Forwards Revised Periphyton/Plankton Biological Monitoring Program to Provide Preimpoundment Phytoplankton Data for Comparison w/post-impoundment Data
ML18017B108
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 06/10/1980
From: Mcduffie M
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML18017B109 List:
References
NUDOCS 8006160145
Download: ML18017B108 (4)


Text

0 DO

¹ 0

01 05000002 OdoO&o3 1l NOTES; W&&&WHOW~

pP REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8006160105 DOC ~ DATE: 80/06/10 NOTARIZED:

NO FACIL:50 000 Shear on Harr i s Nuclear Power Pl ant E

Uni t 1 i Carol ina 50-401 Shearon Harrjs Nuclear Power Planti Unit 2E Carolina 50-002 Shearon Harris Nuclear Power Plenty Unit 3E Carolina AUTH INANE AUTHOR AFFILIATION MCDUFFIEEM ~ AD Carolina Power 8 Light Co ~

RECIP ~ NAME RECIPIENT AFFILIATION DENTONEH ~ RE Office of Nuclear Reactor Regulation t

SUBJECT:

Forwards revised periphyton/plankton biological monitoring program to provide,preimpoundment phytoplankton data for comparison w/post-impoundment data'ISTRIBUTION CODE:

C002S COPIES RECEIVED:LTR g ENCL g SIZE'.QE'

,TITLE: Environ.,

Comments'ECIPIENT ID CODE/NAME ACTION:

AD /fan LICE'&N+

LA gllsflieOK/q 1B INTERNAL! ENV ENG BR 09 NR 02 F IL 01 COPIES LTTR ENCL 1,

0 1

1 1

1 1

11, RECIPIENT ID CODE/NAME BC feekgxe0,b 17 PM VtaSOp/,J.

05 ISE 07 OELD SIT -ANAL BR'0 COPIES LTTR ENCL.

1 1

1 1

2 2

1 0

1 1

EXTERNAL: ACRS NATL LAB ops 20 1

0 5

5 LPDR NSIC 03 04 1

1 1

1 JUI< 17 )geo TOTAL NUMBER OF COPIES REQUIRED:

LTTR 19 ENCL 16

lh

,I A

~

Ei I

f f

<)

V

~ II

)t

)t 1p.

fl

CIGAR Carolina Power & Light Company June 10, 1980 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulations United States Nuclear Regulatory.Commission Washington, D.

C.

20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS. 1, 2, 3, AND 4 DOCKET NOS. 50-400, 50-401, 50-402, AND 50-403 CONSTRUCTION PHASE ENVIRONMENTAL,MONITORING PROGRAM

Dear Mr. Denton:

The Construction Permit for the Shearon Harris Nuclear Power Plant (SHNPP) requires that Carolina Power

& Light Company (CP&L) conduct a comprehensive environmental sampling, monitoring, and surveillance pro-gram adequate to determine an"ecological baseline for measuring the operational impact of the station on land and water ecosystems.

Based on this requirement and general statements made by the NRC in the Revised Final Environmental Statement, CP&L designed a monitoring and sampling program to satisfy these requirements.

A copy of the original program was provided to Mr. Andrew Cunningham of NRC Region II during a site visit early in 1978.

A subsequent correction of a sampling station designation was conveyed to you in a letter from me dated January 28, 1980.

One change was made to the monitoring program during the first quarter of 1980 to improve the program design.

The change was a shift in emphasis of the periphyton/plankton monitoring program from periphyton to phytoplankton.

A copy of the revised monitoring program is attached.

Baseline studies at the site focused on the periphyton component of the plankton communities because those organisms were dominant forms in the streams of the project area.

When the reservoir is completed and filled, phytoplankton are expected to become dominant.

Therefore, the pxogram change was made to provide preimpoundment phytoplankton data for com-parison with subsequent postimpoundment data.

The.,existing periphyton data base is more than adequate for any future comparisons that may be necessary.

Please contact my staff if you have any questions concerning this matter.

Yours very truly, MAM/jc (5437)

Attachments M. A. McDuffie Senior Vice President Engineering