 Ultrasonic Testing Calibration Standards 3.5 Examination Procedure 3.6 Figures and Sketches 3.7 Quality Assurance 3.8
- Evaluation Criteria 3.9 Records and Reports 3.10 Personnel Qualifications Requirements 3.11 Pre-examination Requirements 0.
Program Plan R Schedule Weld Map Figures Schedule Sheets 6
6 7
8 8
8 8
8 10-19 20-77 FORM¹ NES 205 2/80
NUCLEAR ENERGY SERV(CES, INC.
DOCUMENT NO.
PAGE 80A5035 OF 77 1-INTRODUCTION This Program Plan has been prepared to fulfill the Preservice Inspection (PSI) requirements for the Reactor Pressure Vessel (RPV) of the Shearon Harris Nuclear Power Plant, Unit NI, owned by Carolina Power 4 Light Company (CPRL).
The scope of these examinations, procedures and acceptance criteria meet the requirements outlined in Section XI of the ASME Boiler and Pressure Vessel Code, hereafter referred to asSection XI "Rules for Inservice Inspection of Nuclear Power Plant components",
1980 Edition, up to and including the Winter 1981 Addenda.
- 2. BASES FOR PRESERVICE INSPECTION PROGRAM 10 CFR 50.55(a) establish the edition of Section XI applicable to the PSI of the Reactor Pressure Vessel based upon the construction permit which was issued on 3anuary 27, 1978.
However, it is the intention of Carolina Power 8 Light Company to comply with the requirements of Section XI, 1980 Edition with Addenda through Winter 1981.
This represents a voluntary upgrade from the applicable 1970 Edition, Summer 1975 Addenda.
It should be noted that at the time this Plan was prepared, the Winter 1981 Addenda had not been approved.
This edition of Section XI was selected in anticipation of its approval and to provide baseline data comparable to that which will be taken during Inservice Inspection.
CPdcL feels that this code upgrade will meet the intent of 10 CFR 50.55(a) and Section XI.
Compliance with Nuclear Regulatory Commission (NRC) Regulatory Guide 1.150, "Ultrasonic Testing of Reactor Vessel Welds during Preservice and Inservice Examinations" is given in the Shearon Harris Nuclear Power Plant FSAR.
- 3. PRESERVICE INSPECTION PROGRAM PLAN DESCRIPTION 3.1 CLASSIFICATION All components in this program plan are part of the reactor coolant pressure boundary as defined in 10 CFR 50 Section 50.2(v) and are, therefore, Class I.
3.2 EXEMPTIONS None of the welds or components of the RPV are exempted from examination by subparagraph IWB-1220 of Section XI 3.3 EXCEPTIONS Exceptions to Code required examinations may be authorized by the regulatory authority, as allowed by 10 CFR 50.55 a(a)(2), provided that design, fabrication, installation, testing and inspection performed in compliance with codes and Section XI requirements would result in hardship without a
compensating increase in the level of quality and safety, or provided that the proposed alternative examination will provide an acceptable level of quality and safety.
FORM 0 NES 205 2/80
8
'NUCLEAR ENERGY SERVICES. INC.
DOCUMENT NO.
PAGE OF Detailed descriptions and justifications for exceptions taken can be found in Table 3.3.
System Table 3.3 Exceptions Reactor Pressure Vessel Category B-A Quality Group A.
Component
Description:
Pressure retaining welds in the reactor pressure vessel h
Code Requirement Basis for Relief 4
Volumetric examination of 100% of the pressure retaining welds and required volumes.
S Specific regions of the welds and required volumes may not not be examined due to part geometries (e.g. core support lugs, flange ID taper, nozzle bores, bottom head instrumentation tubes),
laminar defects, and ultrasonic examination effects (e.g.
near field
- effects, cladding/parent metal interfaces).
Ultrasonic examination will be performed on as much of the welds and required volumes as practical (as defined by 10CFR 50.55a(a)(2)) details of the unexamined areas will be provided in the final examination report.
Alternate Testing None FORM 0 NES 205 2/80
\\ ~ Alt
~
~
I
'la +'
I e
NUCLEAR ENERGY SERVICES, INC.
DOCUMENT NO.
PAGE~OF~
3.0 ULTRASONIC TESTING CALIBRATIONSTANDARDS The UT examination calibration standard design and material selection is in accordance with subarticle T-030 of Article 0 of ASME Section V, 1980 Edition, up to and including the V/inter 1981 Addenda.
Table 3A lists all the UT calibration standards required to perform the ultrasonic examinations for the RPV at Shearon Harris NPP.
Table 3A Title Where Used Block Wall Thickness Material SHNPP-UT-1 SHNPP-UT-2 SHNPP-UT-3 SHNPP-UT-0 SHNPP-UT'-0 SHNPP-UT-5 SHNPP-UT-6 SHNPP-UT-7 SHNPP-STUD-6 RPV RPV RPV RP V Nozzles and inner radius Flange Flange Ligament Nozzle Safe End (Nozzle Side)
Outlet Nozzle Safe End (Pipe Side)
Studs 9 II 8ll 5ll N/A N/A I2ll 2.65" 7ll 6ll SA533 SA533 SA533 SA508 SA508 SA508 SA508 SA376 SA500 3.5 EXAMINATIONPROCEDURES Subarticle IV/A-1000 of Section XI requires the development and preparation of written examination procedures necessary for the conduct of the nondestructive examinations associated with PSI operations.
The written procedures for the performance of visual, surface, and volumetric examinations are referenced in Table 3.5.
Visual Testing (VT) examination is employed to provide a report of the general condition of the part, component or surface to be examined; including such conditions as scratches,
- wear, cracks, corrosion or erosion on the surfaces; misalignment or movement of the part or component; or any evidence of leaking.
The NES VT examination procedures are based on the requirements of Paragraph IV/A-2210 of Section XI.
Liquid Penetrant Testing (PT) examination is specified as the surface examination method to delineate or verify the presence of cracks or discontinuities open to the examination surface.
The NES PT Examination Procedure is based on the requirements of Paragraph IV/A-2222 of Section XI.
The Ultrasonic (pulse echo)
Testing (UT) examination is selected as the volumetric examination method to indicate the presence of subsurface discontinuities by examining the required volume of metal contained beneath the surface to be examined.
The NES UT examination procedures are based on Section XI and Article 0 of Section V.
FORM¹ NES 205 2/80
h h
NUCLEAR ENERGY SERVICES, INC.
80A5035 DOCUMENT NO.
PAGE OF Table 3.5 Reference NDE Procedures SOA5037 80A5038 80A5039 Automated UT Examination Procedure for Reactor Vessel Shell and Head Welds h
Automated UT Examination Procedure for Reactor Vessel Upper shell to Flange Weld from the Flange Mating Surface Ultrasonic Examination Procedure for Reactor Vessel Flange Ligaments SOA5000 Automated UT Examination Procedure for Reactor Vessel Nozzle to Shell Welds SOA500l SOA5002
SOA5003 SOA5000 SOA5006 SOA5007 Automated UT Examination Procedure for Reactor Vessel Nozzle Inner Radii 1
Automated UT Examination Procedure for Reactor Vessel Nozzle to Pipe Welds Visual Examination Procedure Liquid Penetrant Examination Procedure Ultrasonic Examinations General Requirements Ultrasonic Examination Procedure for Reactor Vessel Closure Head Welds SOA5008 Ultrasonic Examination Procedure for Bolts and Studs 3.6.
FIGURES AND SKETCHES The figures listed in Table 3.6 show the identification and location of areas of the Reactor Pressure Vessel requiring examinations.
Table 3.6 Reactor Pressure Vessel Sketches A-Ol Rev 0 A-02 Rev 0 A-03 Rev 0 General Arrangement Circumferential Weld Map Reactor Vessel Assembly Longitudinal Weld Map Reactor Vessel Assembly FORM ONES 205 2/80
,hh Y'
II NUCLEAR ENERGY SERVICES, INC.
DOCUMENT NO.
PAGE OF A-00 Rev 0 A-05 Rev 0 A-06 Rev 0 A-07 Rev 0 A-08 Rev 0 A-09 Rev 0 A-10 Rev 0 Bottom Head Weld Map Inlet and Outlet Nozzles Sectional View Nozzles Top Head partial Penetration Welds Bottom Head Partial Penetration Welds Top Head Bolting Bolting Details 3.7 QUALITYASSURANCE The NES Quality Assurance Program Plan (QAPP) Document P/80A5030, governs the design review and implementation of the Shearon Harris Nuclear Power Plants Preservice/Inservice Inspection Program Plan.
This document is in accordance with NES ISI-Quality Assurance Manual, document j/80A9021, which is in compliance with Appendix B of 10 CFR 50. The QAPP includes the detailed quality assurance requirements that are common to.all activities of the program including organization, management,
- liaison, examination implementations, control of inspection
- records, qualifications of personnel, materials and procedures, etc.
3.8 E VALUATIONCRITERIA Evaluation of "any indications detected during PSI shall be made in accordance with IWA-3000 of Section XI.
Indications detected may be evaluated by other nondestructive
- methods, where practical, to assist in the determination (size, shape, lo'cation, orientation) before final disposition is made.
3.9 RECORDS AND REPORTS A system of records of the Preservice Inspection,
- plans, schedules and calibration standards; the examination results and reports, the corrective action required and taken, will be developed and maintained at the site in accordance with Article IWA-6000 of Section XI..
3.10 PERSONNEL QUALIFICATIONREQUIREMENTS Personnel performing nondestructive examination operations shall be qualified with procedures prepared in accordance with SNT-TC-lA, 1980 Edition, for the applicable examination technique and methods as required by Article IWA-2300 of Section XI. All examinations shall be performed and the results evaluated by qualified nondestructive examination personnel.
For those nondestructive examination methods not covered by SNT-TC-IA documents, NES shall qualify personnel on the particular method involved.
The NES procedures for such qualification provide uniform programs of training, evaluation and certification of personnel.
3.11 PRE-EXAMINATIONREQUIREMENTS General provisions for accessibility have been defined by Article IWA-1500 of Section XI.
FORM MOINES 205 2180
NUCLEAR ENERGY SERVICES, INC.
80A5035 DOCUMENT NO.
9 77 PAGE OF All portions of RPV that require inspection in accordance with the requirements of Section XI are designed with adequate physical access to allow the required inspection except as noted in paragraph 3.3.
- 0. PROGRAM PLAN ANDSCHEDULE The specific PSI examination requirements are defined in the PSI Program Plan and its schedule tables.
Each weld or other examination area is designated by a unique identification number, and then described.
Also identified are applicable examination category, method, procedure number and any calibration standard number referenced for ultrasonic examination as described in Section 3 of the General Reference Text.
Examination items are first divided according to the figure that they appear on.
Multiple examination requirements of the same component are listed together in the schedule tables.
FORM ¹NES 205 2/80
~
"<<g f>>%
A
+
I'4
~
V
8 4
NUCLEAR ENERGY SERVICES, INC.
VENT PIPE DQClJMENT NQ SOA5035 PAGE
>O OF CONTROL ROD~
DRIVE STUDS-I~
TOP HEAD tFLANGE TOP HEAD INLET NOZZLE OUTLET NOZZLE VESSEL SUPPORT PAD RING NO.3 RING N0.2 RIENG NO. I LOWER CORE SUPPORT PAD
~
$+pgggggg~ Qg~
BOTTOM HEAD ASSEMBLY GENERAL ARRANGEMENT Eiev: g Fn.
FEO. A Of I.T~
0 m3/a/sZ
~A~ cl.l+
'SHEARON HARRIS N.P. R FORM =NES 205 2/80
4 II NUCLEAR ENERGY SERVICES, INC.
DOCUMENT NO 80A5035.-
PAGE
~~
OF I/
5 4
BASE METAL I-SH-RV-018 RING NO.Z
~
C
~
I-SH-RV-OOI I-SH-RV-002 l
I RING N0.2 I-SH-RV- 003 Ip 7
3 BASE METAL RING NO. I I-SH-RV-004 II BASE METAL FORM o NES 205 2/80 I-SH-RV-0I7 SYIltM HQ.
NVCISLOINESOT MNVICtO
"'CIRCUMFERENTIAL WELD MAP REACT. VESSEL ASShLY sev: Q s>o. m.A 02 er:~Q(pJ oava 3/3j
,~~ira <J8
'SHEARON HARRIS N.P,P.
mr ro scca
'L
NUCLEAR ENERGY SERVICES, INC.
