Text
IISO(,~
~40
~o
Cy
ClO
CO
C
O~
~O
++*++
In Reply Refer To:
RII:EHG
50-400/80-09
50"401/80"09
50-402/80"09
50-403/80-09
UNITEDSTATES
NUCI-EAR REGULATORY COMMISSION
REGION II
101 MARIETTAST., N.W., SUITE 3100
ATLANTA,GEORGIA 30303
~pg
',) 2 '.$980
s ooss oo1 07
Carolina Power and Iight Company
ATTN: J. A. Jones
Senior Executive Vice President
and
Chief Operating Officer
411 Fayetteville Street
Raleigh,
NC
27602
Gentlemen:
This refers to the inspection conducted by E. H. Girard of this office on March 24
through 26,
1980 of activities authorized by NRC Construction Permit Nos. CPPR-158,
CPPR-159,
CPPR-160,
and
CPPR-161 for the Shearon Harris facility, and to the dis-
cussion of our findings held with A. M. Iucas at the conclusion of the inspection.
Areas
examined
during the inspection
and
our findings are
discussed
in the
enclosed
inspection
report.
Within these
areas,
the inspection
consisted
of
selective examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
Within the scope of this inspection,
no items of noncompliance
were disclosed.
We
have
examined
actions
you have
taken with regard
to previously reported
unresolved items.
The status of these items is discussed in the enclosed report.
Two new unresolved
items resulted
from this inspection
and are discussed in the
enclosed report.
These items willbe examined during subsequent
inspections.
- 0
In accordance with Section 2.790 of the NRC's "Rules of Practice", Part 2, Title
10, Code of Federal Regulations,
a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document
Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary
that you make
a written application within 20 days to this office to
withhold such
information from public disclosure.
Any such application must
include
a full statement of the reasons
on the basis of which it is claimed that
the information is proprietary,
and should be prepared
so that proprietary infor-
mation identified in the application is contained in a separate
part of the
document. If we do not hear from you in this regard within the specified period,
the report willbe placed in the Public Document Room.
gPR "-,. ]98O
Should you have any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
C. E. Murph
,
Reactor Construction
and Engineering
Support Branch
Enclosure:
Inspection Report Nos. 50-400/80-09,
50-401/80-09,
50-402/80-09,
and 50-403/80-09
cc w/encl:
R. Parsons,
Site Manager
P. 0. Box 101
New Hill, NC
27562
0
0