Responds to IE Bulletin 80-08.Review of Containment Liner Penetration Weld Designs Verified by Applicable Drawings. Welds Not Complete as Plant Is Under Const
ML18017B174
Person / Time
Site: Harris  
Issue date: 07/02/1980
From: Mcduffie M
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEB-80-08, IEB-80-8, NUDOCS 8007220210
Download: ML18017B174 (3)


Text

CfPC:L Carolina power & Lighr lgoing LtL <>>-

July 2, 1980 "0 JlJL 7

~9: )1 Mr. J.

P. O'Reilly Region II U.

S. Nuclear Regulatory Commission 101 Marietta Street, N.W.

Atlanta, Georgia 30303

~~HAD gc>~

Qp SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS ~ 1, 2, 3 AND 4 DOCKET NOS ~

50 400 g 50 40 1 g 50%02 g AND 50-403 IE BULLETIN 80&8

Dear Hr. O'Reilly:

As requested by IE Bulletin 80&8, Carolina Power

& Light Company (CP&L) has reviewed the design of the containment liner penetration welds for the Shearon Harris Nuclear Power Plant (SHNPP).

The results of that review are presented below:

1 ~

The SHNPP containment penetrations are designed in accordance with ASME Code Section III, Subsection NE, Figure NE-1120-1.

This is reflected on the applicable drawing.

2.

The applicable Code for field welding between the flued head and

.outer sleeve is ASME Section III, Division 1, 1974 edition, 1976 winter addenda, to class MC with no stamping.

3.

The weld will be examined by radiography as specified by the applicable drawing.

0 4.

The type of weld joint is 37 1/2 bevel and the welding will be made using either an open butt joint with a welding process GTAW root and SHAW weld out or with a backing ring using the SHAW process.

5.

These welds have not been made as of this date.

80 o >a eowry 411 Fayettevitte Street

~ P. O. Box 1551

~ Raleigh, N. C. 27602 (a~'1 j.('JAK ("Oi'~'

Mr. J.

P. O'Reilly If you have any questions on this subject, please contact our staff.

CP6L plans no further response to this bulletin.

Yours very truly, M. A. ~ McDuffie Senior Vice President Engineering

& Construction MAD:pfb cc:

Director, Division of Reactor Construction Inspection United States Nuclear Regulatory Commission Washington, D. C.

20555