Category:NON-RECURRING TECHNICAL REPORT (ENVIRONMENTAL)
MONTHYEARML19340A3831980-03-20020 March 1980 Main Dam Spillway Features 1,2 & Faults F4,A6,C2,F5,G,G2, G3,H & I ML18017A9971979-09-30030 September 1979 Environ Analysis for Wake-Richmond 500 Kv Line,Harris- Harnett Section:Alternate Route Evaluation Rept. ML18017A9951979-07-31031 July 1979 Environ Analysis for Harris-Harnett 500 Kv Transmission Line Route Selection. ML18017B9331978-01-31031 January 1978 Archeological Survey & Evaluation of Shearon Harris Nuclear Power Plant Cooling Lake Reservoir. ML18017B6091977-09-19019 September 1977 Cape Fear Steam Electric Generating Plant 316(b) Demonstration. 1980-03-20
[Table view] Category:TEXT-ENVIRONMENTAL REPORTS
MONTHYEARML18016A8211998-12-31031 December 1998 Number of Personnel & Man-Rem by Work & Job Functions, 1998,Harris Plant. with 990218 Ltr ML18016A9271998-12-31031 December 1998 1998 Annual Radiological Environ Operating Rept for Harris Nuclear Plant. with 990428 Ltr ML18016A9291998-12-31031 December 1998 Shnpp Unit 1 Annual Environ (Nonradiological) Operating Rept for Jan-Dec 1998. with 990428 Ltr ML18016A9331998-12-31031 December 1998 Annual Radioactive Effluent Release Rept for Jan-Dec 1998. ML18016B0191998-12-31031 December 1998 Corrected Pages to Annual Radioactive Effluent Release Rept, for 1998 for HNP ML18016A3301997-12-31031 December 1997 1997 Annual Operating Rept of Individuals Receiving Exposures Greater than 100Mr/Yr. W/980226 Ltr ML18016A4071997-12-31031 December 1997 Annual Environ (Nonradiological) Operating Rept,App B for 970101-1231. W/980427 Ltr ML18016A4081997-12-31031 December 1997 Radiological Environ Operating Rept for 1997. W/980428 Ltr ML18016A4121997-12-31031 December 1997 Annual Radioactive Effluent Release Rept for Jan-Dec 1997. ML18022B0141996-12-31031 December 1996 Annual Radioactive Effluent Release Rept 960101-1231. W/970414 Ltr ML18012A5401996-12-31031 December 1996 Numbers of Personnel & Man-Rem by Work & Job Function,1996 Harris Plant. W/970227 Ltr ML18012A6381996-12-31031 December 1996 Annual Environ (Non-Radiological) Operating Rept,App B for 960101-1231. W/970428 Ltr ML18012A7541996-12-31031 December 1996 Radiological Environ Operating Rept for Shearon Harris Nuclear Power Plant,Jan-Dec 1996. ML18012A7771996-12-31031 December 1996 Annual Radiological Environ Operating Rept for 1996. W/ 970428 Ltr ML18012A4201996-11-11011 November 1996 NPDES Noncompliance Notification:On 960930,exceeded Daily Max Limit & Monthly Average Limit of BOD5 During Reporting Period.Caused by Reduction in Chlorine Contact Time.Reviewed Operational Procedures ML18012A4281996-10-31031 October 1996 NPDES Discharge Monitoring Rept for Oct 1996 for Perry Nuclear Power Plant. W/961115 Ltr ML18012A1931996-03-29029 March 1996 NPDES Noncompliance Notification:On 960326 Internal Audit Identified Concern W/Sampling Frequency for Fecal Coliform at Heec Outfall.Investigation in Progress & Upon Completion Results Will Be Communicated ML18012A1471995-12-31031 December 1995 Number of Personnel & Man-Rem by Work & Job Function,1995. W/960221 Ltr ML18012A2401995-12-31031 December 1995 Annual Environ (Nonradiological) Operating Rept,App B for Jan-Dec 1995. W/960430 Ltr ML18012A2391995-12-31031 December 1995 Annual Radioactive Effluent Release Rept Jan-Dec 1995. W/ 960430 Ltr ML18012A2341995-12-31031 December 1995 1995 Annual Radiological Environ Operating Rept,Vols I- Iii. W/960429 Ltr ML18011B0251995-09-13013 September 1995 NPDES Noncompliance Notification:On 950908,discovered Zinc Concentrations of Approx 3 Ppm in Cooling Tower Blowdown Discharge.Caused by Decrease in Ph of Cooling Tower Water. Cause of Ph Change Being Investigated ML18022A9601994-12-31031 