Confirms 800606 Telcon Which Clarified That Deficiencies Identified During NRC Audit Need Not Be Evaluated for Reportability Per 10CFR50.55(e) & 10CFR21.Evaluation Would Involve Duplicity of Action
ML18017B113
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 06/12/1980
From: Chiangi N
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
SH-N-2-18, NUDOCS 8006240383
Download: ML18017B113 (4)


Text

REGULATOR NFORMAT ION DISTRIBUTION 1'EM (RIDS)

ACCESSION NBRt8006290383 DOC ~ DATE: 80/06/12 NOTARIZED; NO DO ¹ FACIL:50-000 Shearon Harris Nuclear Power Planti Unit 1i Carolina 00040 50-401 Shearon Harris Nuclear Power Plant~ Unit 2i Carolina BYNAME 0

50-402 Shearon Harris Nuclear Power Plenty Unit 3r Carolina ,05000L$ 02 AUTH AUTHOR AFFILIATION CHIANGIiN,J. Carolina Power 8 Light Co,,

RECIP,NAME RECIPIENT AFFILIATION O'RE ILLYr J ~ P ~ Region 2g Atlanta~ Office of the Director

SUBJECT:

Confirms 8'00606 telcon which clarified that deficiencies identified during NRC audit need not be evaluated for reportabi'lity per 10CFR50.55(e) 8 10CFR21.Evaluation would involve duplicity of action.

DISTRIBUTION CODE: B019S COPIES RECEIVED;LTR ENCL SIZEs J TITLE: Construction Deficiency Report (10CFR50 ~ 55E)

NO TES > eemmea~~wmweeer~wweeeeeseseewm WWWIWOeOeeOWtwPI~AI~M~MWOs&Woogl%0WIAWIOw~oOW RECIPIENT COPIES RECIPIENT C.OPIES ID CODF/NAME LTTR ENCL ID CODE/NAME LTTR ENCL ACTION: AD A/Q vlc~5/~1 C fo0nlc 9~+514 LA a,~~Wooa,pPO M + g ~gogq +

INTERNAL: AD/RC I/IE AEOD 1 EDO 8 STAFF 07 EQUIP QUAL BR16 1 FIELD COOR/IE13 HANAUERgS ~ 1,,

HYD/GEO BR 22 I8E 05 2 L I C QUAL BR'PA MOOREpV ~ 1 08 NRC PDR 02 1 OELD 23 OR ASSESS BR 17 1 PROC/TST REV BR QA BR 10 01 STANDRDS DEY 11 1 EXTERNAL: ACRS 2A 16 1 LPDR ,. 03 NSIC OQ 1 Jgp ~

>>uy TOTAL NUMBER OF COPIE'S REQUIRED: LTTR 0 1 ENCL

n II f 'l J

P

FORM 22-50M CPL Carolina Power & Light Company Vi1e: SH. 8-2/18 Item 17 June 12, 1980

m. James P. O'Railay

'United States Nuclear Regulatory Commission Region II 101 1hrietta Street, Northwest

'tlanta, Georgia 30303 SHEARS HARRIS NUCLEAR POWER PLANT UNITS 1, 2, 3, AND 4 DOCKET HOS. 50-400, 50<<401~ 50-402, 5$ -403, lOCPR50.55(e) AND 10CPR, PART 21 hZPORTARILIrx EVALUATIONS Defr ~fr. O'Reilly:-

The intent of this letter is,to confirm the telephone conversation held on June 6, 1980, with your Hr. J. K. Rausch wherein it was clarified by Hr. Rausch that deficiencies identified by the NRC during an audit need nut be evaluated for,.

reportability per the provisions of 10CFR50.55(e) and'0CPR, Part 21. This clarification was based on the fact that evaluating deficiencies identified by'he NRC fox'eportability would involve duplicity of action since '(a)the RIC had identified the deficiencies and hence was aware of the'n, and (b)xesolution of the deficiencies as audit findings, would entail inplemcntation of the. same corrective action as would be ta'ken for a repoxtable item.

If you have any questions rejarding,this matter, please do not hesitate to contact me.

Yours very truly, Km/mt (1294) cc: Nr, V. Ste11o (2)+

Original Signed By

<. J. Chianti N. Z. Chiangi .Mhfager Eagineering 6 Construction Quality Assurance