Text
i
ri
gp.g RICO
Cy
Cy
O
Ol
0r
I
+~
gO
++*++
In Reply Refer To:
RII:DKW
50"400/80>>16
50-401/~-14
50-402/80-14
50-403/80-14
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTAST., N.W., SUITE 3100
ATLANTA,GEORGIA 30303
AtlA $ $ 1980
Carolina Power and Light Company
ATTN: J. A. Jones
Senior Executive Vice President
and
Chief Operating Officer
411 Fayetteville Street
Raleigh,
NC
27602
Gentlemen:
This refers
to the
inspection
conducted
by
D. K. Walters of this office on
June 23-27,
1980,
of activities
authorized
by
NRC Construction
Permit
Nos.
CPPR-158,
CPPR-159,
CPPR-160
and
CPPR-161
for the Shearon Harris facility, and
to the discussion
of our findings held with P.
W. Howe
and S.
D. Smith at the
conclusion of the inspection.
~
~
Areas
examined
during the
inspection
and
our findings
are
discussed
in the
enclosed
inspection
report.
Within these
areas,
the inspection
consisted
of
selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
Within the scope of this inspection,
no items of noncompliance
were disclosed.
In accordance
with Section 2.790 of the
NRC's
"Rules of Practice",
Part 2,
Title 10,
Code of Federal
Regulations,
a
copy of this letter and the enclosed
inspection report will be placed in the
NRC's Public Document
Room. If this
report
contains
any information that you (or your contractor)
believe to be
proprietary, it is necessary
that you make
a written application within 20 days
to this office to withhold such information from public disclosure.
Any such
application
must include
a full statement of the reasons
on the basis of which
it is claimed that the information is proprietary,
and should
be prepared
so
that proprietary information identified in the application is contained in a
separate
part of the document. If we do not hear from you in this regard within
the specified period, the report willbe placed in the Public Document Room.
Should you have any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
C. E. Murph
,
C ief
Reactor Constructio
and Engineering
Support Branch
Enclosure:
(See
Page
2)
0
P
Carolina Power and Light Company
4U813 paso
Enclosure:
Inspection Report Nos. 50-400/80-16,
50-401/80-14,
50-402/80-14
and 50-403/80-14
cc
gw encl:
R. Parsons,