DOCUMENT NO.
PAGE ~0F~P 0
25 45 l35 225 2I5
,3I5 360 I-SH-RV-OOI 5e/z DIA.
I-SH-V-
'-SH-RV-OOS 67 DIA.
I-SH-RV-007 I-SH-RV- 03 I-SH-RV-008 I-SH>>RV-009 I-SH-RV-004 I-H-RV-OIO LCNER CORE P SUPPORT PADS I-SH-CS-Ol I so I"SH-CS-02 I
180 I-SH-CS-03 270 I-SH-CS-04 SYSTEM TEO.
>>T<<LONGITUDINAL WELD MAP REACT. VESSEL ASS BLY FORM TTNES 205 2/80 EEEYE Q saba.
PEO. 4-03
~ET~
~TEE~/>
AlH
~ATE>>. 4 SHEARON HARRIS N.PP.
PEOT TO SCALE
NUCLEAR ENERGY SERVICES INC 0
345 I-SH-RV-OI I DOCUMENT NO 80A5035 PaGa
>3 PF P ANV W
45 I-SH-RV-OI2 I"SH-RV-OI6 285~
270 90 IOS I"SH-RV-OI3 I-SH"RV-OI5 225 I-SH-RV-OI4 le I65 I-SH-RV-OI2 I-SH-RV-OII I-SH-RV-OI6 Tl NA VIEN
~
MEPIDIONAL
'NELD
- I-
.RV"Ol BASE'ETAL 5YS'IKQ HO.
slav: Q TITLE WC%MCIWMTttSVCtI BOTTOM HEAD IIIELD IvlAP sIo. ~, A-O4 FORM-NES 205 2/80 ev:~Q~
oAra:~gqIIQZ, APt gggPJ)A+
SHEARON HAPRIS N.P. P.
NOT IO SCAEC
~
~ ~,
w
~
NUCLEAR ENERGY SERVICES, INC.
DOCUMENT NO.
PAGE ~OP I-SH-SE-Ol SAFE-END WELD (TYP. OF 6)
INLET I-SH-N-OI I-SH-N-Ol-IR I-SH-N-02-IR OUTLET NOZZLE I-SH-SP-0 335 Nl'i I-SH-SP-OI I-SH-SP-06 25 N6 V
/
I
///
I-SH-SE-06 OUTLET NOZZLE I-SH-N-06 6-IR I-SH-N-05-IR li~lLr,T NOZZLE I-SH-SP-05 27G 265 N2 I-SH "SE-02 I-SH-N-02 iI>>
I I
L 90 c5 N5 I-SH-SE-05 I-H-N" 5 I-SH-N-03 INL"T NOZZLE I-SH-N-04 OUTLET NOZZLE I-SH-SE-03 N3, P
2I5 I-SH-SP-03
-N.O -IR IBQ I"SH"SE-04 XQN4 o
I-SH-SP-04 I-SH-N-04-IR NOTE N-NOZZLE WELD SE-SAFE-END WELD SP-SUPPORT PAD WELD SEV:Q PPUCMM GPPGNGT GGNVPCGG INLET+OUTLET NOZZLES E~.~, A-05 FORM "-NES 205 2/80 ev:7 oava3/q P APP;
/ZJ7COATE:
SHEARON HARRIS N.P.P.
NOT TO SCALE
NUCLEAR ENERGY SERVICES, INC.
DOCUMENTNO. son o
PAGE
~ 5 OF PLAN VIEW PLAN VIEW 1NLET NOZZLE 5UPPORT PAD (TYP. OF 3 EA)
FOR WELD NOS SEE DWG. A-OS OUTLET NOZZLE
~INNER RADIUS (TYP. OF 3 EA.)
SAFE-END WELDS (TYP. OF 3 EA. )
SECTION YlEW SECTION VIEVI Fl'ALE WC!le CSCIW ygyyggi SECTIONAL VIEW NOZZLES slav: Q rn. m. 4-O6 FORM < NES 205 2/80
~7~
oasa3 5
~A~
'SHEARON HARRIS N.PR wlTTO~a
NUCLEAR ENERGY SERVICES, INC.
DOCUMENT NO.
PAGE
~6 OF 7~
VENT PIPE PENETRATION I-SH-VP 0
C.R.D.
PENETRATIONS (TYP. )
CRD PENETRATION.AND
'CROM HOUSIN6 NOS.(TYP) 270 "Q55 Q5A 55
.~5--O4I -! g IB
~2 OI'-
OA7 III OI5 O5 Oo 6
II I
O5 'E OIs mrs)
Q5 QEI Q9,QIQT~I9 Q5 y
OI.
O.
O5 Q I QIP-QE OII OE OEI g,
OI5 g.
y g
O I
OET
@9 6I QSI 90 IBO OUTSIDE VIEW-TOP HEAD NOTE ALL TOP AEAD PARTIAL PENETRATION WELD NOS.
ARE PRECEEDED SY I-SH-CRD" FOR COMP.
WELD IDENTIFICATION.
CRD HOUSING WELD IDENT. NOS I-SH-CRH-(TYP. OF 58)
C NTR ROD HOUSING FORM ONES 205 2/80 rival TOP HEAD PARTIAL PENETRATIONS
~~. ~~.A-P7 42 aava
~OAT@
SHEARON HARRIS N.P.P.
NUCLEAR ENERGY SERVICES, INC.
DOCUMENT NO so PAQE
>7 pp 77 0
MELD NUVBERS AND INSTRUMENT PENETRATIONS (TYP.)
I
'-Qzs
. 270 Os Os SO'i
...0 0 0 Ois.,~i.~.---eQs--
. "- Qs 04'
- giga--------y 9 -
's Qas Qm Oso y
Oo Os
@g g.......Oi (g----Oi7
- 6 ih
~
8 t
so IBO OUTSfDE VIEW-BOTTOM HEAD
~NT~
ALL BOTTOM HEAD PARTIAL PENETRATION WELD NOS., ARE PRECEEDED BY I-SH-IP-FOR COMP.
WELD IDENTIFICATION.
naia BOTTOM HEAD PARTIAL PENETRATIONS aev: Q rss. m. A OB,'T os':3 $'.
B2.
SHEARON HARRIS N.P. P.
FORM 0 NES 205 2/80
NUCLEAR ENERGY SERVICES, INC.
0 DOCUMENT NO 80A5035 PaGE ~OF g
~,Qs 066 0' QG 0$
9 (o
'Qe 5,
Os ps ps 06,0600 Pis O
Qio Q
016 90 Oas QGi IDENTIFICATION NOS.
FOR BOLTING OGo Qss oeoe Qs Q
is Qi
,o oe I80 PLAN VIEW OF TOP HEAD FLANGE STUD HOLE LOCATIONS TITLE ~
TOP HEAD BOLTING nEL Eio. A Og T W
~~3qgZ
'SHEARON HARRIS N.P.P, FORM 0 NES 205 2/80 Vt
~ <<~ ~
~
e
NUCLEAR ENERGY SERVICES, INC.
i I
DOCUMENT NO. 80>5035 PAGE~OP q +0 IIEP 3X Iel
+I IDIIII zO g)
D Ld U
DO
,Z L9 s I I
I II I I I
I I I I I I
'I I I
I I
I I
cD I
IG I
D I
I a
IA I
I I
I I
I I
I I
I g
I g
I I
I
-le o
+-Ie STUD DETAIL IDENT. NUMBERS I-SH-STUD-(TYP. OF 58)
"fmo
+
I hIco I
CYLINDRICALNUT IDENT. NUMBERS I-SH-NUT-(TYP. OF 58)
SPHERICAL WASHER IDENT. NUMBERS I-SH-WSH-(TYP. OF 58)
O-IID
+ I 0 4 IDIIII TAPPING DETAIL OF SHELL FLANGE ASSY.
IDENT. NUMBERS I-SH-THD-(TYP. OF 58)
TITLE BOLTING DETAILS IImv:Q sIo. IIo. A IO oAva3 g(
Ia ~Q~
ISHEARON HARRIS N.P.P.
FORM -"NES 205 2/80
Sys:
Reactor Pressure Vessel Reference Drawing: A-02 Preservice Inspection PROGRAM PLAN AND SCHEDULE SHNPP - 5565 I
BY:
APP: ~(l REV:
o DATE:
2.
DATE:
PAGE 2 OF 77 ITEM No.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK (II applicable)
CODE CATEGORY CODE EXAM METHOD ZONE No.
REMARKS REACTOR VESSEL WELDS I-SH-RV-001 I-SH-RV-002 I-SH-RV-003 I-SH-RV-000 Flange to Vessel Ring //3 Circumferential Weld Circumferential Vessel Shell Weld Ring II3 to Ring //2 Circumferential Vessel Shell Weld Ring //2 to Ring //I Circumferential Vessel Shell Weld Ring //I to Bottom Head 80A5037 80A5038 80A5037 80A5037 80A5037 SHNPP-UT-I SHNPP-UT-0 SHNPP-UT-I SHNPP-UT-2 SHNPP-UT-2 SHNPP-UT-2 SHNPP-B-A B1.30 B-A Bl.I I B-A Bl.lI B/A Bl.lI UT UT UT UT N/
N/
I-SH-RV-017 Circumferential Bottom Head Shell Weld 80A5037 SHNPP-UT-3 B-A Bl.21 UT N/
I-SH-RV-018 Flange to Top Head Circumferential Shell Weld 80A5007 SHNPP-UT-3 B-A BI.OO UT N/
NES 223/11/81
e
System:, Reactor Pressure Vessel Reference Drawing: A-03 Preservice Inspection BY:
DATE! S'2 PROGRAM PLAN AND SCHEDULE SHNPP - 5565 REV:
o PAGE 21 OF 77 ITEM NO.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK
{IIapplicable)
CODE CODE EXAM CATEGORY METHOD ZONE No.
REACTOR VESSEL WELDS I-SH-RV-005 Longitudinal Vessel Shell Weld on Ring II/3 at 25 80A5037 SHNPP-UT-I B-A B1.12 UT=-
N/
I-SH-RV-006 Longitudinal Vessel Shell Weld on Ring I/3 at 2i5 80A5037 SHNPP-UT-I B-A Bl.12 UT N/
I-SH-RV-007 Longitudinal Vessel Shell Weld on Ring I/2 at 05 80A5037
-SHNPP-UT-2 B-A B1.12 UT I-SH-RV-008 Longitudinal Vessel Shell Weld on Ring I/2 at 225 80A5037 SHNPP-UT-2 B-A B1.12 UT I-SH-RV-009 Longitudinal Vessel Shell Weld on Ring I/I at 135 80A5037 SHNPP-UT-2 B-A Bl.12 UT N/
I-SH-RV-010 Longitudinal Vessel Shell Weld on Ring I/I at 315 80A5037 SHNPP-UT-2 B-A Bl.12 UT N/
RES 223/11/81
Syste T Reactor Pressure Vessel Reference Drawing: A-00 Preser vice Inspection BY:
RPC/
DATE: 5
?-
PROGRAM PLAN AND SCHEDULE REV.
0 PAGE 22 OF 77 ITEM NO.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK (II applicable)
CODE CODE EXAM ZONE CATEGORY METHOD NO.