December 1994 Annual Environ (Nonradiological) Operating Rept for Jan -Dec 1994. W/ 950421 Ltr ML18022A9541994-12-31031 December 1994 Radiological Environ Operating Rept, Vols I,Ii & Iii.W/ 950421 Ltr ML18011B0801994-12-31031 December 1994 Revised Semi-Annual Effluent Release Rept for Period of Jul-Dec 1994. ML18011A8021994-12-31031 December 1994 Semiannual Radioactive Release Rept Jul-Dec 1994. ML18011A7961994-12-31031 December 1994 Annual Operating Rept, Consisting of Info Re Number of Individuals Receiving Exposures Greater than 100 Mrem/Yr, Primary Coolant Iodine Spikes & Challenges to PORVs & Safety Valves for 1994.W/950223 Ltr ML18011A5571994-06-30030 June 1994 Semiannual Radioactive Effluent Release Rept for Jan-June 1994. ML18011A3571993-12-31031 December 1993 Annual Operating Rept for 1993, Including Number of Personnel & man-rem by Work & Job Function,Primary Coolant Iodine Spikes & Primary Relief & Safety Valve challenges.W/940225 Ltr ML18011A3591993-12-31031 December 1993 Semiannual Radioactive Effluent Release Rept Jul-Dec 1993. W/940228 Ltr ML18011A4041993-12-31031 December 1993 Vols 1,2 & 3 of Radiological Environ Operating Rept 1993. ML18011A4241993-12-31031 December 1993 Shnpp Unit 1 Annual Environ (Nonradiological) Operating Rept,App B,Jan-Dec 1993. W/940428 Ltr ML18011A1171993-06-30030 June 1993 Semiannual Radioactive Effluent Release Rept Jan-June 1993. ML18010B0831992-12-31031 December 1992 Radiological Environ Operating Rept,1992 for Shearon Harris Nuclear Power Plant. W/930429 Ltr ML18010B0821992-12-31031 December 1992 Annual Environ (Non-Radiological) Operating Rept. W/930430 Ltr ML18010B0601992-12-31031 December 1992 1992 Statistical Summary Rept for Shearon Harris Nuclear Power Plant,Unit 1, Per 10CFR20.407.W/930312 Ltr ML18010B0181992-12-31031 December 1992 Semiannual Radioactive Effluent Release Rept,Jul-Dec 1992. W/930224 Ltr ML18010A7291992-06-30030 June 1992 Semiannual Radioactive Effluent Release Rept,Jan-June 1992. W/920827 Ltr ML18010A5491991-12-31031 December 1991 Personnel & Man-Rem by Work & Job Function for 1991. W/ 920224 Ltr ML18010A6301991-12-31031 December 1991 Amended Shearon Harris Annual Operating Rept for 1991. ML18010A6111991-12-31031 December 1991 Radiological Environ Operating Rept 1991,Harris Nuclear Project. ML18010A5341991-12-31031 December 1991 Annual Personnel Monitoring Rept for Shearon Harris Nuclear Power Plant for 1991. W/920218 Ltr ML18010A6141991-12-31031 December 1991 Radiological Environ Operating Rept,Vol III,Jul-Dec 1991 Sample Analyses Data. ML18010A6151991-12-31031 December 1991 Annual Environ (Nonradiological) Operating Rept,1991. W/920424 Ltr ML18010A5451991-12-31031 December 1991 Semiannual Radioactive Effluent Release Rept for Jul-Dec 1991. ML18010A3731991-06-30030 June 1991 Semiannual Radioactive Effluent Release Rept,Jan-June 1991. W/910830 Ltr ML18010A6131991-06-30030 June 1991 Radiological Environ Operating Rept,Vol II,Jan-June 1991, Sample Analyses Data. ML18009A8811991-04-29029 April 1991 NPDES Noncompliance Notification:On 910310,bldg Sewage Collection Tank Pump Discovered to Be de-energized During Electrical Bus Outage.Caused by Inoperable Pump.Personnel to Refrain from Using Rest Rooms Until Power Restored ML18009A8751990-12-31031 December 1990 Annual Environ (Nonradiological) Operating Rept for 1990. W/910422 Ltr ML18009A8221990-12-31031 December 1990 Semiannual Radioactive Release Rept,Jul-Dec 1990. W/910227 Ltr 1998-12-31
