Responds to IE Bulletin 80-19.Initial Review of Design Indicates No mercury-wetted Matrix Relays Are Used in Reactor Protection Sys.Addl Reviews & Inquires Are Required
ML18017B223
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 08/29/1980
From: Mcduffie M
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEB-80-19, NUDOCS 8009120593
Download: ML18017B223 (2)


Text

~ 'e%t~A we Ag e

< i i34 l1 t..v t.l,'l Carolina Power 5 Light Company August 29, 1989 SEI

'l Mr. J. P. O'Reilly Region II U. S. Nuclear Regulatory Commission 101 Marietta Street, N.W.

Atlanta, Georgia 30303 SHEARON KG%IS NUCLEAR POWER PLANT DOCKET NOS 00 50-401, 50-402, AND 50-403 IE BULLETIN

'ear Mr. O'Reilly:

As requested by IE Bulletin 80-19, Carolina Power 6 Light Company (CPBL) is actively reviewing the design of the Reactor Protection System (RPS) for the Shearon Harris Nuclear Power Plant (SHNPP) to determine if mercury-wetted relays are used in that system.

Our initial review indicates that no mercury-wetted relays are used in the RPS for the SHNPP, however, we have deterttdned that additional review and inquires are required.

Upon completion of this further investigation, CPGL will provide the NRC with the results of that review.

If you have any questions on this subgect, please contact our staff.

Yours very truly, M. A. McDuffie Senior Vice President Engineering

& Construction JJS/MAM/dk cc:

Director, Division of Reactor Operations Inspection Office of Inspection 6 Enforcement United States Nuclear Regulatory Commission Washington, D. C.