I REGULATOR NFORMATION DISTRIBUTION TEM (RIDS)
ACCESSION NBRe8011070036 DOC ~ DATE: BO/11/03 NOTARIZED'O FACIL:50-000 Shearon Herr is Nuclear Power Plant~
Unit li Carolina t
50"401 Shearon Harris Nuclear Power Plenty Unit 2g Caro'I ina 50-402 Shear on Harris Nuclear Power Plant~
Unit 3i Carolina 50"Ll03 Shearon Harris Nuclear Power Plant~
Unit 0i Carolina AUTH'Ah1K AUTHOR AFFILIATION MCDUFFIE<M,A, Carolina Power 8 Light Co.
RECIP ~ NAME RECIPIENT AFFILIATION EISENHUTgD,G.
Division oif Licensing SUBJECT; Forwards specific data on environ qualification testing of safety-related equipment to be performed within next two.
years'ISTRIBUTION CODE:
B001S COPIES RECEIVED:LTR ~ ENCL SIZE:
TITLE: PSAR/FSAR AMDTS and Related Correspondence
'J t
NOTES DOCKET ¹ 05000000 05000401 05000402 05000403
'ACTION; I
,,INTERNAI.:
RECIPIENT ID COOK/NAME A/D LICENSNG RUSHBROOKp41 ~
ACCID EYAL BR26 CHEM ENG BR'8 CORE PERF BR 10 EMERG PREP 22 GEOSC IENCES 14 HYD/GEO BR 15 I8E 06 LIC QUAL BR MECH ENG BR 18 NRC PDR 02 OP LIC BR PROC/TST REY 20 RAD ASSESS BR22 01 G
BR25 COPIES LITTR ENCL 1
0 1
0 1
1 1
1 1
1 1
0 1
1 2
3 3
1 1
1 1
1 1
1 1
1 1
1 REC IPIKNT ID CODE/NAME YOUNGBLOODgB WILSON p JERRY 00 AUX SYS BR 07 CONT SYS BR 09 EFF TR SYS BR12 EQUIP QUAL BR 13 HUM FACT ENG BR I8C SYS BR 16 LI C GUID BR MATL ENG BR 17 MPA OELD POHER SYS BR 19 QA BR 21 REAC SYS BR 23 SIT ANAL BR 24 SYS INTERAC BR COPIES LTTR ENCl 1
0 1,
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 0
1 0
1 1
1 1
1 1
1 1
1 EXTERNAL: ACRS NSIC 27 05 16 16 1
1 LPDR 03 1
1 KOV >0 au~
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 55 ENCL Q9
l\\
U C
J
~
1, p
r,,
I
(
o'" >i
~~~o 0 ttKEIV->>V,OIS7RlPQ,,GQ
~~o+
SERVI~ GAIT,"
Carolina Power & Light Company 5MIBOV' Pi~)
g~
Qg,'ovember 3,
1980 US HRZ:
DISTRIBUTIONSERVICES BRARClk.
Mr. Darrell G. Eisenhut, Director Division of. Licensing U. S. Nuclear Regulatory Commission Washington, D.
C.
20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS. 1, 2, 3,'AND 4 DOCKET NOS. 50-400, 50-401, 50-402, AND 50-403 ENVIRONMENTAL UALIFICATIONOF'SAFETY-RELATED 'E UIPMENT
Dear Mr. Eisenhut:
Your letter of October 1, 1980,requested specific data on environmental qualification. testing of safety-related equipment to be performed within the next two years.
The environmental qualification testing required of safety-related equipment for the Shearon Harris Nuclear Power Plant (SHNPP) is being conducted for Carolina Power Light Company (CP&L) by our architect-engineer, Ebasco Services, Incorporated, and by our NSSS vendor, Westinghouse Electric Corporation.
Attached please find a listing of tests planned for SHNPP equipment supplied by the architect-engineer during the next two years.
Equipment supplied by our NSSS vendor will be tested in accordance with the Westinghouse Environmental Qualification Program Plan. It is our under-standing that planned testing under that Program Plan is being forwarded to you directly by Westinghouse.
We trust that this information is responsive to your present needs.
Any questions concerning this information or the subject testing should be directed to Mr. D. L. Bensinger of our Nuclear Licensing Unit.
Yours very truly, Qd.W-M. A. McDuffie Senior Vice President Engineering
& Const:ruction JJS/jc (882-383)
Attachment cc:
Mr. James P. O'Reilly (NRC-II)
Boo(
5 i'0 110VOi 411 Fayetteville Street o P. 0. Box 1551 o Raleigh, N. C. 27602
J I
L N
ll M> ~
C f% ~
'IV<i II&M ~Jll d'I
ATTACHMENT 1 Equipment Description e
Model Manuf.
System Test Location
& Schedule l.
125V Battery, LC-19.
C
& D Batteries DC & Vital AC System Plymouth Meeting, MASS (Environmental)
Wyle Labs (Seismic),
ALA (Test schedules not established) 2.
150A Battery Charger, ARR130HK150F.
C & D Batteries DC & Vital AC System Acton Labs, MASS (Test schedules not established) 3.
600V Power
& Control Cable (Kerite:
Power FR/FR.
