Text
APPENDIX A NOTICE OF VIOLATION Carolina Power and Light Company Shearon Harris 1, 2, 3 8 4 Docket Nos. 50-400, 50-401, 50-402 and 50-403 License Nos. CPPR-158, CPPR-159 CPPR-160 EI CPPR-161 As a result of the inspection conducted on May 11-15,
- 1981, a'nd in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7, 1980), the following violation was identified.
10 CFR 50, Appendix B, Criterion II and the accepted QA program described in the PSAR Section 1.8'. 1 requires that the QA Program shall provide for indoctrination and training of personnel performing activities affecting quality as necessary to assure that suitable proficiency is achieved and maintained.
CP&L procedure CQA-1 Section',2 requires that personnel performing QA/QC activities be indoctrinated in these project information areas necessary for effective coordination and accomplishment of their assigned activities and responsibilities.
Contrary to the above, documentation examined revealed that two QA inspec-tors found certified in concrete placement were not maintaining their proficiency in that the latest revision to'Work Procedure WP-05, "Concrete Placement".
read by them was revision 16 whereas revision 18 was current.
Additionally, one inspector certified in concrete curing last read revision 4 to Work Procedure WP-17, "Concrete Curing" whereas revision 7 is currently in use.
'his is a Severity Level VI Violation (Supplement II.F).
Pursuant to the provisions of 10 CFR 2.201, you are hereby required to submit to.
this office within thirty days of the date of this Notice, a written statement or explanation in reply, including:
(1) admission or denial of the alleged viola-tion; (2) the reasons for the violation if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved.
Consideration may be given to extending your response time for good cause shown.
Under the authority of Section 182 of the Atomic Energy Act of
- 1954, as amended, this response shall be submitted under oath or affirmation.
(
8108040326 8l07243 PDR ADOCK 05000400 G