Informs of Decision to Install Freefield,Strong Motion Monitoring Instrumentation for Cooling Water Reservoir & Perform Studies.Meeting W/Nrc Upon Completion of Studies (Approx Jul 1982) Requested
ML18017B632
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 03/24/1982
From: Howe P
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8203300181
Download: ML18017B632 (4)


Text

REOULATOR+NPORMA'TION DISTRIBUTION '+TEN (RIDE) lt

'AGCESSIOfP N4R 8203300181 DUCNDA'JE! 82/03/24. NOTARI'ZED:., NO DOCKET P.

FACIL"50 400 "Shear. on Harris nuclear Power 'Plant< -Un'$t 1< ICapa,lipa 0500040)

'.50 401 "Shear on 'Har BYNAME ris Nuclear Pawer Plant< AUnit 2'< 'Car olina 05000401

'AUTH F F ILI AT ION Al)THOR HONEE'P ~ N ~ rGarolina tPower,.8Light 'Co ~

PE<<CIP+ NAME REC IP IENT AFF ILIIA'TION DENTONEH ~ RE Office of Nuclear <<Reactor Rendu'lstioni Director

SUBJECT:

Informs of dec(sion Tto 3nstal l fr eefiel distr orig 'motion mongitoring, instr umentation for cool ing water reser voir.8

~Per,form Tstudies.Meeting w/NRC upon completion of studies

'(approx Jul 1982) requested.

DISTRZBUTION iCODE: BOO IS iCDPIES iRECEIVED:LTR,. I:ENCL

,'TITLE: PSAR/FSAR 'AMDTS and Related Correspondence g SIZE: -'--.-'L--'

NOTES!

, RECIPIENT SCOP IES RECIPIENT <<COPIES ID CODE/NAME LTTR "ENCL ID 'CODE/NAME L'PTR ENC A/D LIGENSNG 1 L'I{: <
BC ,1 LIC BR 03 LA 1 L I C I'T RA E M~ 01 1 INTERNALs ELD 1 06 1 IE/DEP/EPDB u35 1 IE/DEP/EZLB l3 MPA u NRR/DE/CEB 11 1 1 NRR/DE/EQB 13 NRR/DE/GP '28 *8 NRR/DE/HGEB 30 2 NRR/DE/MEB 18 i 1 NRR/DE/MTEB 17 1 NRR/DE/QAB 21 i NRR/DF/SAB 24 1 NRR/DE/SEB,  ?'5 NRR/DHFS/HFE840 1 NRR/DHPS/UQB 32 1 NRR/DHFS/OL'8 '34 1 NR R/9 HP S/<<P T<<R 829 1 NRR/DSI/AEB '26 1 NRP/DSI/$ SB '27 1 NRR/DS I/CP8 10 1 NRR/DSI/CSB -09 1 NRR/DSI/ETSB 12" NRR/DS I/PSB $9 1

1 1

1 NRR/DSI/ICSB NRR/DS I/RAB '22 if 1 N

~L RS8 "23 OA 1

1 1 NRR/DST/L'GB RGN2 33

'2 1

EXTERNAL': ACRS 41 16 16 BNL'(AMDTS ONLY) 1 FEMA REP DIV >39 1 i LPDR 03 NRC PDR 0?. 1 NSIC 05 1 NTIS 1

TOTAL NUMBER OF <<COPIES REQUIRED: UTTR -63 .ENCL

~ g 1i a

N

)san ~

+1 'tf,d ~

y 4 ~ a e

I l n r

P h

mes Carolina Power & Light Company MAR X4 1982 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D.C. 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS. 1 AND 2 DOCKET NOS. 50-400 AND 50-401 INSTALLATION OF ACCELEROMETER AT SHEARON HARRIS SITE

Dear Mr. Denton:

Carolina Power & Light Company (CP8L) has decided to install free-field, strong motion monitoring instrumentation at the Shearon Harris Nuclear Power Plant site. This equipment will augment existing equipment and will be used in our on-going program to monitor the effects of filling the cooling water reservoir. We will be ordering the instrumentation and performing preliminary site evaluation studies for locating the monitor(s) during the next few months. CP&L believes that a meeting with NRC following completion of these studies (about July, 1982) and prior to actually commencing the monitoring pr ogram is necessary. Our staff will schedule a meeting with NRC upon completion of the subject studies.

Yours very truly, P. W. Howe Vice President Technical Services GSC/lr (n-1) cc: Messrs. R. E. Jackson J. P. O'Reilly P. Sobel D. G. Ward p~j (l~

8203300i8i 820324 Street o P. O. Box 1551 o Raleigh, N. C. 27602 PDR ADDCK 05000400