ML18017B017
| ML18017B017 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 04/02/1980 |
| From: | Mcduffie M CAROLINA POWER & LIGHT CO. |
| To: | Lovelace W NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA) |
| References | |
| NUDOCS 8004080451 | |
| Download: ML18017B017 (20) | |
Text
REGULATORY FORMATION DISTRIBUTION S
.,EM (RIDS)
ACCESSION NBRe8004080451 DOCoDATEe 80/04/02 NOTARIZED:
NO DOCKET FACIL:50-400 Shearon Harris Nuclear Power Planti Unit li Carolina 05000400 50 401 Shearon Harris Nuclear Power Plantq Unit
?~ Carolina 05000401 50 402 Shearon Harris Nuclear Power P)antg Unit 3i Carolina 05000402 AUTH ~ NAME AUTHOR AFFILIATION
+dS MCDUFFIE<M,A, Carol ina Power 8 Light Co.
RECIP ~ NAME RECIPIENT AFFILIATION LOVELACE~H ~ HE Office of Management and Program Analysis
SUBJECT:
Forwards const milestones 8 activities scheduleiupdated to 800331
~
DISTRIBUTION CODE:
8001B COPIES RECEIVED;LTR g'NCL J SIZE':
TITLE: PSAR/FSAR AMDTS and Related Correspondence ES P'9 ~
~
ee w
w oeesee w
eerayseeee ere oeee races n
ss use eeeere er seaesw eon REC IP IENT
'ID CODE/NAME ACTION:
05 PM M/AJEg BC ZugW3 INTERNAL:
+REG FILE 0
09 GEOSCIEN BR 11 MECH ENG BR 13 MATL ENG BR 16 ANAL~YSIS BR 18 AUX SYS BR 20 I:L C
SYS BR 22 AD SITE'ECH 27 EFFL TRT SYS 29 KIRKt<OOD
'D PLANT SYS AD SITE ANLYSIS HYDRO METEOR BR OELD EXTERNAl; 03 LPDR 30 ACRS.
~3
~ (~g gw COPIES L~TTR,ENCL 1
1 1
0 1
1 3
1 1
2 2
1 1
1 1
1 1
1 0
1 1
1 1
1 0
1 0
2 1
0 1
1 10 10 RECIPIENT ID CODEJNAME'D LA 4 QJg +Q 0?.
NRC PDR 08 OPERA LIIC,'R 10 QAB 12 STRUC ENG BR 15 REAC SYS BR 17 CORE PERF BR 19 CONTAIN SYS 21 POKER SYS BR 26 ACCDNT ANLYS 28 RAD ASMT BR
'D FOR ENG AD REAC SAFETY DIRECTOR NRR MPA 04 NSIC L~
Woo R~
EP/3 ~~ g~
KE 8 LCcgpg 8'gB W L.$
COPIES LTTR ENCL 0
0 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
0 1
0 1
0 1
0 1
1 St'OTAL NUMBER OF COPIES REQUIRED:
LTTR ~
ENCL 41
e I
h
'I
@ST Carolina Power & Light Company P. 0. Box 101, New Hill, N. C.
27562 April 2, 1980 Mr. William H. Lovelace, Chief Plans Branch MNBE-12117 - United States Nuclear Regulatory Commission Washington, D. C.
20555
Dear Mr. Lovelace:
In response to the Nuclear Regulatory Commission's
- request, we are submitting the schedule information on our Shearon Harris Nuclear Power Plant project updated to March 31, 1980.
The schedule dates for Units 1 through 4 are attached.
Yours very truly, M., A. McDuffie Senior Vice President Engineering
& Construction BLM/nls Attachments cc:
Mr. F. J.
Long W/A Mr. W. G. McDonald W/A Mr. C. E. Murphy W/A
)ool 58
)h ae04080 /~f
P y
~
4 l
1 y
J h
Sheet 1 of Docket No:.