REMARKS REACTOR VESSEL WELDS I-SH-RV-OlI Meridional Bottom Head Weld at 305 SOA5037 SHNPP-UT-3 B-A Bl.22 UT N/
I-SH-RV-012 Meridional Bottom Head Weld at 2S5 80A5037 SHNPP-UT-3 B-A Bl.22 UT N/
I-SH-RV-013 Meridional Bottom Head Weld at 225 SOA5037 SHNPP-UT-3 B-A B1.22 UT N/
I-SH-RV-010 Meridional Bottom Head Weld at 165 SOA5037 SHNPP-VT-3 B-A Bl.22 VT N/
I-SH-RV-015 Meridional Bottom Head Weld at 105 SOA5037 SHNPP-UT-3 B-A Bl.22 UT N/
I-SH-RV-016 Meridional Bottom Head Weld at 05 i
80A5037 SHNPP-UT-3 B-A B1.22 VT N/
MES 223/11/81
Sys
- "" Reactor Pressure Vessel Reference Drawing: A-05, 06 Preservice Inspection PROGRAM PLAN AND'SCHEDULE SHNPP - 5565 BY:
DATE: S 82.
DATE:
PAGE 2 OF 77 ITEM No.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK (Il eppIIcable)
CODE CATEGORY CODE EXAM METHOD ZONE No.
REMARKS VESSEL NOZZLE WELDS 1-SH-N-01 1-SH-N IR I-SH-SE-Ol I-SH-N-02 1-SH-N-02 IR Inlet Nozzle Nl to Vessel at 335 Inlet Nozzle Nl In'ner Radius Inlet Nozzle Nl Safe End Weld Outlet Nozzle N2 to Vessel at 265 Outlet Nozzle N2 Inner Radius 80A5037 80A5000 80A5001 80A5002 80A5000 80A5037 80A5000 80A5001 SHNPP-UT-1 SHNPP-UT-0 SHNPP-UT-T1 SHNPP-UT-6 SHNPP-UT-1 SHNPP-UT-0 SHNPP-i UT-0 B-D B3.90 B-D B3.10 B-F B5.10 B-D B3.90 B-D B3.10 UT UT UT PT UT PT
=
UT N
N/
N/
N/
I-SH-SE-02 1-SH-N-03 1-SH-N-03 IR Outlet Nozzle N2 Safe End Weld Inlet Nozzle N3 to Vessel at 215 Inlet Nozzle N3 Inner Radius 80A5002 80A5000 80A5037 80A5000 80A5001 SHNPP UT-6 SHNPP-UT-7 SHNPP-UT-1 SHNPP-UT-0 SHNPP-UT-0 B-F B5.10 B-D B3.90 B-D B3.10 UT.
N/
NES 223/11/81
Sys
- 'eactor Pressure Vessel Reference Drawing: A-05, 06 Preservice Inspection BY:
DATE: 5'Z APP:
(
DATE:
PROGRAM PLAN AND SCHEDULE Rpy'.
pgpp'2y pp 77 SHNPP - 5565 ITEM No.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK Bf appIicable)
CODE CODE EXAM CATEGORY METHOD 20NE No.
VESSEL NOZZLE WELDS I-SH-SE-03 Inlet Nozzle N3 Safe End Weld OA5002 80A5000 HNPP-UT-6 B5.10 U
PT I-SH-N-00 I-SH-N-00 IR I-SH-SE-00 I-SH-N-05 I-SH-N-05 IR I-SH-SE-05 Outlet Nozzle N0, to Vessel at 105 Outlet Nozzle N0 Inner Radius Outlet Nozzle N0 Safe End Weld Inlet Nozzle N5 to Vessel at 95 Inlet Nozzle N5 Inner Radius Inlet Nozzle N5 Safe End Weld SOA5000 80A5001 SOA5002 SOA5000 80A5037 80A5000 SOA5001 SOA5002 80A5000 UT-I SHNPP-UT-0 SHNPP-UT-0 SHNPP-UT-6 SHNPP-UT-7 SHNPP UT-I SHNPP-UT-0 SHNPP-UT-0 SHNPP-UT-6 B3.90 B-D B3.10 B-F B5.10 B-D.
B3.90 B-D B3.10 B-F B5.10 UT N/
UT N
UT N/
UT N
PT I-SH-N-06 NES 223/11/81 Outlet Nozzle N6 to Vessel at 25o SOA5000 UT-I SHNPP-SOA5037 SHNPP-B-D B3.90 UT N/
System:
Reactor Pressure Vessel Reference Drawing: A-05, 06 Preservice Inspection le BY:
DATE: 5'82 PROGRAM PLAN AND SCHEDULE ITEM No.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK (II spplicabie)
CODE CODE EXAM CATEGORY METHOD ZONE No.
REMARKS VESSEL NOZZLE WELDS I-SH-N-06 IR Outlet Nozzle N6 Inner Radius 80A5001 SHNPP-UT-0 B-D B3. I0 UT N/
I-SH-SE-06 Outlet Nozzle N6 Safe End Weld 80A5002 80A5000 SHNPP-UT-6 SHNPP-UT-8 B-F B5.10 UT N
-PT NES 223/11/81
Sy:
Reactor Pressure Vessel Reference Drawing: A-05, 06 Preser vice Inspection BY: ~
DATE: 5'2 APP:
DATE:
PROGRAM PL'AN AND SCHEDULE
- RQQ, PAGE 2 QF 77 SHNPP - 5565 ITEM No.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK (II applicable)
CODE CATEGORY CODE EXAM METHOD ZONE NO.
REMARKS ATTACHMENTWELDS I-SH-SP-01 Inlet Nozzle Nl to Support Pad 80A5000 N/A B-H Note I of category B-H I-SH-SP-02 Outlet Nozzle N2 to Support Pad 80A5000 N/A B-H N/
Note I of category B-H I-SH-SP-03 Inlet Nozzle N3 to Support Pad 80A5000 N/A B-H N/
Note I of category B-H I-SH-SP-00 Outlet Nozzle NO to Support Pad 80A5000 N/A B-H N/
Note I of category B-H I-SH-SP-05 Inlet Nozzle N5 to Support Pad 80A5000 N/A B-H N/
Note I of category B-H I-SH-SP-06 Outlet Nozzle N6 to Support Pad 80A500 0 N/A B-H Note I of category B-H NES 223/ll/81
S n: Reactor Pressure Vessel Reference Drawing: A-07 Preservice Inspection BY:
DATE: r z.
PROGRAM PLAN AND SCHEDULE REV-o PAGE 2 oF 77 ITEM No.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK
, (II appllcabIe)
CODE CODE EXAM ZONE CATEGORY METHOD No.
REMARKS CLOSURE HEAD PENETRATION WELD I-SH-CRD-Ol CRDM Penetration 80A5003 N/A B-E B0.12 VT-N/
I-SH-CRD-0 CRDM Penetration 80A5003 N/A B-E B0.12 I-SH-CRD-0 CRDM Penetration 80A5003 N/A B-E B0.12 VT-N/
I-SH-CRD-0 CRDM Penetration 80A5003 N/A B-E B0.12 VT-N/
I-SH-CRD-0 CRDM Penetration 80A5003 N/A B-E B0.12 VT-N/
I-SH-CRD-0 CRDM Penetration 80A5003 N/A B-E B0.12 VT-N/
I-SH-CRD-0 CRDM Penetration 80A5003 N/A B-E BO.I2 VT-N/
I-SH-CRD-0 CRDM Penetration 80A5003 N/A B-E B0.12 MES 223/11/81
II~
Sy
. Reactor Pressure Vessel Reference Drawing: A-07 Preservice Inspection "P
BY:
DATE: Ed'2, APP:
C DATE:
PROGRAQ@PQPPD SCHEDULE REY:
pAGE 28 oF 77 ITEM No.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK (II eppIicable)
CODE CATEGORY CODE EXAM METHOD ZONE No.
REMARKS CLOSURE HEAD'PENETRATION WELDS I-SH-CRD-09 CRDM Penetration 80A50 03 N/A B-E BO.I2 N/
I-SH-CRD-10 CRDM Penetration 80A5003 N/A B-E B0.12 VT-2 N/
I-SH-CRD-11 CRDM Penetration 80A5003 N/A B-E B0.12 VT-2 I-SH-CRD-12 CRDM Penetration 80A50 03 N/A B-E B0.12 VT-2 N/
I-SH-CRD-13 CRDM Penetration 80A5003 N/A B-E 80.12 VT-2 I-SH-CRD-10 CRDM Penetration 80A50 03 N/A B-E B0.12 VT-2 I-SH-CRD-15 CRDM Penetration 80A5003 N/A B-E B0.12 VT-2 N/
I-SH-CRD-16 CRDM Penetration 80A5003 N/A B-E BO.I2 NES 223/11/81
0
Syst T Reactor Pressure Vessel Reference Drawing: A-07 Preser vice Inspection BY: ~
DATE:~E82 PROGRAM PLAN AND SCHEDULE SHNPP - 5565 REV'-
o PAGE 2 OF 77 ITEM NO.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION
- BLOCK (II applicable)
CODE CODE EXAM CATEGORY METHOD CLOSURE HEAD PENETRATION %ELDS 1-SH-CRD-17 CRDM Penetration 80A5003 N/A B-E B0.12 N/
1-SH-CRD-18 CRDM Penetration 80A5003 N/A B-E B0.12 1-SH-CRD-19 CRDM Penetration 80A5003 N/A B-E BQ. 12 1-SH-CRD-20 CRDM Penetration 80A5003 N/A B-E B0.12 I-SH-CRD-21 CRDM Penetration 80A5003 N/A.
B-E BO.I2 VT-2 1-SH-CRD-22 CRDM Penetration 80A5003 N/A B-E B0.12 1-SH-CRD-23 CRDM Penetration 80A5003 N/A B-E B0.12 VT-2 N/
1-SH-CRD-20 NES 223/11/Sl CRDM Penetration 80A5003 N/A B-E B0.12 N/
System:
Reactor Pressure Vessel Reference Drawing: A-07 Preservice Inspection BY:
R~
DATE: F 82 PROGRAM PLAN AND SCHEDULE SHNPP - 5565 REV:
g PAGE 30 OF 77 ITEM COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK (II applicabIe)
CODE CATEGORY CODE EXAM METNOD ZONE CLOSURE HEAD PENETRATION WELDS I-SH-CRD-25 CRDM Penetration 80A5003 N/A B-E B0.12 VT-2 N/
I-SH-CRD-26 CRDM Penetration 80A5003 N/A B-E BO.I2 VT-2 N/
I-SH-CRD-27 CRDM Penetration 80A5003 N/A B-E BO.I2 VT-2 N/
I-SH-CRD-28 CRDM Penetration 80A5003 N/A B-E B0.12 VT-2 I-SH-CRD-29 CRDM Penetration 80A5003 N/A B-E BI1.12 VT-2 I-SH-CRD-3 CRDM Penetration 80A5003 N/A
'-E B0.12 VT-2 N/
I-SH-CRD-31 CRDM Penetration 80A5003 N/A B-E B0.12 VT-N/
I-SH-CRD-3 NES 223/11/81 CRDM Penetration 80A5003 N/A B-E B0.12 VT-N/
E 0
Sy T Reactor Pressure Vessel Reference Drawing: A-07 Preservice inspection 0
BY: ~
DATE: S 82-PROGRAM PLAN AND SCHEDULE REV'AGE 3 OF 77 SHNPP 5565 ITEM No.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK IIIepplicebte)
CODE CATEGORY CODE EXAM METHOD ZONE No.
CLOSURE HEAD PENETRATION WELDS I-SH-CRD-33 CRDM Penetration 8OA5003 N/A B-E B0.12 VT-2 N/A I-SH-CRD-30 CRDM Penetration SOA5003 N/A B-E B0.12 VT-2 N/
I-SH-CRD-35 CRDM Penetration 80A5003 N/A B-E B0.12 VT-2 N/
I-SH-CRD-36 CRDM Penetration 80A5003 N/A B-E 80.12 VT-2 I-SH-CRD-37 CRDM Penetration SOA5003 N/A B-E B0.12 VT-2 N/
I-SH-CRD-38 CRDM Penetration SOA5003 N/A B-E B0.12 VT-2 N/
I-SH-CRD-39 CRDM Penetration SOA5003 N/A B-E B0.12 VT-2 N/
I-SH-CRD-00 CRDM Penetration SOA5003 N/A B-E B0.12 VT-2 N/
NES 223/11/81
Sy: 'Reactor Pressure Vessel Reference Drawing: A-07 Preservice Inspection PROGRAM PLAN AND SCHEDULE SHNPP - 5565 REV:
DATE:~882.