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML18017A9181999-10-0808 October 1999 LER 99-008-00:on 991008,CR Emergency Filtration Sys Tech Specs Occurred.Caused by Site Personnel Failed to Recognize That Blocking Open CR Emergency Filtration Sys.Procedures Revised.With 991008 Ltr ML18017A9151999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Shearon Harris Npp. with 991012 Ltr ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML18017A8671999-09-10010 September 1999 LER 99-007-00:on 990811,determined That Cvis ARMs High Alarm Setpoints Were Not within TS Limit.Caused by Not Having Procedure to Verify If Cvis ARM High Alarm Setpoints Were within TS Requirements.Revised Procedures.With 990910 Ltr ML18017A8621999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Harris Nuclear Plant.With 990908 Ltr ML18016B0481999-08-0404 August 1999 LER 99-006-01:on 981124,noted Failure to Comply with TS 4.0.4 & TS 3/4.6.3, Civs. Caused by post-maint Testing That Did Not Adequately Test Control Circuitry & Verify Isolation Time Following Maint.Procedure Was Revised ML18017A8361999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Shearon Harris Nuclear Power Plant.With 990811 Ltr ML18016B0151999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Shearon Harris Npp. with 990713 Ltr ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML18016A9801999-06-0404 June 1999 LER 99-006-00:on 981124,failed to Comply with TS 4.0.4 & TS 3/4.6.3, Civ. Caused by post-maint Testing That Did Not Adequately Test Control Circuitry & Verify Isolation Time Following Maint.Procedure Will Be Revised.With 990604 Ltr ML18016A9851999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Shearon Harris Nuclear Plant,Unit 1.With 990614 Ltr ML18017A8981999-05-12012 May 1999 Technical Rept Entitled, Harris Nuclear Plant-Bacteria Detection in Water from C&D Spent Fuel Pool Cooling Lines. ML18016A9581999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Shearon Harris Nuclear Plant,Unit 1.With 990513 Ltr ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML18016A9111999-04-12012 April 1999 LER 99-005-00:on 990313,plant Exceeded ESFAS TS 3.3.2,Action 21.Caused by Inadequate Procedure Rev Preparation.Licensee Revised Applicable Maint Surveillance Test Procedure (MST-10072) to Identify TS Required Actions.With 990412 Ltr ML18016A8971999-04-0808 April 1999 LER 99-004-00:on 990312,unit Trip Was Noted.Caused by Degraded Condition of SG Water Level Flow Control Valve. Replaced Positioners on All Three FW Regulating Valves.With 990408 Ltr ML18016A8941999-04-0505 April 1999 Revised Pages 20-25 to App 4A of non-proprietary Version of Rev 3 to HI-971760 ML18016A9101999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Shearon Harris Nuclear Power Plant.With 990413 Ltr ML18016A8661999-03-31031 March 1999 Shnpp Operator Training Simulator,Simulator Certification Quadrennial Rept. ML18017A8931999-02-28028 February 1999 Risks & Alternative Options Associated with Spent Fuel Storage at Shearon Harris Nuclear Power Plant. ML18016A8551999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Shearon Harris Npp. with 990312 Ltr ML18016A8261999-02-22022 February 1999 LER 99-003-00:on 990123,noted That Plant Was Outside Design Basis Due to Isolation of Fire Protection Containment Sprinkler Sys.Caused by Human Error.Restored Containment Sprinkler Sys to Operable Status.With 990222 Ltr ML18016A8531999-02-18018 February 1999 Non-proprietary Rev 3 to HI-971760, Licensing Rept for Expanding Storage Capacity in Harris SFP 'C' & 'D'. ML18016A8111999-02-12012 February 1999 LER 99-002-00:on 990114,RT Due to Not Removing Temporary Device from Relay Following Calibration Was Noted.Caused by Human Error.Counseled Personnel Involved in Event.With 990212 Ltr ML18016A7971999-02-0505 February 1999 LER 99-001-00:on 990106,SF Pool Water Level Was Not Maintained Greater than 23 Feet Above Stored BWR Fuel Assemblies.Caused by Fasteners Bending Under Specific