Status Date ~~g PVR CONSTRUCTION MILESTONES AND ACTIVITIES FOR HARRIS UNIT 1 Schedule Dates 0
0 0
0 7730 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
X0 7155 7803 7305 7310 7205
- 0
- 7005
- 7015
- 7050
- 7060
- 7150 7805 7810 7520 7730 7815 7405 7820 7410 7415 7420 7475 7735 7425 7740 7430 7745 7435 7750 7440 7755 7155 7445 7305 7825 7455 7510 7005 7015 7050 7060 7150 7160 I-J Numbers Start 9180 5 1 81 2 1 80 3182 12 1 82 4 1 79 2181 4179 7 1 79 12 1/79 6 1 80 121 79 6/1 80 5 1 79 9 28/79 7/1/81 8/1/80 1/1/81 5/1/80 10/1/78 1 27 78 8 15 78
~Com lete 5 1 83 5 1 83 10 1 81 12 1 82 1183 12 1 82 5 1 83 10/1/82 12 1/82 12/1/82 12/1/82 4/1/83 12/1/82 4/1/83 11 1/82 4 1 83 12 1/82 4/1/83 12/1/82 4/1/83 5/1/80 3/1/82 1/1/81 8/15/81 9/1/82 11/1/82 815 78 11 1 78 Percent
~Com 1ete 24 30 100 100 100 100 100 100 Actual Com letion Date 1/24/74 10/15/74 3176 1
27 78 8 18 78 11 1 78
- Indicates x Indicates Major Milestones Change in Date TOTAL PROJECT CONSTRUCTION COMPLETION PERCENTAGE 29.4%
Sheet 2 of Docket No.
Status Date ~31-55 PWR CONSTRUCTION MILESTONES AND ACTIUITIES FOR HARRIS UNIT 1 Schedule Dates
- 7160
- 7200
- 7300
- 7450
- 7500
- 7515
- 7700
- 7800
- 7950 7524 7628 7529 7623 7459 7638 7534 7643 7080 7446 7648 754'658 7055 7056 7301 7464 7663 7090 7105 7200 7300 7450 7500 7515 7700 7800 7950 7990 7525 7630 7530 7625 7460 7640 7535 7645 7170 7540 7650 7545 7660 7056 7085 7302 7465 7665 7105 7680 I-J Numbers Start 11 1 78 12/1 79 4 1 80 6/1/82 9/1/82 10/15/82 12/1/82 4/1/83 6183 4 1 82 12 1 82 4 1 82 12 1 82 4 1 82 12 1 82 4 1 82 121 82 1181 3 1 82 12 1 82 4 1 82 12 1 82 12/1/78 1/1/81 6/1/82'/1/82 12/1/82 1/1/81 8/1/82
~Com lets 121 79 4/1/80 6/1/82 9/1/82 10/15/82 12/1/82 4/1/83 6/1/83 3 1 84 11182 5183 11182 5 1 83 11 1 82 5 1 83 11182 5183 12 1 81 11 1 82 5 1/83 11/1/82 5/1/83 1/1/81 ll/1/82 10/15/82 11/1/82 5/1 83 8/1/82 11 1/82 Percent Actual
~Com lets Com letlou Date 47
- Indicates Ma)or Milestones x Indicates Change in Date
Sheet 3 of Docket No.
Status Date 3-31-30 PVR CONSTRUCTION MILESTONES AND ACTIVITIES FOR HARRIS UNIT 1 Schedule Dates 7633 x0 7653 7351 0
7564 0
0 0
7245 7574 7025 7230 7674 7255 0
7125 0
0 0
7030 0
0 7115 7035 7235 7240 7040 7110 7505 7045
- 7111 7111 7635 7560 7655 7360 7365 7565 7280 7449 7570 7325 7575 7230 7335 7675 7340 7685 7350 7670 7315 7590 7345 7690 7115 7470 7235 7240 7355 7110 7505 7895 7111 7112 7113 I-J Numbers Start 12 1 82 4182 12 1 82 121 79 4 1/80 4/1/82
,9/1/79 4/1/80 4182 21 78 5 1 9
4179 5179 5179 1 1 81 3 1 81 2 20 78 3 1 80 6178 3 1 79 6 1 81 2178 121 78 6 1 82 4
20 78 5/1 80 9 1 79
~Com lets 5183 11 1/82 5/1/83 5/1/82 6/1/81 ll/1/82 12/1/81 9/1/81 ll 1 82 121 81 11182 5179 12 1'1 11 1 82 12 1 81 ll 1 82 12 1 81 10 15 82 5 1 81 10 15 82 9 1 81 10 15 82 3 1 80 11182 3179 6181 12 1 78 6182 5183 9 1 79 1/15/83 4 1 82 Percent Actual
'~Com lets Com 1etioc Date tl95 x Indicates Change in Date
- Corrected
I II I
Sheet 1 of Docket No;.
