Informs of Decision to Install Freefield,Strong Motion Monitoring Instrumentation for Cooling Water Reservoir & Perform Studies.Meeting W/Nrc Upon Completion of Studies (Approx Jul 1982) Requested
ML18017B632
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 03/24/1982
From: Howe P
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8203300181
Download: ML18017B632 (4)


Text

REOULATOR+NPORMA'TION DISTRIBUTION '+TEN (RIDE) lt

'AGCESSIOfP N4R 8203300181

DUCNDA'JE! 82/03/24.

NOTARI'ZED:., NO FACIL"50 400 "Shear. on Harris nuclear Power 'Plant< -Un'$t 1< ICapa,lipa

'.50 401 "Shear on 'Har ris Nuclear Pawer Plant< AUnit 2'< 'Car olina

'AUTH BYNAME Al)THOR F F ILIATION HONEE'P ~ N ~

rGarolina tPower,.8Light 'Co ~

PE<<CIP+ NAME REC IP IENT AFFILIIA'TION DENTONEH ~ RE Office of Nuclear

<<Reactor Rendu'lstioni Director DOCKET P.

0500040) 05000401

SUBJECT:

Informs of dec(sion Tto 3nstal l fr eefiel distr orig 'motion mongitoring, instr umentation for cool ing water reser voir.8

~Per,form Tstudies.Meeting w/NRC upon completion of studies

'(approx Jul 1982) requested.

DISTRZBUTION iCODE:

BOO IS iCDPIES iRECEIVED:LTR,. I:ENCL g SIZE: -'--.-'L--'

,'TITLE: PSAR/FSAR 'AMDTS and Related Correspondence NOTES!

, RECIPIENT ID CODE/NAME A/D LIGENSNG LIC BR 03 LA INTERNALs ELD IE/DEP/EPDB u35 MPA NRR/DE/EQB 13 NRR/DE/HGEB 30 NRR/DE/MTEB 17 NRR/DF/SAB 24 NRR/DHFS/HFE840 NRR/DHFS/OL'8 '34 NRR/DSI/AEB '26 NRR/DS I/CP8 10 NRR/DSI/ETSB 12" NRR/DS I/PSB

$ 9 N

RS8 "23

~L OA EXTERNAL': ACRS 41 FEMA REP DIV >39 NRC PDR 0?.

NTIS SCOP IES LTTR "ENCL 1

1 1

1 u

2 1

1 1

1 1

1 1

1 1

1 1

1 1

16 16 1

i 1

1 RECIPIENT ID 'CODE/NAME L'I{: <
BC LI C I'T RA E M ~

01 06 IE/DEP/EZLB NRR/DE/CEB 11 NRR/DE/GP

'28 NRR/DE/MEB 18 NRR/DE/QAB 21 NRR/DE/SEB,

?'5 NRR/DHPS/UQB 32 NRR/9 HP S/<<P T<<R 829 NRP/DSI/$ SB

'27 NRR/DSI/CSB

-09 NRR/DSI/ICSB if NRR/DS I/RAB '22 NRR/DST/L'GB 33 RGN2 BNL'(AMDTS ONLY)

LPDR 03 NSIC 05

<<COPIES L'PTR ENC

,1 1

1 l3 1

1

  • 8i 1i 1

1 1

1 1

1'2 1

1

TOTAL NUMBER OF <<COPIES REQUIRED:

UTTR

-63

.ENCL

, ~

g 1i a

N

)san

~

+1

'tf,d

~

y 4

~

a e

I l

n r

P h

mes Carolina Power & Light Company MAR X4 1982 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D.C.

20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS.

1 AND 2 DOCKET NOS. 50-400 AND 50-401 INSTALLATION OF ACCELEROMETER AT SHEARON HARRIS SITE

Dear Mr. Denton:

Carolina Power

& Light Company (CP8L) has decided to install free-field, strong motion monitoring instrumentation at the Shearon Harris Nuclear Power Plant site.

This equipment will augment existing equipment and will be used in our on-going program to monitor the effects of filling the cooling water reservoir.

We will be ordering the instrumentation and performing preliminary site evaluation studies for locating the monitor(s) during the next few months.

CP&L believes that a meeting with NRC following completion of these studies (about July, 1982) and prior to actually commencing the monitoring pr ogram is necessary.

Our staff will schedule a meeting with NRC upon completion of the subject studies.

Yours very truly, P.

W. Howe Vice President Technical Services GSC/lr (n-1) cc:

Messrs.

R. E. Jackson J.

P. O'Reilly P. Sobel D.

G.

Ward p~j (l~

8203300i8i 820324 PDR ADDCK 05000400 PDR Street o P. O. Box 1551 o Raleigh, N. C. 27602

~,