Circumstances.Increased Water Level.With 990205 Ltr ML18022B0631999-02-0404 February 1999 Rev 0 to Nuclear NDE Manual. with 28 Oversize Uncodable Drawings of Alternative Plan Scope & 4 Oversize Codable Drawings ML20202J1161999-02-0101 February 1999 SER Accepting Relief Requests Associated with Second 10-year Interval Inservice Testing Program ML18016A8041999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Shearon Harris Nuclear Power Plant.With 990211 Ltr ML18016A7941999-01-29029 January 1999 LER 98-004-01:on 980313,identified Design Deficiency Re Potential Runout of Tdafwp.Caused by Inadequate Original AFW Sys Design.Operability Evaluation Was Completed on 980313 & Addl Engineering Analysis Was Performed by Vendor ML18016A7801998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Shearon Harris Npp. with 990113 Ltr ML18016A7671998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Shnpp,Unit 1.With 981215 Ltr ML18016A9731998-11-28028 November 1998 Changes,Tests & Experiments, for Harris Nuclear Plant.Rept Provides Brief Description of Changes to Facility & Summary & of SE for Each Item That Was Implemented Under 10CFR50.59 Between 970608-981128.With 990527 Ltr ML18016A8351998-11-28028 November 1998 ISI Summary 8th Refueling Outage for Shearon Harris Power Plant,Unit 1. ML18016A7411998-11-25025 November 1998 Rev 1 to Shnpp Cycle 9 Colr. ML18016A7211998-11-17017 November 1998 LER 98-007-00:on 981023,turbine Control Anomaly Caused Manual Rt.Caused by Failure to Incorporate Verbal Vendor Guidance in Operating Procedures.Addl Vendor Guidance Will Be Verified & Added to Procedures.With 981117 Ltr ML18016A7071998-11-0303 November 1998 Rev 0 to Harris Unit 1 Cycle 9 Colr. ML18016A7201998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Shearon Harris Nuclear Power Plant.With 981113 Ltr ML20154F8701998-10-0606 October 1998 Safety Evaluation Authorizing Proposed Alternative to Requirements of OMa-1988,Part 10,Section 4.2.2.3 for 21 Category a Reactor Coolant Sys Pressure Isolation Valves ML18016A6201998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Harris Nuclear Power Plant.With 981012 Ltr ML18016A5971998-09-21021 September 1998 Rev 1 to Harris Unit 1 Cycle 8 Colr. ML18016A5881998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Shnpp,Unit 1.With 980914 Ltr ML18016A5071998-07-31031 July 1998 Monthly Operating Rept for Jul 1998 for Shearon Harris Nuclear Plant.W/980811 Ltr ML18016A9431998-07-0707 July 1998 Rev 1 to QAP Manual. ML18016A4841998-07-0707 July 1998 LER 97-002-01:on 970207,determined That Cold Weather Conditions Resulted in Mfiv Being Potentially Inoperable During Period 970117-20.Caused by Inadequate Design of HVAC Sys.Implemented Mods to Steam Tunnel HVAC Sys ML18016A9371998-06-30030 June 1998 Technical Rept on Matl Identification of Spent Fuel Piping Welds at Hnp. ML18016A4861998-06-30030 June 1998 Monthly Operating Rept for June 1998 for SHNPP.W/980715 Ltr ML18016A4701998-06-30030 June 1998 LER 97-021-03:on 980210,discovered That SFP Water Level Had Not Been Verified Greater than 23 Feet Above BWR Fuel Assemblies.Caused by Misinterpretation of TS Requirements. Will Submit TS Change Request to Revise TS 3.9.1.11 ML18016A4491998-06-0808 June 1998 LER 98-006-00:on 980508,failure to Perform Insp & Preventive Maint on MCCB as Required by TS Was Noted.Caused by Inadequate Sps.Tested 9 Pressurizer Heater Bank Breakers by Cycling each.W/980608 Ltr ML18016A4521998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Shearon Harris Nuclear Power Plant.W/980612 Ltr ML18016A7711998-05-26026 May 1998 Non-proprietary Rev 2 to HI-971760, Licensing Rept for Expanding Storage Capacity in Harris Spent Fuel Pools 'C' & 'D'. 1999-09-30
[Table view] |