Status Date 3-31>>80 PWR CONSTRUCTION MILESTONES AND ACTIVITIES FOR HARRIS UNIT 2
Schedule Dates I-J Numbers Start
~Com late Percent Actual
~Com late Com letioa Date 0
0 0
0
- ** 773Q 0
0 0
0 0
0 0
- 0
- Q
- Q 0
0 0
0 0
xp 7155 7803 7305 7310 7205
- Q
- 7005
- 7015
~7050
- 7060
- 7150 7805 7810 7520 7730 7815 7405 7820 7410 7415 7420 7475 7735 7425 7740 7430 7745 7435 7750 7440 7755 7155 7445 7305 7825 7455 7510 7005 7015 7050 7060 7150 7160 8 1 2
2 1 84 4
1 2
1 83 6181 9
28 7 1 84 7 1 83 3 1 84 2183 8 1 82 1 27 78 2180 1
8 1 84 11 1 84 9
1 85 11185 ll 1 79 5180
.100 100 100 100 88 1
2
- Indicates x Indicates Ma)or milestones Change in Date
~*
Corrected TOTAL PROJECT CONSTRUCTION COMPLETION PERCENTAGE 3.7S
Sheet 2 of 3 Docket No.
Status Date 3-31-80 PWR CONSTRUCTION MILESTONES AND ACTIVITIES
~
FOR HARRIS UNIT 2 Schedule Dates
- 7160
- 7200
- 7300
- 7450
- 7500
- 7515
- 7700
- 7800
- 7950 7524 7628 7529 7623 7459 7638
- 7534 7643 7080
- 7446 7648 7544 7658 7055 7056 7301 7464 7663 7090 7105 7200 7300 7450 7500 7515 7700 7800 7950 7990 7525 7630 7530 7625 7460 7640 7535 7645 7170 7540 7650 7545 7660 7056 7085 7302 7465 7665 7105 7680 I-J Numbers Start 1181 10182 2183 6 1 85 9
1 85 10 15 85 12'1 85 41&6 6 1 86 4 1 85 121 85 4 1 85 12 1 85 4 1 85 12 1 85 4
1 85 12 1 85 3/1/83 3/1/85 12/1/85 4/1/85 12/1/85 4180 1 1 84 6/1 85 4 1 85 12 1 85 1 1 84 8/1/85
~tom late 10182 2183 6 1 85 9 1 85 10 15 85 12/1/85 4/1/86 6/1/86 3/1/87 11/1/85 5/1/86 11/1/85 5/1/86 11/1/85 5/1/86 11/1/85 5/1/86 12/1/84 11/1/85 5 1 86 85 ll/1/85 10/15/85 11/1/85 5/1/86 8/1/85 11/1/85 Percent Actual
~tom lete Com letioa Date
- Indicates Ma)or Milestones x Indicates Change
- Corrected in Date
Sheet 3 of Docket No.
Status Date~~
PL% CONSTRUCTION MILESTONES AND ACTIVITIES FOR HARRIS UNIT 2
Schedule Dates I-J Numbers start
~Com lets Percent
~Com lets Actual Com letion Date 7633 x0 7653 7351 0
7564 0
x0 0
7245 7574 x7025 7230 7674 7255 0
7125 0
0 0
7030 0
0 7115 7035 7235 7240 7040 7110 7505 7045 7111 7635 7560 7655 7360 7365 7565 7280 7449 7570 7325 7575 7230 7335 7675 7340 7685 7350 7670 7315 7590 7345 7690 7115 7470 7235 7240 7355 7110 7505 7895 7111 7112 12 1
8 5
1 82 2 1 83 4185 12 1 81 8182 4 1 85 7 14 78 8 1 82 4185 8 1 82 8 1 82 2 1 84 3
1 84 3
8 2
78 121 8
6 1 82 4
20 78 5
1 80 1
6 11185 5186 5 1 85 6 1 84 11 1 85 12 1 84 9 1 81 ll 1 85 12 1 84 11185 8182 12 1 84 ll 1 85 12 1 84 11 1 85 12/1 84 10/1/85 6 1/84 10/1/85 10 1 85 3 1 80 2
1 8
6 1 82 5 1 83 1 80 1 15 83 14'4 x Indicates Change in Date
Sheet 1 of Docket No.;
Status Date 3-31-80 PWR CONSTRUCTION MILESTONES AND ACTIVITIES FOR HARRIS UNIT 3 Schedule Dates 0
0 0
- 773Q 0
- Q 0
0 0
0 0
- SS0
- Q
- 0 0
0 0
0 0
- AP 7155 7803 7305 7310 7205
- Q
- 7005
~7015
- 7050
- 7060
- 7150 7805 7810 7520 7730 7815 7405 7820 7410 7415 7420 7475 7735 7425 7740 7430 7745 7435 7750 7440 7755 7155 7445 7305 7825 7455 7510 7005 7015 7050 7060 7150 7160 I-J Numbers Stare 7 1 87 2186 12 1 89 2 1 86 2 1 88 7186 2 1 86 12 1 86 6187 6180 1 1 88 7185 7/1 88 7/1/87 3/1/88 2/1/87 12/1/85 1 27 78 7 1 83
~Com late 5 1 90 5190 10 187 I//19 0 10 1 88 12 1 89 121 89 121 89 4 1 90 12189 4 1 90 121 89 4 1 90 12189 4 1 90 121 89 4 1 90 7186 3189 3188 9/1/89 9/1/89 11/1/89 5/1 83 10183 100 100 100 100 1 21/74 10/15/74 3/1/76 1/27/78 Percent Actual
~Com late Com letloo Date
- Indicates Ma/or Ywlestones x Indicates Change in Date
- Corrected TOTAL PROJECT CONSTRUCTION COMPLETION PERCENTAGE Less than lS
Sheet 2 of 3 Docket No.
