Advises That QC Insp Responsibilities Discussed in Util Have Changed.Site Mgt Section Responsible for Insp of Concrete Repairs.Engineering & Const Qa/Qc Section Will Inspect Class 1,2 & 3 Pressure Boundary Items
ML18017B414
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 06/26/1981
From: Mcduffie M
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8106290199
Download: ML18017B414 (4)


Text

0 A-01 05000402 05000403 RECIPIENT ID CODE/NAME L'IC.BR ¹3 BC LiICITRAr M ~

04 RECIPIENT ID COOK/NAME>

ACTION:

A/D LICENSNG LIC BR ¹3-LA L

LiTTR'N 1

1 LTTR ENCL, RKGULATO Y INFORMATION DISTRIBUTION.SYSTEM (RIDS)

ACCESSION NBR;8104290199 DOC ~ DATE: 81/06/26,NOTA

-ED NO DOC FACIL:50-400 Shearon Harris Nuclear Power; Plantr'Unit ii Carolina 50 401 She'aron Harris Nuclear Power Plenty Unit 2'i Carolina 50-402 Shearon Harris Nuclear Power Planti Unit 3< Car,ol,ina:

50 403 Shear on Harris nuclear Power Plantr, Unit 4~ Carolina AUTH',NAME'UTHOR AFFILIATION MCDUFFIE<~M>>A, Carolina Power 8 Light Co.

RECIP>>NAMKi RECIPIENT AFFILIATION, DENTON't H's R ~

Office of Nuclear Reactor Regulationi Director>

SUBJECT:

Advises that QC insp responsibilities discussed, in uti,l 810602'tr have changed, Site'gt Section responsible',forE insp of concrete repairs.Engineering 8 Const QA/QC Se'ction will insp Code Class lr2 8

3 pressure boundary items ~

DISTRIBUTION CODE:

B0010 COPIES RECEIVED:LTR

'NCLQ SIZE:

""L'

'ITLE':

PSAR/FSAR AMDTS and Related Cort espondence NOTES:

mar. G.~<-. ( C.q COPIES INTERNAL: ACCID KVALiBR26 CHEM ENG BR 11 CORF PERF BR 10, EMRG-PRP DEV 35'.

EQUIP QUAL BR13.

GEOSCIENCES 28 HYD/GEO BR 30, I8,K~

06 LIC QUAL BR 32",

MECH ENG BR 18 NRC'DR 02!

OP LIC BR-34 PRo C/TST RKV 20.

RAD ESS BR22'.

01>>

STRUCT" ENG

BR25, EXTERNALS ACRS NSIC 1.

1 1"

1 2

2 3

1 1

1 1

1 1

1 1

'16 1

1.-

LPDR 03 AUX SYS BR 27 CONTi SYS, BR.

09 EFF TR SYS BR12'MRG PRP LIC 36 FEMA~RKP OIV 39 HUM FACT-ENG 40 I8C'YS BR 16 L'IC GUID BR 33 NATL< ENG BR 17 MPA OELO" PO'I'JER S'f4,'R 19-QA,BR "','1 REAC SYS BR 23 SIT AN'AL: BR 24

'-'k r 1

1 3

1 1

1 1

1 1

1 1

1 1

1 TOTAL NUMBER OF COPIES REQUIRED ~

LiTTR 1

ENCL"

4 7

t a

I I

4 II ll' f

n IJ

Carolina Power & Light Company Mr. Harold R. Dent:on, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D.C.

20555

,'~<PA) ~

JW 261981~

]

ILS. MXLSLRRSRlJLIottI SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS. 1, 2,- 3 AND 4 DOCKET NOS. 50-400, 50-401,'50-402" AND 50-403 UALITY ASSURANCE ORGANIZATION

Dear Mr. Denton:

On June 2,, 1981, Carolina Power

& Light'ompany (CP&L) submitted a letter informing you of CP&L's revised Corporate Quality Assurance Program as related to the information currently existing in Section 1.8 of the PSAR.,

The intent of this letter is to inform you that as a result of recent changes in the division of responsibilities between the CP&L'arris Site Management Section and the CP&L'ngineering

& Construction Quality Assurance/

Quality'ontrol Section, the'C inspection responsibilities'detailed in Item 17 of CP&L's June 2, 1981, letter have been changed to now require the Harris Site Management Section to be responsible for inspection of concrete repairs.

CP&L's Engineering

& Construction Quality Assurance/

Quality, Control Section will monitor this activity'.

Also, CP&L's Engineering

& Construction Quality'Assurance/Quality'ontrol Section will now be respon-sible for QC inspection of assembly/disassembly of, ASME Section III Code Class 1, 2 and 3 'pressure boundary items.

If you have further questions on this subject, please contact our staff.

NJC/mt.(909746) cc:

Mr. J.

P. O'Reilly'(NRC-II)

Yours very truly, M. A. McDuffie Senior Vice President Engineering and Construction Group 82 O6~9 411 Fayetteville Street