/(
DATET~~~
PAGE 32 OF 77 ITEM No.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK IIIapplicable)
CODE CATEGORY CODE EXAM METHOD ZONE NO.
REMARKS CLOSURE HEAD PENETRATION WELDS I-SH-CRD-01 CRDM Penetration 80A5003 N/A B-E B0.12 VT-2 N/A I-SH-CRD-02 CRDM Penetration SOA5003 N/A B-E B0.12 VT-2 N/A I-SH-CRD-03 CRDM Penetration 80A5003 N/A B-E B0.12 VT-2 N/A I-SH-CRD-00 CRDM Penetration 80A5003 N/A B-E B0.12 VT-2 N/A I-SH-CRD-05 CRDM Penetration
- SOA5003, N/A B-E B0.12 VT-2 N/A I-SH-CRD-06 CRDM Penetration SOA5003 N/A B-E B0.12 VT-2 N/A I-SH-CRD-07 CRDM Penetration 80A5003 N/A B-E B0.12 VT-2 N/A I-SH-CRD-0S CRDM Penetration '0A5003 N/A B-E B0.12 VT-2 N/A NES 223/ll/81
Syste:
Reactor Pressure Vessel Reference Drawing: A-07 Preser vice Inspection BY: ~
DATE: E 82.
PROGRAM PLAN AND SCHEDULE SHNPP - 5565 REV:
o PAGE OF 77 ITEM No.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK BI applicable)
CODE CATEGORY CODE EXAM METHOD ZONE No.
REMARKS CLOSVRE HEAD PENETRATION WELDS I-SH-CRD-09 CRDM Penetration 80 A5003 N/A B-E B0.12 VT-2 N/
I-SH-CRD-50 CRDM Penetration 80A5003 N/A B-E B0.12 VT-2 N/
I-SH-CRD-51 CRDM Penetration 80A5003 N/A B-E B0.12 VT-2 N/
I-SH-CRD-52 CRDM Penetration 80A5003 N/A B-E B0.12
-VT-2 N/
I-SH-CRD-53 CRDM Penetration 80A5003 N/A B-E B0.12 VT-2 N/
I-SH-CRD-50 CRDM Penetration 80A5003 N/A B-E B0.12 VT-2 N/
I-SH-CRD-55 CRDM Penetration 80A5003 N/A B-E B0.12 VT-2 I-SH-CRD-56 CRDM Penetration 80A5003 N/A B-E B0.12 VT-2 N/
NES 223/11/81
System:
Reactor Pressure Vessel Reference Drawing: A-07 Preservice Inspection BY:
R~
DATE: F82.
PROGRAM PLAN AND SCHEDULE SHNPP - 5565 REV:
0 PAGE 30 OF 77 ITEM NO.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK IIIapplicable)
CODE CODE EXAM CATEGORY METHOD ZONE No.
REMARKS CLOSURE HEAD PENETRATION WELDS 1-SH-CRD-57 CRDM Penetration SOA50I13 N/A B-E B0.12 VT-2 N/
1-SH-CRD-58 CRDM Penetration SOA50TIt3 N/A B-E B0.12 VT-2 N/
I-SH-VP Vent Pipe Penetration SOA5003 N/A B-E B0.11 VT-2 NES 223/11/81
E
System.
eactor Pressure Vessel Reference Drawing: A-07 Preser vice Inspection PROGRAM PLAN AND SCHEDULE SHNPP - 5565 BY: ~
DATE: 5'2-ITEM No.
COMPONENT IDENTIFICATION COMPONENT
, DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK (II epplicabie)
CODE CODE EXAM ZONE CATEGORY METHOD No.
REMARKS CRDM HOUSING V/ELDS
-SH-CRDH-50 CRDM Housing /I54 80A5000 N/A B-0 B10.10 PT N/A
-SH-CRDH-58 CRDM Housing I/58 80A5000 N/A B-O B10.10 PT N/A
-SH-CRDH-06 CRDM Housing I/06 80A5040 N/A B-0 B10.10 PT N/A
-SH-CRDH-02 CRDM Housing k/02 80A5000 N/A B-0 B10.10 PT N/A
-SH-CRDH-07 CRDM Housing //07 80A5000 N/A B-O B10.10 PT N/A
-SH-CRDH-59 CRDM Housing I/59 80A5000 N/A B-0 B10.10 PT N/A
-SH-CRDH-55 CRDM Housing /155 80A5000 N/A B-O B10.10 PT N/A
-SH-CRDH-60 CRDM Housing I/60 80A5000 N/A B-0" B10.10 PT N/A NES 223/11/81
System.
eactor Pressure Vessel Reference Drawing: A-07 Preser vice Inspection
- PROGRAM PLAN AND SCHEDULE SHNPP - 5565 REV:
DATE: 5 82 DATE:
cf PAGE 36 OF 77 ITEM No.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK (II applicabfe)
CODE CODE EXAM CATEGORY METHOD ZONE No.
'RDM HOUSING WELDS I-SH-CRDH-08 CRDM Housing I/08 80A5000 N/A B-0 B10.10 PT N/A I-SH-CRDH-03 CRDM Housing I/03 80A5000 N/A B-0 B10.10 PT N/
I-SH-CRDH-09 CRDM Housing //09 80A5040 N/A B-0 B10.10 PT N/
I-SH-CRDH-61 CRDM Housing I/61 80A5000 N/A B-0 B10.10 PT N/
I-SH-CRDH-56 CRDM Housing II56 80A5000 N/A B-0 B10.10 PT N/
I-SH-CRDH-62 CRDM Housing I/62 80A5000 N/A B-0 B10.10 PT N/
I-SH-CRDH-50 CRDM Housing II50 80A5000 N/A B-0 BI0.10 PT N/
I-SH-CRDH-00 CRDM Housing 840 80A5000 N/A B-Q B10.10 PT N/
NES 223/ll/81
Syste eactor Pressure Vessel Reference Drawing: A-07 Preservice Inspection BY:
R~
DATE: 6 g2.
APP:
DATE:
PROGRAM PLAN AND SCHEDULE REV:
o PAGE 3 OF 77 SHNPP - 5565 ITEM No.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDIJRE NUMBER CALIBRATION BLOCK (II applicable)
CODE CATEGORY CODE EXAM METHOD ZONE No.
REMARKS CRDM HOUSING WELDS I-SH-CRDH-51 CRDM Housing II51 80A5000 N/A B-O B10.10 PT N/
I-SH-CRDH-63 CRDM Housing I/63 80A5000 N/A B-0 B10.10 PT I-SH-CRDH-57 CRDM Housing //57 8OA5000 N/A B-0 BI0.10 PT N/
I-SH-CRDH-60 CRDM Housing /160 SOA5000 N/A B-0 B10.10 PT N/
I-SH-CRDH-52 CRDM Housing k/52 SOA5000 N/A B-O B10.10 PT I-SH-CRDH-05 CRDM Housing I/05 SOA5000 N/A B-0 BI0.10 PT I-SH-CRDH-53 CRDM Housing
$753 SOA5000 N/A B-0 B10.10 I-SH-CRDH-65 CRDM Housing II65 80A5000 N/A B-0 B10.10 PT N/
NES 223/11/81
System:
Reactor Pressure Vessel Reference Drawing: A-08 Preser vice Inspection BY: ~
DATE: 5 R
PROGRAM PLAN AND SCHEDULE
'@~ca'~~
SHNPP - 5565 REV:
o ITEM No.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK (II appIicable)
CODE CODE EXAM CATEGORY METHOD ZONE No.
REMARKS BOTTOM HEAD INSTRUMENT PENETRATION WELDS 1-SH-IP-01 Instrument Penetration
$/I 80A5003 N/A B-E B0.13 VT-2 I-SH-IP-02 Instrument Penetration //2 80A5003 N/A B-E B0.13 VT-2 I-SH-IP-03 Instrument Penetration
/$3 80A5003 N/A B-E B0.13 VT-2 N/
I-SH-IP-00 Instrument Penetration
//0 80A5003 N/A B-E B0.13 VT-2 I-SH-IP-05 Instrument Penetration //5 80A5003 N/A B-E B0.13 VT-2 N/
I-SH-IP-06 Instrument Penetration //6 80A5003 N/A B-E B0.13 VT-2 N/
I-SH-IP-07 Instrument Penetration
//7 80A5003 N/A B-E B0.13 VT-2 N/
I-SH-IP-08 Instrument Penetration kN 80A5003 N/A B-E B0.13 VT-2 N/
NES 223/ll/81
Syst
. Reactor Pressure Vessel Reference Drawing: A-08 Preservice Inspection PROGRAM PLAN AND SCHEDULE SHNPP - 5565 DATE: <82-DATE: 6 o
PAGE 3 OF 77 ITEM COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK OI applicable)
CODE CODE EXAM CATEGORY METHOD ZONE No.
REMARKS BOTTOM HEAD INSTRUMENT PENETRATION WELDS I-SH-IP-09 Instrument Penetration
/$9 80A5043 N/A B-E B4.13 VT-2 N/A I-SH-IP-10 Instrument Penetration //10 80A5043 N/A B-E B4.13 VT-2 N/A I-SH-IP-11 Instrument Penetration
//11 80A5043 N/A B-E B4.13 VT-2 N/A I-SH-IP-12 Instrument Penetration
/I12 80A5043 N/A B-E B4.13 VT-2 N/A I-SH-IP-13 Instrument Penetration //13 80A5043 N/A B-E B4.13 VT-2 N/A I-SH-IP-14 Instrument Penetration /I14 80A5043 N/A B-E B4.13 VT-2 N/A I-SH-IP-15 Instrument Penetration
$/15 80A5043 N/A B-E B4.13 VT-2 N/A I-SH-IP-16 Instrument Penetration /I16 80A5043 N/A B-E B4.13 VT-2 N/A NES 223/11/81
Syst
. Reactor Pressure Vessel Reference Drawing: A-08 Preservice Inspection PROGRAM PLAN AND SCHEDULE SHNPP, - 5565 BY:
APP:
REV:
DATE: F82 DATE:
o PAGE 0 OF 77 ITEM NO.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK IIIeppliceble)
CODE CATEGORY CODE EXAM METHOD ZONE No.
BOTTOM HEAD INSTRUMENT PENETRATION WELDS I-SH-IP-17 Instrument Penetration
//17 80A5003 N/A B-E BO.I3 VT-2 N/A I-SH-IP-18 Instrument Penetration
/II8 80A5003 N/A B-E B0.13 VT-2 N/A I-SH-IP-19 Instrument Penetration I/19 80A5003 N/A B-E B0.13 VT-2 N/A I-SH-IP-20 Instrument Penetration I/20 80A5003 N/A B-E B0.13 VT-2 N/A I-SH-IP-21 Instrument Penetration I/2l 80A5003 N/A B-E B0.13 VT-2 N/A I-SH-IP-22 Instrument Penetration I/22 80A5003 N/A B-E BT1.13 VT-2 N/A I-SH-IP-23 Instrument Penetration I/23 80A5003 N/A B-E B0.13 VT-2 'N/A I-SH-IP-20 Instrument Penetration II20 80A5003 N/A B-E B0.13 VT-2 N/A NES 223/II/81
System:
Reference Drawing: A-08 Preservice Inspection BY: ~
DATE: 8 82 PROGRAM PLAN AND SCHEDULE SHNPP - 5565 REV:
a PAGE 01 OF 77 ITEM COMPONENT IOENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK
{IIeppllcable)
CODE COO E EXAM CATEGORY METHOO ZONE No.