Status Date 3-31-80 PWR CONSTRUCTION MILESTONES AND ACTIVITIES FOR HARRIS UNIT 3 Schedule Dates
- 7160
- 7200
%7300
- 7450
- 7500
- 7515
- 7700
- 7800
- 7950 7524 7628 7529 7623 7459 7638
- %7534 7643 7080 7446 7648 7544 7658 7055 7056 7301 7464 7663 7090 7105 7200 7300 7450 7500 7515 7700 7800 7950 7990 7525 7630 7530 7625 7460 7640 7535 7645 7170 7540 7650 7545 7660 7056 7085 7302 7465 7665 7105 7680 I-J Numbers Start 10 1 83 10 1 86 2187 6 1 89 9 1/89 10/15/89 12/1/89 4/1/90 6/1/90 4/1/89 12/1/89 4/1/89 12/1/89 4/1/89 12/1/89 4/1/89 12/1/89 7/1/87 3/1/89 12/1 89 4 1 89 121 89 10 183 1188 6/1/89 4/1/89 12/1/89 1/1/88 8/1/89
~Com late 10 1 86 2/1/87 6/1/89 9/1/89 10/15/89 12/1/89 4/1/90 6/1/90 3/1/91 11/1/89 5/1/90 ll/1/89 5/1 90 11/1/89 5/1/90 11/1/89 5/1/90 12/1/88 11 1 89 5 1 90 5/1/90 1/1/88 11/1/89 10/15/89 11/1/89 5/1/90 8/1/89 il/1/89 Percent Actual
~Com late Com letion Date
- Indicates Ma)or Milestones x Indicates Change
- Corrected in Date
Shee t 3 of Dooket No.
Status Date ~l-Sp PER CONSTRUCTION MILESTONES AND ACTIVITIES FOR HARRIS UNIT 3 Schedule Dates
~ I-J Numbers 7633 7635 gO 7560 7653 g 7655
- 7351 7360 0
7365 7564 7565 0
7280 xO 7449 0
7570 7245 7325 7574 7575 7025 7230 7230 7335 7674 7675 7255 7340 0
7685 7125 7350 0
7670 0
7315 0
7590 7030 7345 0
7690 0
7115 7115 7470 7035 7235 7235 7240 7240 7355 7040 7110 7110 7505 7505
'7895 7045 7111 7111 7112 Start 12 1
218 418 1218 1
6 4
1 1
1 82 8 1 86 4189 8 1 86 8 1 86 2188 3 1 88 220 78 3 1 80 10185 4 1 88 2178 121 78 6182 4
20 78 5 1 80
~Com lets 6
1 11 8
1 1
8 8 1 86 121 88 11 1 89 12 1 88 11 1 89 12 1 88 10 1 89 6 1 88
~10 1'9 9 1 88 10 1 89 3 1 80 11 1 82 12 1 86 4 1 88 12189 121 78 6 1 82 5188 5 1 80 1 15 83 Percent Actual
" ~Com lets
'Com letlou Date x Indicates Change in Date
- Corrected
f I
Sheet 1 of Docket No..
