ML18017B273
| ML18017B273 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 11/03/1980 |
| From: | Mcduffie M CAROLINA POWER & LIGHT CO. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8011070460 | |
| Download: ML18017B273 (4) | |
Text
I~
REGULATOP
'INFORMATION DISTRI I
ACCESSION NBR:8011070460 DOC,DATE: 80/11/0 FACIL:50-400 Shear'on Harris Nuclear Pow'er Pl 50"401 Shearon Harris Nuclear Power Pl 50 40?
Shearon Harris Nuclear Power Pl 50-403 Shearon Harris Nuclear Power Pl AUTHBNAME AUTHOR AFFILIATION MCDUFFIEiM.A.
Carol,ina Power 8 Light Co.
RECIP ~ NAME RECIPIENT AFFILIATION EISENHUTiD,G, Division of Licensing BUTION S '"TEM (RIDS) 3 NOTARIZED:
NO anti Unit ii Carolina anti Unjt 2i Carolina anti Unit 3i Carolina anti Unit 4i Carolina DOCKET 05000400 05000401 05000402 05000403
SUBJECT:
Informs that planned staffing levels described in FSAAR are consistent w/interim criteria provjded in 800731 ltr Administrative procedures will be implemented prior to fuel
- loading,
'DISTRIBUTION CODE:
BOOIS COPIES RECEIVED:LTR j ENCL SIZE:
TITLE: PSAR/FSAR AMDTS and Related Correspondence NOTES:
RECIPIENT ID CODE/NAME ACTION; A/D LICENSNG RUSHBROOKiM ~
INTERNAL: ACCID EVAL) BR26 CHEM ENG BR 08 CORE PERF BR 10 EMERG PREP 22 GEOSCIENCES 14 HYD/GEO BR 15=
ISE 06 I IC QUAL. BR MECH ENG BR 18 NRC PDR 02 OP LIC, BR
.PROC/TST REV 20 ESS BR22 G
F IL 01 NG BR25 COPIES Lq'TR EN L,
1 1
1 1
1 1
2 3
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME YOUNGBLOOD,B NILSONiJERRY 04 AUX SYS BR 07 CONT SYS BR 09 EFF TR SYS BR12 EQUIP QUAL BR13 HUM FACT ENG BR ILC SYS BR 16 LI C GUID BR MATL ENG BR-17 MPA OELD POKER SYS BR 19 QA BR 21 REAC SYS BR
?3 SIT ANAL BR 24 SYS INTERAC BR COPIES LTTR ENC 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
EXTERNAL: ACRS NSIC 27 05 16 1
1 LPDR 03 ltAV $.6 fag TOTAL NUMBER OF. COPIES REQUIRED:
LTTR 55 ENCL
'0 l
~l g I
k N
N k
.i - "v"'"0 DISTRIBUTIOII 0
SB<VICES UNIT 0
Carolina Power & Light Company November 3
1980
~~ ~GV 6 PM 5 00 Mr. Darrell G. Eisenhut, Director Division of Licensing United States Nuclear Regulatory Commission Washington, D.
C.
20555 US HRC DISTRIBUTIONSERV/CES BRANCH SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS. 1, 2, 3 AND 4 DOCKET NOS. 50-400, 50-401, 50-402, AND 50-403 INTERIM CRITERIA'FOR SHIFT hfANNING
Dear Mr. Eisenhut:
As requested in your letter of July 31, 1980, Carolina Power Light Company (CP&L) has reviewed the planned staffing for the Shearon Harris Nuclear Power Plant (SHNPP).
That review has concluded that the present plans for staffing the SHNPP and the planned staffing levels, as described in the SHNPP Final Safety Analysis Report (FSAR) which was tendered June 26, 1980, are consistent with the interim criteria provided in your letter.
Schedules and commitments for meeting that staffing plan are also included in the FSAR.
The staffing plan schedule for recruitment and training is presently being reviewed in light of of the construction schedule which was forwarded to you in our letter of August 13, 1980.
Any changes to the staffing plan schedule will be submitted to you in the form of an FSAR amendment.
Additionally, CP&L will include in the Administrative Procedures for the SHNPP provisions governing required shift manning and movement of key individuals about the plant.
These provisions will assure that qualified plant personnel are readily available in the event of an abnormal or emergency situation.
The Administrative Procedures will also contain provisions restricting the use of overtime-in accordance with the criteria provided in your July 3g, 1980 letter.
These Adminis-trative Procedures will be implemented prior to initial fuel load at the SHNPP.
If you have any questions concerning this subject, please contact our staff.
Yours very truly, MAM/jc (427-'496)
M. A. McDuffie Senior Vice. President Engineering