REMARKS BOTTOM HEAD INSTRUMENT PENETRATION WELDS 1-SH-IP-25 Instrument Penetration II25 80A5003 N/A.
B-E B0.13 VT-2 I-SH-IP-26 Instrument Penetration k/26 80A5003 N/A B-E B0.13 VT-2 N/
1-SH-IP-27 Instrument Penetration
/f27 80A5003 N/A B-E B0.13 VT-2 N/
1-SH-IP-28 Instrument Penetration f328 80A5003 N/A B-E B0.13 VT-2 N/
1-SH-IP-29 Instrument Penetration I/29 80A5003 N/A B-E B0.13 VT-2 N/
.1-SH-IP-30 Instrument Penetration
/I30 80A5003 N/A B-E B0.13 r
VT-2 N/
1-SH-IP-31 Instrument Penetration II31 80A5003 N/A B-E B0.13 VT-2 N/
1-SH-IP-32 Instrument Penetration
/$32 80A5003 N/A B-E B0.13 VT-2 N/
NES 223/I 1/81
r
Sy: Reactor Pressure Vessel Reference Drawing: A-08 Preservice Inspection PROGRAM PLAN AND SCHEDULE SHNPP - 5565 BY: V~
DATE: 5'dit2 APP:
(
DATE:
. z REV:
o PAGE 02 OF 77 ITEM No.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK (II appllcabla)
CODE CODE EXAM CATEGORY METHOD ZONE No.
REMARKS BOTTOM HEAD INSTRUMENT PENETRATION WELDS I-SH-IP-33 Instrument Penetration I/33 80A5003 N/A B-E B0.13 VT-I-SH-IP-30 Instrument Penetration I/30 80A5003 N/A B-E B0.13 VT-2 I-SH-IP-35 Instrument Penetration I/35 SOA50TI'3 N/A B-E B0.13 VT-2 N/
= I-SH-IP-36 Instrument Penetration I/36 8OA5003 N/A B-E B0.13 VT-2 I-SH-IP-37 Instrument Penetration II37 SOA5003 N/A B-E B0.13 VT-2 N/
I-SH-IP-38 Instrument Penetration /I38 80A5003 N/A B-E BO.I3 VT-2 I-SH-IP-39 Instrument Penetration
/$39 SOA5003 N/A B-E BO. 13 VT-2 I-SH-IP-00 Instrument Penetration I/00 SOA5003 N/A B-E BO.I3 VT-2 N/
NES 223/11/81
System:
Reactor Pressure Vessel Reference Drawing: A-08 Preser vice Inspection PROGRAM PLAN AND SCHEDULE SHNPP - 5565 BY: ~
DATE:
2.
ITEM No.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK (II eppIlceble)
CODE CODE EXAM CATEGORY METHOD ZONE No.
REMARKS BOTTOM HEAD INSTRUMENT PENETRATION WELDS 1-SH-IP-01 Instrument Penetration 1301 80A5003 N/A B-E VT-2 N/
B0.13 I-SH-IP-02 Instrument Penetration II02 80A5003 N/A B-E VT-2 N/
B0.13 1-SH-IP-03 Instrument Penetration
//03 80A5003 N/A B-E B0.13 VT-2 N/
I-SH-IP-00 Instrument Penetration 5300 80A5003 N/A B-E B0.13 VT-2 N/
1-SH-IP-05 Instrument Penetration I/05 80A5003 N/A VT-2 N/
1-SH-IP-06 Instrument Penetration II06 80A5003 N/A VT-2 N/
I-SH-IP-07 Instrument Penetration I/07 80A5003 N/A B-E B0.13 VT-2 N/
I-SH-IP-08 Instrument Penetration II08 80A5003 N/A B-E B0.13 VT-2 N/
NES 223/11/81
Sys
. Reactor Pressure Vessel Reference Drawing: A-OS Preser vice Inspection ITEM NO.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK (II applicable)
CODE CODE EXAM CATEGORY METHOD ZONE No.
REMARKS BOTTOM HEAD INSTRUMENT PENETRATION WELDS I-SH-IP-09 Instrument Penetration /N9 8OA5003 N/A B-E B0.13 VT-2 N/A I-SH-IP-50 Instrument Penetration
/750 SOA5003 N/A B-E BO.I3 VT-2 N/A NES 223/11/81
Syste T Reactor Pressure Vessel Reference Drawing: A-09, 10 Preservice Inspection-BY: '
DATE:
82.
PROGRAM PLAN AND SCHEDULE SHNPP - 5565 REV:
o PAGE 0 OF 77 ITEM No.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK (II eppIicable)
CODE CODE EXAM CATEGORY METHOD ZONE No.
REMARKS CLOSURE HEAD BOLTING I-SH-STUD-Ol Closure Stud I/OI I-SH-STUD-02 Closure Stud //02 I-SH-STUD-03 Closure Stud //03 I-SH-STUD-00 Closure Stud //00 I-SH-STUD-05 Closure Stud //05 I-SH-STUD-06 Closure Stud I/06 I-SH-STUD-07 Closure Stud II07 I-SH-STUD-08 Closure Stud I/08 NES 223/11/81 80A5008 80A5000 80A5008 80A5000 80A5008 80A5000 80A5008 80A5000 80A5008 80A5000 80A5008 80A5000 80A5008 80A5000 80A5008 80A5000 SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A B-G-I B6.30 B-G-I B6.30 B-G-I B6.30 B-G-I B6.30 B-G-I B6.30 B-G-I B6.30 B-G-I B6.30 B-G-I B6.30 UT PT UT PT UT PT UT PT UT PT UT PT UT PT UT PT N/A N/A N/A N/A N/A N/A N/A N/A
Sy
- Reactor Pressure Vessel Reference Drawing: A-09, 10 Preser vice Inspection BY: ~
DATE: 5 2.
PROGRAM PLAN AND SCHEDULE REV o
PAGE f16 OF 77 SHNPP - 5565 ITEM NO.
'OMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK (II epplicebfe)
CODE CATEGORY CODE EXAM METHOD ZONE No.
REMARKS CLOSURE HEAD BOLTING I-SH-STUD-0 Closure Stud //09 I-SH-STUD-I Closure Stud I/10 I-SH-STUD-I Closure Stud //11 I-SH-STUD-I Closure Stud II12 I-SH-STUD-I Closure Stud //13 I-SH-STUD-I Closure Stud //10 I-SH-STUD-I Closure Stud II15 I-SH-STUD-I Closure Stud I/16
- SOA5008 SOA50N SOA5000 SOA50ff8 SOA5000 SOA5008 SOA5000 SOA500S SOA5000 SOA5008 SOA5000 SOA5008 SOA5000 I
SOA5008 SOA5000 SHNPP-STUD-6 N/A N P-STUD-6 N/A SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A SHNPP-STUD4 N/A 8-G-I 86.30 8-G-I 86.30 B-G-I 86.30 B-G-I 86.30 8-G-I 86.30 8-G-I 86.30 8-G-I 86.30 8-G-I 86.30 UT PT UT PT UT PT UT
Sys m: Reactor Pressure Vessel Reference Drawing: A-09, 10 Preservice Inspection BY: ~
DATE: 5 82.
PROGRAM PLAN AND SCHEDULE SHNPP - 5565 REV:
o PAGE 07 OF'7 ITEM NO.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK BI e pplicable)
CODE CATEGORY CODE EXAM ZONE METHOD No.
REMARKS I-SH-STUD-I I-SH-STUD-I I-SH-STUD-I I-SH-STUD-2 I-SH-STUD-2 I-SH-STUD-2 I-SH-STUD-2 I-SH-STUD-2 NES 223/11/81 CLOSURE HEAD BOLTING Closure Stud /I17 Closure Stud I/18 Closure Stud //19 Closure Stud I/20 Closure Stud I/21 Closure Stud II22 Closure Stud II23 Closure Stud /I20 80A5008'0A5000 80A5008 80A5000 80A5008 80A5000 80A'5008 80A5000 80A5008 80A5000 80A5008 80A5000 80A5008 80A5000 80A5008 80A50N SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A B-G-I B6.30 B-G-I B6.30 B-G-I B6.30 B-G-I B6.30 B-G-I B6.30 B-G-B6.30 B-G-B6.30 B-G-B6.30 UT
.PT UT PT UT PT UT UT PT UT PT UT PT UT PT N/
Sys:
Reactor Pressure Vessel Reference Drawing: A-09, 10 Preservice Inspection BY:
PROGRAM PLAN AND SCHEDULE SHNPP - 5565 REV:
r DATE: S 2.
DATE:
2 o
PAGE 08 OF 77 ITEM NO.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK (II applicabfe)
CODE CATEGORY CODE EXAM METHOD ZONE No.
REMARKS I-SH-STUD-2 I-SH-STUD-2 I-SH-STUD-2 I-SH-STUD-2 I-SH-STUD-2 I-SH-STUD-3 I-SH-STUD-3 CLOSURE HEAD BOLTING Closure Stud //25 Closure Stud I/26..
Closure Stud /I27 Closure Stud II28 Closure Stud I/29 Closure Stud I/30 Closure Stud /I31 80A5008 SOA5000 SOA500S 80A5000 80A5008 SOA5000 SOA5008 80A5000 SOA5008 80A5000 SOA5008 80A5000 SOA5008 8OA5000 SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A B-G-I B6.30 B-G-I B6.30 B-G-I B6.30 B-G-I B6.30 B-G-I B6.30 B-G-I B6.30 B-G-I B6.30 UT PT UT PT UT PT UT PT UT PT UT PT UT N/
N/
N/
N/
N/
I-SH-STUD-3 NES 223/11/81 Closure Stud /132 80A5008 80A5000 SHNPP-STUD-6 N/A B-G-I B6.30 UT PT N/
System:
Reactor Pressure Vessel Reference Drawing: A-09, 10 Preservice Inspection BY: ~
DATE: S 82-PROGRAM PLAN AND SCHEDULE REV PAGE 4 OF 77 SHNPP - 5565 ITEM No.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK (II epplicebIe)
CODE CATEGORY CODE EXAM METHOD ZONE NO.
REMARKS CLOSURE HEAD BOLTING I-SH-STUD-3 Closure Stud II33 I-SH-STUD-3 Closure Stud II34 I-SH-STUD-3 Closure Stud II35 I-SH-STUD-3
. Closure Stud II36 I-SH-STUD-3 Closure Stud II37 I-SH-STUD-3 Closure Stud I/38 I-SH-STUD-3 Closure Stud II39 I-SH-STUD-4 Closure Stud I/40 NES 223/11/81 80A504S SOA5044 80A5048 80A5044 SOA5048 SOA5044 SOA5048 SOA5044 SOA5048 SOA5044 SOA5048
, 80A5044 SOA5048 80A5044 80A5048 SOA5044 SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A B-G-I B6.30 B-G-I B6.30 B-G-I B6.30 B-G-l B6.30 B-G-I B6.30 B-G-I B6.30 B-G-l B6.30 B-G-I B6.30 UT PT UT PT UT PT UT PT UT PT UT PT UT PT UT PT N/
N/
N/
N/
N/
Sys
- Reactor Pressure Vessel Reference Drawing: A-09, 10 Preservice Inspection BY:
PROGRAM PLAN AND SCHEDULE REy'l SHNPP - 5565 DATE:
82.
DATE:
PAGE 50 OF 77 ITEM No.
COMPONENT IDENTIRCATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK (II eppIicable)
CODE CATEGORY CODE EXAM METHOD ZONE No.