Status Date ~1-s PVR CONSTRUCTION MILESTONES AND ACTIVITIES FOR HARRIS UNIT 4 Schedule Dates I-J Numbers Start
~Com lets Percent Actual C~m lete Com letioo Date 0
0 0
0
- 773Q 0
- Q
, 0 0
0 0
0
- p
- p
<<*0 0
0 0
0 0
0 71t 5 7803 7305 7310 7205
- Q
- 7005
- 7015
- 7050
- 7060
- 7150 7805 7810 7520 7730 7815 7405 7820 7410 7415 7420 7475 7735 7425 7740 7430 7745 7435 7750 7440 7755 7155 7445 7305 7825 7455 7510 7005 7015 7050 7060 7150 7160 7/1/85 2186 12 1 87 2 1 84
'21 86 7184 2184 8 1 84 6 1 85 6 1 80 1 1 86 7 1 85 7186 7 1 85 3/1/86 2/1/85 12/1/83 1/27/78 5/1/82 5/1/88 5/1/88 10 1 87 1188 12 1 87 5 1 88 10 1 86 12 1 87 12 1 87 12 1 87 4 1 88 121 87 4 1 88 12 1 87 4 1 88 12 1 87 4 1 88 12 1 87 4 1 88 7186 3187 3186 9/1/87 9 1 87 11/1 87 5/1/82 8/1/82 100 100 100 100 1 21/74 10/15/74 3/1 77 1/27/78
- Indicates x Indicates Major Milestones Change in Date
- Corrected TOTAL PROJECT CONSTRUCTION COMPLETION PERCENTAGE Less than lS
Sheet 2 of 3 Docket Ho.
Status Date 3-31-80 PWR CONSTRUCTION MILESTONES AND ACTIVITIES FOR HARRIS UNIT 4 Schedule Dates
- 7160
- 7200
- 7300
- 7450
- 7500
- 7515
- 7700
- 7800
- 7950 7524 7628 7529 7623 7459 7638 7534 7643 7080 7446 7648 7544 7658 7055 7056 7301 7464 7663 7090 7105 7200 7300 7450 7500 7515 7700 7800 7950 7990 7525 7630 7530 7625 7460 7640 7535 7645 7170 7540 7650 7545 7660 7056 7085 7302 7465 7665 7105 7680 I-J Numbers Start 8182 10 1 84 2185 6 1 87 9187 10 15 87 12/1 87 4/1/88 6/1/88 4/1/87 12/1/87 4/1/87 12/1/87 4/1/87 12/1 87 4/1/87 12/1/87 7/1/85 3/1 87 12 1/87 4187 12 1 87 8 1 82 1/1/86 6/1/87 4/1/87 12/1/87 1/1/86 8/1/87
~Com lete 10 1 84 2 1 85 6 1 87 9/1/87 10/15/87 12/1/87 4/1/88 6/1/88 3/1/89 11/1/87 5 1/88 11/1 87 5 1 88 ll 1 87 5
88 ll 87 5188 12 1 86 1
8 5
88 11 1 87 5/1/88 1/1/86 11/1/87 10/15/87 11/1/87 5/1/88 8/1/87 11/1/87 Percent Actual
~Com lete Com letloo Dote
- Indicates Ma)or Milestones x Indicates Change in Date
Sheet 3 of Docket No.
Status Date 3-31-00 PhR CONSTRUCTION MILESTONES AND ACTIVITIES FOR HARRIS UNIT 4
Schedule Dates 7633 x0 7653
- 7351
+*0 7564 0
x0 0
7245 7574 7025 7230 7674 7255 0
7125 0
0 0
7030 0
0
- 7115 7035 7235 7240 7040 7110 7505 7045 7111 7635 7560 7655 7360 7365 7565 7280 7449 7570 7325 7575 7230 7335 7675 7340 7685 7350 7670 7315 7590 7345 7690 7115 7470 7235 7240 7355 7110 7505 7895 7111 7112 I-J Numbers State 121 7
4 1 87 12 1 87 5184 2 1 85 4187 12 1 83 4
1 80 8 1 84 4 1 87 1 1 81 8184 4 1 87 8 1 84 8 1 84 2 1 86 3 1 86 2 20 78 3180 10183 12 1 84 4 1 86 2178 121 78 6 1 82 4/20/78 5/1/80
~Com late 5188 11 1 87 5188 5 1 87 6 1 86 11 1 87 12 1 86 9 1 81 11 1 87 12 1 86 ll 1 87 8184 12 1 86 11 1 87 12/1/86 11/1 87 12/1/86 10/1/87 6/1/86 10/1/87 9/1/86 10/1/87 3180 11 1 82 121 84 4 1 86 I /
12/1/78 6/1/82 5/1/88 5/1/80 1/15 83 Percent Actual
~Com late Com letiou Date 33 i74 x Indicates Change in Date
- Corrected
tI I!
i~/'
~
ll n
I Cp t>>
~ 5 k
II
'i'-