Text
la
~ ~
gPP
4 'l9M,~Ii ~~(
'//
Carolina
Power
and Light Company
ATTN:
Hr. J.
A. Jones,
Senior Executive
Vice President
and Chief
~% e
Operating Officer
411 Fayetteville Street g'pj's~.cora
Gentlemen:
~7p
Subject:
Report
No.
0-400/81-1
and 50-401/81-16,
50-402/81-16
and 50-403/81-16
This refers to the routine safety inspection
conducted
by Hr.
G.
F. Haxwell of
this office on July 20,
1981 through August 20, 1981, of activities authorized
by
NRC Construction
Permit Nos.
CPPR-158,
CPPR-159,
CPPR-160
and
CPPR-161 for the
Shearon
Harris facility and.to
the discuslion of our findings held with
Hr.
R. H. Parsons,
Site Hanager, at the conclusion of the inspection.
Areas examined
during the inspection
and 'our findings are discussed, in the
enclosed
inspection report.
Within these
areas,
the inspection consisted
of
selective
examinations
of procedures
and representative
records,
interviews with
'ersonnel,
and observations
by the inspector.
Within the
scope of t is inspection,
no violations'r deviations
were
disclosed.
We have
examined actions
you
have
taken with regard to previously identified
enforcement
matters
and unresolved
items.
The status of these
items is di'scussed
in the enclosed
report.
I
In accordance
with 10 CFR 2.790 of the Commission's
regulations,
a copy of this
letter and
the enclosed
report will be placed
in the
NRC's Public, Document
Room.
If the report contains
any information that you believe to
be exempt
from dis-
closure
under
10 CFR 9.5(a)(4), it is necessary
that you:
(a) notify this office
by telephone within ten days
from the date of this letter of your intention to
file a request for withholding; and (b) submit within twenty-five days
from the
date of this letter
a written application to this office to withhold such infor-
mation.
If your receipt of this letter
has
been
delayed
such that less
than
seven
days
are availabl'e for your review, please notify this office promptly so
that
a
new due date
may
be established.
Consistent with section'.790(b)(1),
such application must
be accompanied
by an affidavit executed
by the
owner of the
information which identifies the document or part thereof sought to
be withheld,
and
a full statement
of the reasons
on the'basis
of which it is claimed that the,
information should
be withheld from publ-ic disclosure.
This section further
requires
the statement
to address
with specificity the considerations
listed in
The information sought to
be withheld shall
be incorporated
as far as possible into a separate
part of the affidavit. If we do not hear
from
you in this regard within the specified
periods
noted above, the'report will be
placed
in the Public Oocument
Room.
Wg)
f,
5
It
Si09240368
Bi0904
ADQCK 05000400
)
~ 9
PDR.~
h
l
4
l
gt
0
Carolina
Power
and Light
4
1981
Should you have any questions
concerning this letter, wewill be glad to discuss
them with you.
Sincerely,
Enclosures:
Inspection
Report Nos.
50-400,
50-401,
50-402 and 50-403/81-16
R.
C. Lewis, Director
Division of Resident
and
Reactor Project Inspection
cc w/encl:
R. Parsons,
Site Manager
bcc w/encl:
NRC 'Resident
Inspector
R.
W. Wright, RII
Document
Management
Branch
State of North Carolina
RII:RRPI
RII'RPI
RII'RPI
R 'PI
pl
li
%(l f w
4
g ~ ~
'i
1
b
Q
t
l~
Jt
, J
e
~g
~