REMARKS CLOSURE HEAD BOLTING I-SH-STUD-01 Closure Stud II41 I-SH-STUD-02 Closure Stud II42 I-SH-STUD-03 Closure Stud I/03 I-SH-STUD-00 Closure Stud II04 I-SH-STUD-05 Closure Stud 805 I-SH-STUD-06 Closure Stud /I06 I-SH-STUD-07
. Closure Stud
$307 I-SH-STUD-08 Closure Stud II48 80A500S SOA5000 SOA5008 80A5000 80A5008 80A5000 SOA5008 SOA5000 SOA5008 SOA5000 SOA5008 80A5000 SOA5008 80A5000 80A5008 SOA5000 SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A B-G-I B6.30 B-G-I B6.30 B-G-I B6.30 B-G-I B6.30 B-G-I B6.30 B-G-l B6.30 B-G-I B6.30 B-G-I B6.30 UT PT UT PT UT PT UT, PT UT PT UT PT UT PT UT PT N/
N/
N/
N/
N/
N/
NES 223/11/81
Sys m: Reactor Pressure Vessel Reference Drawing: A-09, 10 Preservice Inspection BY! ~
DATE: <
2.
PROGRAM PLAN AND SCHEDULE SHNPP - 5565 REV:
o PAGE 5 OF 77 ITEM No.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK (II applicable)
CODE CODE EXAM CATEGORY METHOD ZONE No.
REMARKS CLOSURE HEAD BOLTING I-SH-STUD-0 Closure Stud //09 I-SH-STUD-5 Closure Stud //50 80A5008 80A5000 80A5008 80A5000 SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A B-G-I B6.30 UT PT UT B-G-I B6.30,. PT N/
N/
I-SH-STUD-5 Closure Stud I/5I I-SH-STUD-5 Closure Stud //52 I-SH-STUD-5 Closure Stud II50 I-SH-STUD-5 Closure Stud /I55 I-SH-STUD-5 Closure Stud I/56 NES 223/11/81 I-SH-STUD-5 Closure Stud /I53 80A5008 80A5000 80A5008 80A5000 80A5008 80A5000 80A5008 80A5000 80A5008 80A5000 80A5008 80A5000'HNPP-STUD-6 N/A SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A B-G-I B6.30 B-G-I B6.30 B-G-I B6.30 B-G-I B6.30 B-G-I B6.30 B-G-I B6.30 UT PT UT PT.
N/
N/
Sy: Reactor Pressure Vessel Reference Drawing: A-09, 10 Preservice Inspection BY:
acne DATE:~dI2.
PROGRAM PLAN AND SCHEDULE SHNPP 5565 REV:
o PAGE 52 OF 77.-
ITEM No.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK (II applicable)
CODE CATEGORY CODE EXAM METHOD ZONE REMARKS CLOSURE HEAD BOLTING I-SH-STUD-5 Closure Stud $/57 I-SH-STUD-5 Closure Stud II58 80A5008 80A5000 80A5008 80A5000 SHNPP-STUD-6 N/A SHNPP-STUD-6 N/A B-G-l B6.30 B-G-l B6.30 UT PT UT PT N/
NES 223/11/81
Sys
- 'Reactor Pressure Vessel Reference Dravring: A-09, 10 Preservice Inspection PROGRAM PLAN AND SCHEDULE SHNPP - 5565 REV:
R.~
DATE: 6'-
DATE:
o PAGE 5 OF 77 ITEM No.
COMPONENT IDENTIFICATION ~
COMPONENT DESCRIPTION PROCEDURE NUMBER CAUBRATION BLOCK
{IIapplicable)
CODE CODE EXAM CATEGORY METNOD ZONE No.
REMARKS CLOSURE HEAD BOLTING I-SH-NUT-01 Closure Head Nut $301 SO A5000 N/A B-G-I B6.10 PT N/A I-SH-NUT-02 Closure Head Nut.I/02 80A5000 N/A B-G-I B6.10 PT N/A I-SH-NUT-03 Closure Head Nut I/03 SOA5000 N/A B-G-I B6.10 PT
- N/A I-SH-NUT-00 Closure Head Nut //00 SOA5000 N/A B-G-I B6.10 PT N/A
= I-SH-NUT-05 Closure Head Nut //05 80A5000 N/A B-G-I B6.10 PT N/A I-SH-NUT-06 Closure Head Nut //06 80 A5000 N/A B-G-I'6.10 PT N/A I-SH-NUT-07 Closure Head Nut //07 80 A5000 N/A B-G-I B6.10 PT N/
I-SH-NUT-OS Closure Head Nut //08 80A5000 N/A B-G-I B6.10 PT N/
NES 223/11/81
Sys
. Reactor Pressure Vessel Reference Drawing: A-09, 10 Preser vice Inspection BY:
PROGRAM PLAN AND SCHEDULE SHNPP 5565 REV:~
DATE: 5 82-DATE:
PAGE 5 OF 77 ITEM No.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK
{IIepplicabfe)
CODE CATEGORY CODE EXAM METHOD ZONE No.
REMARKS CLOSURE HEAD BOLTING I-SH-NUT-09 Closure Head Nut 809 SOA5000 N/A B-G-I B6.10 PT N/
I-SH-NUT-10 Closure Head Nut I/10 80A5000 N/A B-G-I B6.10 PT N/
I-SH-NUT-11 Closure Head Nut IIII 80A5000 N/A B-G-I B6.10 PT N/
I-SH-NUT-12 Closure Head Nut II12 SOA5000 N/A B-G-I B6.10 PT N/
I-SH-NUT-13 Closure Head Nut II'I3 80A5000 N/A B-G-l B6.10 PT I-SH-NUT-10 Closure Head Nut III0 SOA5000 N/A B-G-I B6.10 N/A I-SH-NUT-15 Closure Head Nut I/15 SOA5000 N/A B-G-l B6.10 PT N/A I-SH-NUT-16 Closure Head Nut I/I6 80A5000 B-G-I B6.10 PT NES 223/ll/81
S:
Reactor Pressure Vessel Reference Drawing: A-09, 10 Preser vice Inspection BY: ~ DATE:~BE APP:
Q DATE:
PROGRAIIIIglfIIINAPD BCHEDVLE BEy.
PAGE 5 QF 77 ITEM No.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDVRE NUMBER CALIBRATION BLOCK (II applfcable)
CODE CATEGORY CODE EXAM METHOD ZONE CLOSURE HEAD BOLTING I-SH-NUT-17 Closure Head Nut /II7 80A5000 N/A B-G-I B6.10 N/
I-SH-NUT-18 Closure Head Nut I/18 80A500 0 N/A B-G-I B6.10 PT N/
I-SH-NUT-19 Closure Head Nut III9 80A500 0 N/A B-G-I B6.10 PT N/
I-SH-NUT-20 Closure Head Nut /I20 80A50tf0 N/A B-G-I B6.10 PT N/
I-SH-NUT-21 Closure Head Nut II2I 80A5000 N/A B-G-I B6.10 PT I-SH-NUT-22 Closure Head Nut //22 80A5000 N/A B-G-I B6.10 PT N/
I-SH-NUT-23 Closure Head Nut /I23 80A5000 N/A B-G-I B6.10 PT I-SH-NUT-20 Closure Head Nut I/20 80A5000 N/A B-G-I B6.10 PT NES 223/11/81
Sys Reactor Pressure Vessel Reference Drawing: A-09, 10 Preservice InsPection BY:
RPCJ DATE:
g2.
APP:
[
DATE:
PROGRAM PLAN AND SCHEDULE REV:
o PAGE 5 OF 77 SHNPP - 5565 ITEM No.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK (II applicable)
CODE CATEGORY CODE EXAM METHOD ZONE No.
REMARKS CLOSURE HEAD BOLTING I-SH-NUT-25 Closure Head Nut /I25 80 A5000 N/A B-G-I B6.10 PT N/A I-SH-NUT-26 Closure Head Nut 1126 80A5000 N/A B-G-I B6.10 N/A I-SH-NUT-27 Closure Head Nut II27 80A5000 N/A B-G-I B6.10 PT N/A I-SH-NUT-28 Closure Head Nut I/28 80A5000 N/A B-G-I B6.10 PT N/A I-SH-NUT-29 Closure Head Nut II29 80A5000 N/A B-G-I B6.10 PT N/A I-SH-NUT-30 Closure Head Nut II30 80A5000 N/A B-G-I B6.10 PT N/A I-SH-NUT-31 Closure Head Nut II31 80A5000 N/A B-G-I B6.10 PT N/A I-SH-NUT-32 Closure Head Nut II32 80A5000 N/A B-G-I B6.10 PT N/A NES 223/11/81
Syste
. Reactor Pressure Vessel Reference Drawing: A-09, 10 Preservice Inspection BY:
R~
DATE:
82-PROGRAM PLAN AND SCHEDULE SHNPP - 5565 REV:
o ITEM No.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK (IIapplicable)
CODE CODE EXAM CATEGORY METHOD ZONE No.
REMARKS CLOSURE HEAD BOLTING I-SH-NUT-33 Closure Head Nut //33 SOA5044 N/A B-G-l B6.10 PT N/A I-SH-NUT-34 Closure Head Nut II34 SOA5044 N/A B-G-I B6.10 PT N/A I-SH-NUT-35 Closure Head Nut I/35 SOA5044 N/A B-G-l B6.10 PT N/A I-SH-NUT-36 Closure Head Nut //36 80A5044 N/A B-G-I B6.10 PT N/A I-SH-NUT-37 Closure Head Nut II37 I'0A5044 N/A B-G-I B6.10 PT N/A I-SH-NUT-38 Closure Head Nut I/38 80A5044 N/A B-G-I B6.10 PT N/A I-SH-NUT-39 A
Closure Head Nut 839 SOA5044 N/A B-G-I B6.10 PT N/A I-SH-NUT-40 Closure Head Nut I/40 80A5044 N/A B-G-I B6.10 PT N/A NES 223/11/81
Sys:
Reactor Pressure Vessel Reference Drawing: A-09, 10 Preser vice Inspection ITEM COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK (II e ppliceble)
CODE CODE EXAM CATEGORY METHOD ZONE No.
REMARKS CLOSURE HEAD BOLTING I-SH-NUT-01 Closure Head Nut //01 80A5000 N/A B-G-I B6.10 N/
I-SH-NUT-02 Closure Head Nut L/02 SOA5000 N/A B-G-I
- PT B6.10 N/
I-SH-NUT-03 Closure Head Nut //03 SOA5000 N/A B-G-I B6.10 PT I-SH-NUT-00 Closure Head Nut $340 80A5000 N/A B-G-l B6.10 PT I-SH-NUT-05 Closure Head Nut //05 80A5000 N/A B-G-I B6.10 PT I-SH-NUT-06 Closure Head Nut //46 80A5004 N/A B-G-I.
B6.10 PT N/
I-SH-NUT-07 Closure Head Nut $/07 SOA5000 N/A B-G-I B6.10 PT I-SH-NUT-0S Closure Head Nut //08 SOA5000 N/A B-G-I B6.10 PT N/
NES 223/11/81
Syst
- 'Reactor Pressure Vessel Reference Drawing: A-09, 10 Preservice Inspection PROGRAM PLAN AND SCHEDULE SHNPP - 5565 REV:
R~
DATE:
82.
t(
DATE:
cI PAGE 5 OF 77 ITEM No.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK (II eppIiceble)
CODE CATEGORY CODE EXAM METHOD ZONE No.
REMARKS CLOSURE HEAD BOLTING I-SH-NUT-09 Closure Head Nut /N9 80A5000 N/A B-G-I B6.10 PT I-SH-NUT-50 Closure Head Nut $550 80 A5000 N/A B-G-I B6.10 PT N/
I-SH-NUT-51 Closure Head Nut II5I 80A5000 N/A B-G-I B6.10 PT I-SH-NUT-52 Closure Head Nut I/52 80A5000 N/A B-G-I B6.10 PT I-SH-NUT-53 Closure Head Nut II53 80A5000 N/A B-G-I B6.10 PT N/
I-SH-NUT-50 Closure Head Nut /I50 80A5000 N/A B-G-I B6.10 PT N/
I-SH-NUT-55 Closure Head Nut /I55 80A5000 N/A B-G-I B6.10 PT I-SH-NUT-56 NES 223/11/81 Closure Head Nut II56 80A5000 N/A B-G-I B6.10 PT N/
T System:
Reactor Pressure Vessel Reference Drawing: A-09, 10 Preservice Inspection PROGRAM PLAN AND SCHEDULF SHNPP - 5565 BY: ~
DATE:
82 ITEM No.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK (II applicable)
CODE CATEGORY CODE EXAM METHOD ZONE No.
