Forwards IE Insp Repts 50-400/80-16,50-401/80-14, 50-402/80-14 & 50-403/80-14 on 800623-27.No Noncompliance Noted
ML18017B220
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 08/13/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML18017B219 List:
References
NUDOCS 8009100250
Download: ML18017B220 (4)


See also: IR 05000400/1980016

Text

i

ri

gp.g RICO

Cy

Cy

O

Ol

0r

I

+~

gO

++*++

In Reply Refer To:

RII:DKW

50"400/80>>16

50-401/~-14

50-402/80-14

50-403/80-14

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

AtlA $ $ 1980

Carolina Power and Light Company

ATTN: J. A. Jones

Senior Executive Vice President

and

Chief Operating Officer

411 Fayetteville Street

Raleigh,

NC

27602

Gentlemen:

This refers

to the

inspection

conducted

by

D. K. Walters of this office on

June 23-27,

1980,

of activities

authorized

by

NRC Construction

Permit

Nos.

CPPR-158,

CPPR-159,

CPPR-160

and

CPPR-161

for the Shearon Harris facility, and

to the discussion

of our findings held with P.

W. Howe

and S.

D. Smith at the

conclusion of the inspection.

~

~

Areas

examined

during the

inspection

and

our findings

are

discussed

in the

enclosed

inspection

report.

Within these

areas,

the inspection

consisted

of

selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

Within the scope of this inspection,

no items of noncompliance

were disclosed.

In accordance

with Section 2.790 of the

NRC's

"Rules of Practice",

Part 2,

Title 10,

Code of Federal

Regulations,

a

copy of this letter and the enclosed

inspection report will be placed in the

NRC's Public Document

Room. If this

report

contains

any information that you (or your contractor)

believe to be

proprietary, it is necessary

that you make

a written application within 20 days

to this office to withhold such information from public disclosure.

Any such

application

must include

a full statement of the reasons

on the basis of which

it is claimed that the information is proprietary,

and should

be prepared

so

that proprietary information identified in the application is contained in a

separate

part of the document. If we do not hear from you in this regard within

the specified period, the report willbe placed in the Public Document Room.

Should you have any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

C. E. Murph

,

C ief

Reactor Constructio

and Engineering

Support Branch

Enclosure:

(See

Page

2)

0

P

Carolina Power and Light Company

4U813 paso

Enclosure:

Inspection Report Nos. 50-400/80-16,

50-401/80-14,

50-402/80-14

and 50-403/80-14

cc

gw encl:

R. Parsons,

Site Manager