Control FR ll/
FR)
Schedule Date Isomedix Inc. Parsippany, NJ Kerite, Seymore, CT Sample Prepared (Kerite)
Thermal Aging (Kerite) 05-29-80 06-06-80 Radiation Aging 07-11-80 (Isomedix)
Environmental Exposure (Isomedix) 10"29-80 Post LOCA Evaluation (Isomedix) 11-07-80 Test Report (Isomedix/
Kerite) 01-15-81 4.
Instrumentation Cable (AIW FR-EP-HYPALON)
Franklin Research Center.
Philadelphia, PA LOCA Test Jan.-Feb.
1981 5.
Triax Cable (BIW Tefzel/HYPALON)
Boston Insulated Wire, MASS (No schedule submitted, test to start no later than 02-81)
ff
'I f
e llf I
ii C I
fi ff I"
I
ATTACHMENT 1 (CONT'D)
Equipment Description e
Model Manuf.
S stem Test Location
& Schedule 6.
Diesel-Generator, Control Panel, and Accessories, Delaval Emergency Standby Power System
- Portec, Inc. Electric Products Division, Cleveland, OH (Test to start 12-80) 7.
Diesel-Engine Control Panel, Delaval Emergency Standby Power System Wyle Labs, ALA (Test to start 12-80) 8.
Water Chillers, York Chilled Water System for ESF in RAB & FHB Test Lab
& Location not es-tablished, Seismic
& Envi-ronmental Tests before 12-81 9.
Centrifugal Fans.
122-BBC, 7200.7245, Barry Blower Battery Rooms
& DGB Ventilation Systems Wyle Labs, Seismic Environmental Test before 12-81
- 10. Electric Heating Coils, Brasch Manufacturing
- 1. Control Room AC System
- 2. Air Cleaning Units (Humidity Control)
Test Lab
& Location not established.
Seismic Environmental Test before 12-81 ll. PORV Actuators, Vol 12 U "M",
Paul Monroe Main Steam System Test Lab
& Location not established Seismic Environmental Test by 12-81 12.
Spent Fuel Pool Cooling Water Pump Motors, Siemans-Allis Spent Fuel Pool Cooling Water System Test Lab
& Location not established Seismic Environmental Test by 12-81
- 13. Service Water Booster Pump Motors, Siemans-Allis Service Water System Test Lab
& Location not established Seismic Environmental Test by 12-81
- 14. Control Valve Act-
- uators, NH-91
& 92, ITT General Controls HVAC System Chilled Water System Screen Wash System Auxiliary Feed Water System Test Lab
& Location not established, Additional "Aging" Tests required by 12-81
- 15. Auxiliary Relay
- Cabinets, Systems Control Control Cabinets Environmental Test-Acton
- Labs, MASS, Jan 1981
wn Eq E'
A II g C
ATTACHMENT 1 (CONT'D)
Equipment Description Ty e Model Manuf.
System Test Location
& Schedule
- 16. Isolation Cabinets, Consolidated Control Control Cabinets Environmental Test-Consolidated
- Control, CT Nov.
1980
- 17. Transfer Panels, Systems Control Control Cabinets Environmental Test-Acton
- Labs, MASS, Jan 1981 18.
Sequencer
- Panels, Systems Control Control Cabinets Environmental Test-Acton
- Labs, MASS, Jan 1981
- 19. Thermocouple Assemblies, Weed Seismic Test-Wyle Labs,
- ALA, by 12-81 Cont. Vent System, Post Accident Monitor, ESF Equip.
Cooling System, Spent Fuel Pool Pump Room Vent System, FHB Emgr Exh System, Control Room Vent
- System, RAB SWGR Room Vent System, Chilled Water System, Emer Serv Water System, Emer Serv Water Pump Room Vent System, Feed Water System Test Location to be established.
Seismic Environmental Tests by 12-82
- 20. Auxiliary Control Board, Reliance Electric Control Panels Test Location to be established.
Seismic Environmental Tests by 12-82
- 21. Local Instrument Cabinets and Racks, Mercury CD Control Panels Test Location to be established.
Seismic Environmental Test by 12-82
- 22. Level Switches, Magnetrol, Inc.
A15351 17-7-75 Post-Accident Monitoring Seismic
& Environmental Test-Wyle Labs, by 12-82
- 23. Level Transmitters, Gems-Dalaval, RE-36562 1XM-36495 RHB System Post-Accident Monitoring, Emergency Serv.
Water System Seismic
& Environmental Tests-Wyle Labs, by 12-82
I ~
~,
4=It tete I
0 I
]
'mtr R
e 4 t I "
~
It 4
I I It II tl 4I'll '
I
~
I f te 4
4 I
4 tt lt I'4 4
e I ~
e M)IR
~
~
I I
e 4 I
4
~
0
~
4l ATTACHMENT 1 (CONT'D)
Equipment Description e
Model Manuf.
System Test Location
& Schedule 24.
Low Range hPressure Transmittors, FLO-TEK, NS-10RA-2A2 Cont Vent System, Post-Accident Monitoring, Radia-tion Monitoring, RAB Emergency Exhaust
- System, FHB Emergency Exhaust
- System, Elec Equip Room Vent System, Control Room Vent System Seismic
& Environmental Tests-Southwest
- Labs, San Antonio, TX, by 12-82
0 e
l 8
t C
r