REGULATOR NFORMATION DISTRIBUTION t'EM (RIDS)
ACCESSION NBR:8005080360 DOC ~ DATE! 80/04/15 NOTARI2ED:
NO FACIL:50-400 Shoaron Harris Nuclear Power Planti Unit 1~ Carolina 50-401 Shearon Harris Nuclear Power Plant< Unit 2g Catolina 50 402 Shearon Harris Nuclear Power Planti Unit 3E Carolina AUTH BYNAME AUTHOR AFFILIATION CHIGNGIrN~ J.
Carolina Power I Light Co, RECIP,NAME RECIPIENT AFFILIATION O'REILLYE J, P,'egion 2i Atlantean Office of the Director
SUBJECT:
Notifies NRC that util will complete evaluation of potentially reportable item re weld defects in Westinghouse supplied component cooling water heat exchangers by 800512, DISTRIBUTION CODE:
BOI YB COPIES RECEI YES:LTR j ENCL D
SIZE>
/
TITLE! Construction Deficiency'eport (10CFR50>55E)
NOTES; N N/(
DOCKET 05000400 05000401 05000402 Jog RECIPIENT ID CODE/NAME ACTION; 14 PM rn/Algg 20 LA L,Mg 43 INTERNAL:
G FILE 0
08 MPA 10 QAB 13FIELD COOR/IE 17 AD PLANT SYS 22 DIR DPM AD/RCI/IE AEOD GEOSC IENCES BR 18C SYS BR MECH ENG BR STRUCT ENG BR EXTERNAL: 03 LPDR 24 ACRS COPIES LTTR ENC 1
1 1
2 1
1 1
1 1
1 1
1 1
1 1
16 16 REC IPIENT ID CODE/NAME 15 BC 4-cog NB 21 AD I QIg 02 NRC PDR 07 EDO K STAFF 09 DEPY DIR DPM 11 STANDRDS DEV 16 AD FOR ENGR 17 AD REAC SFTY 23 GELD AD/SITE TECH DIRECTOR DSE HANAUERES, MATL ENG BR POSER SYS BR 04 NSIC COPIES LTTR ENCL
~y ORE-
~ra <> ~~
gg'g L~ S 5 g g'pg$ 4f ~ Li9 NAY 8 ISO TOTAL NUMBER OF COPIES REQUIRED:
LTTR
~'NCL A8
/I t
I It
CARI' 800S080~~O Carolina Power & Light Company
/'" Io April 15, 1980 Mr. James P. O'Reilly United States Nuclear Regulatory Commission Region II 101 Marietta Street, Northwest Atlanta, Georgia 30303 SHEARON HARRIS NUCLEAR POWER PLANT UNITS 1, 2, 3
& 4 DOCKET NOS. 50-400, 50-401, 50-402, 50-403 COMPONENT COOLING WATER HEAT EXCHANGERS
Dear Mr. O'Reilly:
On March 12, 1980, the Region II office (Mr. R. Bradley) was notified by the Carolina Power
& Light Company (CP&L) of a potentially reportable item regarding welding defects in Westinghouse supplied component cooling water heat exchangers.
As indicated during an April 11, 1980, telephone conversation with your Mr. J.
K. Rausch, CP&L has not completed its evaluation of this matter as related to reportability under the provisions of 10CFR50.55(e) and 10CFR, Part 21.
Xt is now anticipated that this evaluation will be completed by May 12, 1980, at which time the NRC will be notified of our decision.
Thank you for your consideration in this matter.
Yours very truly, KVH/bd (1887)
.C N.
Ch gi ager Engineer Construction Quality Assurance go/V 5G
~k 411 Fayetteville Street
~ P. O. Box 1551
~ Raleigh, N. C. 27602