Forwards IE Insp Repts 50-400/80-11,50-401/80-08, 50-402/80-08 & 50-403/80-08 on 800422-24 & Notice of Violation
ML18017B135
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 05/13/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML18017B132 List:
References
NUDOCS 8007100428
Download: ML18017B135 (4)


See also: IR 05000400/1980011

Text

1P,S REOI

+4

.~o

Cy

nO

cA

0

+~

gO

++*++

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA

(ATE)ggA

30303

ev i

In Reply Refer To:

RII:JJL

50-400/80-11

50-401/80-08

50-402/80"08

50-403/80-08

Carolina Power

and Light Company

ATTN:

J.

A. Jones

Senior Executive Vice President

and

Chief Operating Officer

411 Fayetteville Street

Raleigh,

NC

27602

Gentlemen:

This refers to the inspection

conducted

by J. J.

Lenahan of this office on

April 22-24,

1980 of activities authorized

by NRC Construction Permit Nos.

CPPR-158,

CPPR-159,

CPPR-160

and

CPPR-161 for the Shearon Harris facility, and

to the discussion of our findings held with R.

M. Parsons

at the conclusion of

the inspection.

Areas

examined during the inspection

and our findings are discussed

in the

enclosed

inspection report.

Within these

areas,

the inspection consisted of

selective

examinations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

We have examined actions you have taken with regard to previously identified

enforcement matters

and unresolved

items.

The status of these

items is discussed

in the enclosed

report.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements.

This item and references

to pertinent requirements

are listed in the Notice of Violation enclosed

here-

with as Appendix A.

This notice is sent to you pursuant to the provisions of

Section 2.201 of the NRC's "Rules of Practice," Part 2, Title 10,

Code of Federal

Regulations.

Section 2.201 requires

you to submit to this office, within 20

days of your receipt of this notice,

a written statement

or explanation in reply

,

including:

(1) corrective steps

which have been taken by you and the results

achieved;

(2) corrective steps

which will be taken to avoid further noncompli-

ance;

and (3) the date

when full compliance will be achieved.

In accordance

with Section 2.790 of the NRC's "Rules. of Practice," Part 2,

Title 10,

Code of Federal Regulations,

a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room. If this

report contains

any information that you (or your contractor) believe to be

proprietary, it is necessary. that you make

a written application within 20 days

- to this office to withhold such information from public disclosure.

Any such

application must include

a full statement

of the reasons

on the basis of which

it is claimed that the information is proprietary,

and shoul'd be prepared

so

800 Vy00'

1

, I)

Carolina Power and Light Company

MAY

3 1980

that proprietary information identified in the application is contained in a

separate

part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

Should you have any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

C. E. Murphy, Chief

Reactor Construction

and

Engineering

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-400/80-11,

50-401/80-08,

50-402/80-08

and

50-403/80"08

cc w/encl:

R. Parsons,

Site Manager

P. 0.

Box 101

New Hill, NC

27562

0