REMARKS CLOSURE HEAD BOLTING 1-SH-NUT-57 Closure Head Nut II57 80A5000 N/A B-G-l B6.10 PT N/
1-SH-NUT-58 Closure Head Nut II58 80A500 0 N/A B-G-1 B6.10 PT N/
NES 223/11/81
Sys
- Reactor Pressure Vessel Reference Drawing: A-09, 10 Preservice Inspection BY: ~
DATE:
82 PROGRAM PLAN AND SCHEDULE SHNPP - 5565 REV:
o PAGE 6 OF 77 ITEM No.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK (II appIiceble)
CODE CODE EXAM CATEGORY METHOD ZONE No.
REMARKS CLOSURE HEAD BOLTING I-SH-THD-01 Vessel Flange Thread, Hole I/OI 80A5039 SHNPP-UT-5 B-G-I B6.00 UT N/
I-SH-THD-02 Vessel Flange Thread, Hole I/02 80A5039 SHNPP-UT-5 B-G-I B6.00 UT I-SH-THD-03 Vessel Flange Thread, Hole 803 80A5039 SHNPP-UT-5 B-G-l B6.00 UT N/
I-SH-THD-00 Vessel Flange Thread, Hole I/00 80A5039 SHNPP-UT-5 B-G-I B6.00 UT N/
I-SH-THD-05 Vessel Flange Thread, Hole II05 80A5039 SHNPP-UT-5 B-G-I B6.00 UT I-SH-THD-06 Vessel Flange Thread, Hole I/06 80A5039 SHNPP-UT-5 B-G-I B6.00 UT N/
I-SH-THD-07 Vessel Flange Thread, Hole I/07 80A5039 SHNPP-UT-5 B-G-I B6.00 UT I-SH-THD-08 MES 223/ll/81 Vessel Flange Thread, Hole I/08 80A5039 SHNPP-UT-5 B-G-I B6.00 UT N/
Sys
. Reactor Pressure Vessel Reference Drawing: A-09, 10 Preservice Inspection PROGRAM PLAN AND SCHEDULE SHNPP - 5565 REVL~
DATE:~82.
DATE:~I~
PAGE 62 OF 77 ITEM No.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK
{IIepplIcable)
CODE CODE EXAM CATEGORY METHOD ZONE NO.
CLOSURE HEAD BOLTING I-SH-THD-09 Vessel Flange Thread, Hole //09 80A5039 SHNPP-UT-5 B-G-I B6.00 UT N/A I-SH-THD-10 Vessel Flange Thread, Hole IIIO 80A5039 SHNPP-UT-5 B-G-I B6.00 UT N/A I-SH-THD-11 Vessel Flange Thread, Hole /III 80A5039 SHNPP-UT-5 B-G-I B6.00 UT N/A I-SH-THD-12 Vessel Flange Thread, Hole /I12 80A5039 SHNPP-UT-5 B-G-I B6.00 UT N/A I-SH-THD-13 Vessel Flange Thread, Hole //13 80A5039 SHNPP-UT-5
-B-G-I B6.00 UT N/A I-SH-THD-10 Vessel Flange Thread, Hole //10 80A5039 SHNPP-UT-5 B-G-I B6.00 UT N/A I-SH-THD-15 Vessel Flange Thread, Hole /II5 80A5039 SHNPP-UT-5 B-G-I B6.00 UT N/A I-SH-THD-16 Vessel Flange Thread, Hole $716 80A5039 SHNPP-UT-5 B-G-I B6.00 UT N/A NES 223/11/81
Sys
. Reactor Pressure Vessel Reference Drawing: A-09, 10 Preservice Inspection PROGRAM PLAN AND SCHEDUl E
- Rpv, SHNPP - 5565 DATE:
I82.
DATE: 5 PAGE 6 OF 77 ITEM No.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK (II sppIicable)
CODE CATEGORY CODE EXAM METHOD ZONE No.
REMARKS CLOSURE HEAD BOLTING I-SH-THD-17 Vessel Flange Thread, Hole /I17 80A5039 SHNPP-UT-5 8-G-I 86.40 UT N/A I-SH-THD-18 Vessel Flange Thread, Hole II18 80A5039 SHNPP-UT-5 8-G-I 86.40
~
UT N/A I-SH-THD-19 Vessel Flange Thread, Hole /I19 80A5039 SHNPP-UT-5 8-G-I 86.40 UT N/A I-SH-THD-20 Vessel Flange Thread, Hole /I20 80A5039 SHNPP-UT-5 8-G-I 86.40 UT N/A I-SH-THD-21 Vessel Flange Thread, Hole II21 80A5039 SHNPP-UT-5 B-G-I 86.40 UT N/A I-SH-THD-22 Vessel Flange Thread, Hole I/22 80A5039 SHNPP-UT-5 8-G-I 86.40 UT N/A I-SH-THD-23 Vessel Flange Thread, Hole II23 80A5039 SHNPP-UT-5 B-G-I 86.40 UT N/A I-SH-THD-24 Vessel Flange Thread, Hole II24 80A5039 SHNPP-UT-5 8-G-I 86.40 UT N/A NES 223/11/81
Syst Reactor Pressure Vessel Reference Drawing: A-09, 10 Preser vice Inspection BY:
R~
DATE:
2 PROGRAM PLAN AND SCHEDULE REV:
o PAGE 60'F 77 SHNPP - 5565 ITEM No.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDINE NUMBER CALIBRATION BLOCK (II applicable)
CODE CATEGORY CODE EXAM METHOD ZONE No.
REMARKS CLOSURE HEAD BOLTING I-SH-THD-25 Vessel Flange Thread, Hole I/25 80A5039 SHNPP-UT-5 B-G-I B6.00 UT N/A I-SH-THD-26 Vessel Flange Thread, Hole I/26 80A5039 SHNPP-UT-5 B-G-I B6.00 UT N/A I-SH-THD-27 Vessel Flange Thread, Hole II27 80A5039 SHNPP-UT-5 B-G-I B6.00 UT N/A I-SH-THD-28 Vessel Flange Thread, Hole I/28 80A5039 SHNPP-UT-5 B-G-I B6.00 UT N/A I-SH-THD-29 Vessel Flange Thread, Hole 1I29 80A5039 SHNPP-.
UT-5 B-G-I B6.00 UT N/A I-SH-THD-30 Vessel Flange Thread, Hole I/30 80A5039 SHNPP-UT-5 B-G-l B6.00 UT N/A I-SH-THD-31 Vessel Flange Thread, Hole II3I 80A5039 SHNPP-UT-5 B-G-I B6.00 UT N/A I-SH-THD-32 Vessel Flange Thread, Hole II32 80A5039 SHNPP-UT-5 B-G-I B6.00 UT N/A NES 223/11/81
Sy
- Reactor Pressure Vessel Reference Drawing: A-09, 10 Preservice Inspection BY: ~
DATE: &
2.
PgaoggM Pl gg AMP SCHpouLE SHNPP - 5565 REV:
a PAGE 6 OF 77 ITEM No.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK BI applIcable)
CODE CODE EXAM ZONE CATEGORY METHOD No..
CLOSURE HEAD BOLTING I-SH-THD-33 Vessel Flange Thread, Hole //33 80A5039 SHNPP-UT-5 I
B-G-I B6.00 UT N/
I-SH-THD-30 Vessel Flange Thread, Hole f/30 80A5039 SHNPP-UT-5 B-G-I B6.00 UT N/
I-SH-THD-35 Vessel Flange Thread, Hole //35 80A5039 SHNPP-UT-5 B-G-I B6.00 UT N/
I-SH-THD-36 Vessel Flange Thread, Hole //36 80A5039 SHNPP-UT-5 B-G-I B6.00 UT N/
I-SH-THD-37 Vessel Flange Thread, Hole /$37 80A5039 SHNPP-UT-5 B-G-I B6.00 UT N/
I-SH-THD-38 Vessel Flange Thread, Hole //38 80A5039 SHNPP-UT-5 '-G-I 'T N/
B6.00 I-SH-THD-39 Vessel Flange Thread, Hole $339 80A5039 SHNPP-UT-5 B-G-I B6.00 UT N/
I-SH-THD-00 Vessel Flange Thread, Hole //00 80A5039 SHNPP-UT-5 B-G-I B6.00 UT N/
MES 223/11/81
Sys Reactor Pressure Vessel Reference Drawing: A-09, 10 Preservice Inspection BY:
R&c DATE:
82 PROGRAM PL'AN AND SCHEDULE SHNPP - 5565 REV:
o PAGE 66 OF 77 COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION
= BLOCK IIIeppliceble)
CODE CODE EXAM CATEGORY METHOD ZONE No.
REMARKS CLOSURE HEAD BOLTING I-SH-THD-01 Vessel Flange Thread, Hole I/01 SOA5039 SHNPP-UT-5 B-G-I 66.00 UT N/
I-SH-THD-02 Vessel Flange Thread, Hole //02 80A5039 SHNPP-UT-5 B-G-I B6.00 UT N/
I-SH-THD-03 Vessel Flange Thread, Hole //03 80A5039 SHNPP-UT-5 B-G-I B6.00 UT N/
I-SH-THD-00 Vessel Flange Thread, Hole /100 80A5039 SHNPP-UT-5 B-G-I B6.00 UT N/
I-SH-THD-05 Vessel Flange Thread, Hole II05 SOA5039 SHNPP-UT-5 B-G-I B6.00 UT N/
I-SH-THD-06 Vessel Flange Thread, Hole /106 8OA5039 SHNPP-UT-5 B-G-I B6.00 UT N/
I-SH-THD-07 Vessel Flange Thread, Hole /I07 SOA5039 SHNPP-UT-5 B-G-I B6.00 UT N/
I-SH-THD-08 NES 223/11/81 Vessel Flange Thread, Hole //08 SOA5039 SHNPP-UT-5 B-G-I B6.00 UT N/
Syst Reactor Pressure Vessel Reference Drawing: A-09, 10 Preser vice Inspection PROGRAM PLAN AND SCHEDULE SHNPP 5565 REV:
o DATE:
PAGE 6 OF 77 a
BYT PQnC DATE:
g2.
ITEM NO.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK (II applicable)
CODE CATEGORY CODE EXAM METHOD ZONE NO.
REMARKS CLOSURE HEAD BOLTING I-SH-THD-09 Vessel Flange Thread, Hole lI09 80A5039 SHNPP-UT-5 B-G-I B6.00 UT N/A I-SH-THD-50 Vessel Flange Thread, Hole I/50 80A5039 SHNPP-UT-5 B-G-I B6.00 UT N/
I-SH-THD-51 Vessel Flange Thread, Hole /I51 80A5039 SHNPP-UT-5 B-G-l B6.00 UT N/A I-SH-THD-52 Vessel Flange Thread, Hole /I52 80A5039 SHNPP-UT-5 B-G-I B6.00 UT N/A I-SH-THD-53 Vessel Flange Thread, Hole II53 80A5039 SHNPP-UT-5 B-G-I B6.00 UT N/A I-SH-THD-50 Vessel Flange Thread, Hole II50 80A5039 SHNPP-UT-'5 B-G-I B6.00 UT N/A I-SH-THD-55 Vessel Flange Thread, Hole 855 80A5039 SHNPP-UT-5 B-G-I B6.00 UT N/A I-SH-THD-56 Vessel Flange Thread, Hole //56 80A5039 SHNPP-UT-5 B-G-I B6.00 UT N/A NES 223/11/sl
Sys:
Reactor Pressure Vessel Reference Drawing: A-09, 10 Preservice Inspection PROGRAIIII PLAN AND SCHEDULE SHNPP - 5565 DATE:
g 2.
