ML18017B073

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-400/80-09,50-401/80-09, 50-402/80-09 & 50-403/80-09 on 800324-26.No Noncompliance Noted
ML18017B073
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 04/21/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML18017B072 List:
References
NUDOCS 8005200167
Download: ML18017B073 (3)


See also: IR 05000400/1980009

Text

IISO(,~

~40

~o

Cy

ClO

CO

C

O~

~O

++*++

In Reply Refer To:

RII:EHG

50-400/80-09

50"401/80"09

50-402/80"09

50-403/80-09

UNITEDSTATES

NUCI-EAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

~pg

',) 2 '.$980

s ooss oo1 07

Carolina Power and Iight Company

ATTN: J. A. Jones

Senior Executive Vice President

and

Chief Operating Officer

411 Fayetteville Street

Raleigh,

NC

27602

Gentlemen:

This refers to the inspection conducted by E. H. Girard of this office on March 24

through 26,

1980 of activities authorized by NRC Construction Permit Nos. CPPR-158,

CPPR-159,

CPPR-160,

and

CPPR-161 for the Shearon Harris facility, and to the dis-

cussion of our findings held with A. M. Iucas at the conclusion of the inspection.

Areas

examined

during the inspection

and

our findings are

discussed

in the

enclosed

inspection

report.

Within these

areas,

the inspection

consisted

of

selective examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

Within the scope of this inspection,

no items of noncompliance

were disclosed.

We

have

examined

actions

you have

taken with regard

to previously reported

unresolved items.

The status of these items is discussed in the enclosed report.

Two new unresolved

items resulted

from this inspection

and are discussed in the

enclosed report.

These items willbe examined during subsequent

inspections.

0

In accordance with Section 2.790 of the NRC's "Rules of Practice", Part 2, Title

10, Code of Federal Regulations,

a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document

Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary

that you make

a written application within 20 days to this office to

withhold such

information from public disclosure.

Any such application must

include

a full statement of the reasons

on the basis of which it is claimed that

the information is proprietary,

and should be prepared

so that proprietary infor-

mation identified in the application is contained in a separate

part of the

document. If we do not hear from you in this regard within the specified period,

the report willbe placed in the Public Document Room.

gPR "-,. ]98O

Should you have any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

C. E. Murph

,

Reactor Construction

and Engineering

Support Branch

Enclosure:

Inspection Report Nos. 50-400/80-09,

50-401/80-09,

50-402/80-09,

and 50-403/80-09

cc w/encl:

R. Parsons,

Site Manager

P. 0. Box 101

New Hill, NC

27562