DATE:
PAGE 6 OF 77 ITEM No.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK Bl applicable)
CODE CODE EXAM CATEGORY METHOD ZONE No.
CLOSURE HEAD BOLTING I-SH-THD-57 Vessel Flange Thread, Hole //57 80A5039 SHNPP-UT-5 B-G-I B6.00 UT N/A I-SH-THD-58 Vessel Flange Thread, Hole //58 80A5039 SHNPP-UT-5 B-G-I B6.00 UT N/A NES 223/11/81
Syst
. Reactor Pressure Vessel Reference Drawing: A-09, 10 Preser vice Inspection ROGRAM PLAN AND SCHEDULE DATE:
2 DATE:
PAGE 6 OF 77 ITEM No.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK (II applicable)
~
CODE CODE EXAM CATEGORY METHOD ZONE No.,
REMARKS CLOSURE HEAD BOLTING I-SH-WSH-01 Closure Head Washer /IOI 80 A5003 N/A B-G-I B6.50 VT-I N/A I-SH-WSH-02 Closure Head Washer //02 80A5003 N/A B-G-I B6.50 VT-I N/A I-SH-WSH-03 Closure Head Washer //03 80A5003 N/A B-G-l B6.50 VT-I N/A I-SH-WSH-00 Closure Head Washer
$300 80 A5003 N/A B-G-I B6.50 VT-I N/A I-SH-WSH-05 Closure Head Washer //05 80 A5003 N/A B-G-I B6.50 VT-I N/A I-SH-WSH-06 Closure Head Washer //06 80A5003 N/A B-G-I B6.50 VT-I N/A I-SH-WSH-07 Closure Head Washer //07 80A50IT3 N/A B-G-I B6.50 VT-I N/A I-SH-WSH-08 Closure Head Washer //08 80A5003 N/A B-G-I B6.50 VT-I N/A NES 223/11/81
Sys Reactor Pressure Vessel Reference Drawing: A-09, 10 Preser vice Inspection PROGRAM PLAN AND SCHEDULE ttett'~~
SHNPP - 5565 DATE:
2.
DATE:
PAGE 7 OF 77 ITEM NO.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK (II epplicebIe) 'ODE CODE EXAM CATEGORY METHOD ZONE No.
REMARKS CLOSURE HEAD BOLTING I-SH-WSH-09 Closure Head Washer //09 80A5003 N/A B-G-I B6.50 VT-I N/A I-SH-WSH-10 Closure Head Washer //10 80A5003 N/A B-G-I B6.50 VT-I N/A I-SH-WSH-11 Closure Head Washer //II 80 A5003 N/A B-G-I B6.50 VT-I N/A I-SH-WSH-12 Closure Head Washer //12 80A5003 N/A B-G-I B6.50 VT-I N/A I-SH-WSH-I3 Closure Head Washer //13 80A5003 N/A B-G-I B6.50 VT-I N/A I-SH-WSH-10 Closure Head Washer //IO 80A5003 N/A B-G-I B6.50
= VT-I N/A I-SH-WSH-15 Closure Head Washer //15 80A5003 N/A B-G-I B6.50 VT-I N/A I-SH-WSH-16 Closure Head Washer //I6 80A5003 N/A B-G-I B6.50 VT-I N/A NES 223/I]/Sl
Sys
. Reactor Pressure Vessel Reference Drawing: A-09, 10 Preservice Inspection BY:
gghCr DATE:
82.
PROGRAM PLAN AND SCHEDULE SHNPP - 5565 REV:
o PAGE 7 OF 77 ITEM No.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK (II eppliceble)
CODE CATEGORY CODE EXAM METHOD ZONE No.
REMARKS CLOSURE HEAD BOLTING I-SH-WSH-17 Closure Head Washer /II7 80A5003 N/A B-G-I B6.50 VT-I N/
I-SH-WSH-18 Closure Head Washer II18 80A5003 N/A B-G-l B6.50 VT-I I-SH-WSH-19 Closure Head Washer I/19 80A5003 N/A B-G-I B6.50 VT-I I-SH-WSH-20 Closure Head Washer II20 80A5003 N/A B-G-I B6.50 VT-I N/
I-SH-WSH-21 Closure Head Washer /I21 80 A5003 N/A B-G-I B6.50 VT-I N/
I-SH-WSH-22 Closure Head Washer /I22 80 A5003 N/A B-G-I B6.50 VT-I N/
I-SH-WSH-23 Closure Head Washer II23 80A5003 N/A B-G-I B6.50 VT-I N/
I-SH-WSH-20 Closure Head Washer II20 80A5003 N/A B-G-I B6.50 VT-I N/
NES 223/11/81
System:
Reactor Pressure Vessel Reference Drawing: A-09, 10 Preservice Inspection I
PROGRAM PLAN AND SCHEDULE ~~y'~c~'~7OF 77 SHNPF - 5565 ITEM No.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK (II eppllcabfe)
CODE CATEGORY CODE EXAM ZONE METHOD No.
CLOSURE HEAD BOLTING I-SH-WSH-25 Closure Head Washer /I25 80A5003 N/A B-G-I B6.50 VT-I N/
I-SH-WSH-26 Closure Head Washer //26 80A5003 N/A B-G-I B6.50 VT-I N/
I-SH-WSH-27 Closure Head Washer I/27 80 A5003 N/A B-G-I B6.50 VT-I N/
I-SH-WSH-28 Closure Head Washer //28 80A5003 N/A
.B-G-I B6.50 VT-I N/
I-SH-WSH-29 Closure Head Washer /I29
. 80A5003 N/A B-G-I B6.50 VT-I N/
I-SH-WSH-30 Closure Head Washer /I30 80A5003 N/A B-G-I B6.50 VT-I N/
I-SH-WSH-31 Closure Head Washer 1331 80A5003 N/A B-G-I B6.50 VT-I N/
I-SH-WSH-32 Closure Head Washer /I32 80A5003 N/A B-G-I B6.50 VT-I N/
NES 223/1I/81
System: 'eactor Pressure Vessel Reference Drawing: A-09, 10 Preser vice Inspection PROGRAM PLAN AND SCHEDULE SHNPP - 5565 DATE:
2 DATE:
PAGE 7 OF 77 ITEM NO.
COMPONENT IOENTIPICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK (II applicable)
CODE CATEOORY COOE EXAM METHOO ZONE NO.
CLOSVRE HEAD BOLTING I-SH-WSH-33 Closure Head Washer I/33 80A5003 N/A B-G-I B6.50 VT-I I-SH-WSH-30 Closure Head Washer I/30 80A50ff3 N/A B-G-l B6.50 VT-I N/
I-SH-WSH-35 Closure Head Washer I/35 80A5003 N/A B-G-I B6.50 VT-I N/
I-SH-WSH-36 Closure Head Washer
$336 80A5003 N/A B-G-I B6.50 VT-I N/
I-SH-WSH-37 Closure Head Washer I/37 80A5003 N/A B-G-I B6.50 VT-I N/
I-SH-WSH-38 Closure Head Washer I/38 80A5003 N/A B-G-I B6.50 VT-I I-SH-WSH-39 Closure Head Washer I/39 80A5003 N/A B-G-I B6.50 VT-I N/
I-SH-WSH-00 NES 223/I I/8l Closure Head Washer 5100 80A5003 N/A B-G-1 B6.50 N/
Sy Reactor Pressure Vessel Refe nce Drawing: A-09, 10-Preservice Inspection PROGR~grgLA554blD SCHEDULE REV:
o DATE:
DATE:
PAGE 7 OF 77 ITEM No.
COMPONENT IDENTIPICATION COMPONENT DESCAIPTION PROCEDURE NUMBER CALIBRATION BLOCK DI applicebIe)
CODE CODE EXAM CATEGORY METHOD ZONE No REMARKS CLOSURE HEAD BOLTING I-SH-WSH-41 Closure Head Washer I/41 80A5043 N/A B-G-I B6 50 VT-I N/A I-SH-WSH-42 Closure Head Washer 842 80A5043 N/A B-G-l B6.50 VT-I N/A I-SH-WSH-43 Closure Head Washer fI43 SOA5043 N/A B-G-I B6.50 VT-I N/A I-SH-WSH-44 Closure Head Washer II44 SOA5'043 N/A B-G-I B6.50 N/A I-SH-WSH-45 Closure Head Washer II45 SOA5043 N/A B-G-I B6.50 VT-I N/A I-SH-WSH-46 Closure Head Washer II46 80A5043 N/A B-G-I B6.50 VT-I N/A I-SH-WSH-47 Closure Head Washer II47 80A5043 N/A B-G-I B6.50 VT-I N/A I-SH-WSH-48 Closure Head Washer I/48 SOA5043 N/A B-G-I B6.50 VT-I N/A NES 223/11/81
Sy
- Reactor Pressure Vessel Reference Drawing: A-09, 10 Preservice Inspection BY: ~
DATE:
ca APP:
DATE:
PROGRAM PLAN AND SCHEDULE Rpy',~
pekoe 7
pp 77 SHNPP - 5565 ITEM No.
COMPONENT IDENTIRCATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK (II appIiceble)
CODE CODE EXAM CATEGORY METHOD ZONE NO.
REMARKS CLOSURE HEAD BOLTING I-SH-WSH-09 Closure Head Washer P/09 SOA5003 N/A B-G-I B6.50 VT-I N/
I-SH-WSH-50 Closure Head Washer 7/50 SOA5003 N/A B-G-I B6.50 VT-I N/
I-SH-WSH-51 Closure Head Washer
$J5I 80A5003 N/A B-G-I VT-I N/
I-SH-WSH-52 Closure Head Washer
$/52 80A5003 N/A B'-G-I B
VT-I N/
I-SH-WSH-53 Closure Head Washer //53 80A5003 N/A B-G-I VT-I N/
I-SH-WSH-50 Closure Head Washer //50 SOA5003 N/A B-G-I VT-I N/
I-SH-WSH-55 Closure Head Washer 7/55 SOA5003 N/A B-G-.I VT-I N/
I-SH-WSH-56 NES 223/11/81 Closure Head Washer f/56 SOA5003 N/A B-G-I B6.50 VT-I N/
Sy: Reactor Pressure Vessel Reference Drawing: A-09, 10 Preservice Inspection BY:
IEIDIs'ATE! b $ 2.
PROGRAM PLAN AND SCHEDULE
- apy, pp,ca 7
pp 77 APP:
(
DATE: 6 SHNPP - 5565 ITEM No.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDURE NUMBER CALIBRATION BLOCK (II applicable)
CODE CATEGORY CODE EXAM METHOD ZONE No..
REMARKS CLOSURE HEAD BOLTING I-SH-WSH-57 Closure Head Washer //57 80A5003 N/A B-G-I B6.50 VT-I N/
I-SH-WSH-58 Closure Head Washer 7358 80A5003 N/A B-G-I B
VT-I NES 223/11/81
Sy: Reactor Pressure Vessel Reference Drawing: A-03 Preser vice Inspection BY:
lZ~
DATE:
g2.
PROGRAM PLAN AND SCHEDIILE aay,'pgGa'7 pp 77 APP:
DATE:
SHNPP - 5565 ITEM No.
COMPONENT IDENTIFICATION COMPONENT DESCRIPTION PROCEDDRE NDMBER CALIBRATION BLOCK (II applicable)
CODE CATEGORY CODE EXAM ZONE METHOD No.
REMARKS VESSEL INTERIOR 1-SH-CS-01 Lower Core Support Pad Q 0 80A5003 N/A B-N-3 B13.3 VT-3 N/
1-SH-CS-02 Lower Core Support Pad Q 90 80A5003 N/A B-N-3 B
VT-3 N/
3 1-SH-CS-03 Lower Core Support Pad Q 180 80A5003 N/A B-N-3 VT-3 N/
1-SH-CS-00 Lower Core Support Pad Q 270 80A5003 N/A B-N-3 VT-3 N/
Vessel Interior 80A5003 N/A B-N-1 VT-3 N/
NES 223/11/81