REGUL'ATOR NFORMATION DISTRIBUTION S TEM (RIDS)

ACCESSION NBR o 80032 1 05 1 3 DOC ~ DATE ~ 80/03/18 NOTARIZED NO FACIL:50 400 Shear on Harris Nuclear Power Plant~ Unit ir Carolina 50 401 Shear on Herr is Nuclear Power Pl anti Vni t 2g Carol ina 50 402 Shearon Herr is Nuclear Po~er Planti Unit 3i Carolina AUTH BYNAME AUTHOR AFFILIATION MCDUFFIE~M,A.

Caro)fna Power 8 Light Co.

RECIP ~ NAME RECIPIENT AFFILIATION DENTONgH ~ RE Office of Nuclear Reactor Regulation

SUBJECT:

Advises that util is proceeding w/implementation of'se of AIF 791004 position pape'r for procurement ofi off the shelf items.Procedures were clarified at 800118 meeting w/NRC AIF"- in washington<DC, DISTRIBUTION CODEt B001B COPIES RECEIVED:LTR ENCL SIZEs TITLE: PSAR/FSAR AMDTS and Related Correspondence DOCKET 0500040 0500040 0500040'

<S'+ weaw~eeeeww~eeeaoawwwm~mwwmeeeeee~~~wes~w~wweoaewham~aeoemarereeoreeemmmwmwmwmeemae~a ACTION!

INTERNAL:

,RECIPIENT COPIES ID CODE/NAME LTTR ENC 05 PM ~V ~

1 REG 1

0 I

E 3

09 GEOSC IEN BR 4

11 MECH ENG BR 1

13 MATLi ENG BR

?

16 ANALYSIS BR 1

18 AUX SYS BR 1

20 I 8

C SYS BR 1

22 AD SITE TECH 1

27 EFFL, TRT SYS 1

29 KIRKNOOD 1

AD PLANT SYS 1

AD SITE'NLiYSIS 1

HYDRO METEOR BR OELD 1

RECIPIENT L

ID CODE/NAME AD LA b- ~~~ ~

02 NRC PDR 08 OPERA LIC BR 10 QAB 12 STRUC ENG BR 15'REAC SYS BR 17 CORE PERF" BR 19 CONTAIN SYS 21 POWER SYS BR 26 ACCDNT ANLYS 28 RAD ASMT BR AD FOR ENG AD REAC SAFETY DIRECTOR NRR MPA I

COPIES LTTR ENCL EXTERNAL: 03 LPDR 30 ACRS 1.

10 1

04 NSIC

'o TOTAL NUMBER OF COPIES REQUIRED:

LTTR ~ ENCL

0 1

8

,Oc,

~ ~

p e, )g~

gled g

+D

'0 g S~g~f "oS>

~ ~SF"g><

~"E a,.'P Q 6

=g

~Oit.

o 4M Wl>>

Carolina Power 8 Light Company March 18, 1980 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D.C.

20555 SHEARON HARRIS NUCLEAR POWER PLANT, UNIQ~S. 1, 2, 3, AND 4 DOCKET NOS. 50-400, 50-401, 50-&R, AND 50-403 PROCUREMENT OF "OFF-THE-SHELF" ITEMS

Dear Mr. Denton:

Our November 6, 1979, letter to you on the subject matter had indicated that the Carolina Power

& Light Company (CP&L) desires to use the position paper (procurement of "off-the-shelf" replacement/spare parts dated 10-4-79) developed by the Atomic Industrial Forum (AIF) Committee on Power Plant Design, Construction and Operation, for the procurement of "off-the-shelf" items, and requested NRC's concurrence for the use of this position paper prior to its implementation on the Shearon Harris Nuclear Power Plant project.

On January 18,

1980, a meeting was held 'in Washington, D.C. between the NRC (represented by Messrs.

W. P. Haass, J. Gilray, F. J. Liederbach, J. Spraul, E. J.

Brown, G. F. Guppy), the AIF (represented by Messrs.

S. Sparacino and G. L. Hefter) and CP&L (represented by Messrs.

N. J. Chiangi, S.

R.

Zimmerman, and K. V. Hate') to further discuss CP&L's request to use the AIF position paper.

During the meeting, CP&L explained that procedures would be available to implement'he "off-the-shelf". procurement program.

These procedures would require the Engineer responsible for the procurement to determine, based on specific guidance contained in the procedures, whether an item could be classified as "off-the-shelf" and the level of controls that should be applied to the item depending on its importance to nuclear safety.

With this clarification, it is our understanding that the NRC is in general concurrence with our approach of applying the AIF position paper for the procurement of "off-the-shelf" items and hence at this time we will proceed with its implementation.

Thank you for your consideration in this matter.

Yours very truly, M. A. McDuffie Senior Vice President Engineering

& Construction NJC/tl cc:

Messrs.

V. Stello J.

P. O'Reilly

+cP i6 411 Fayettevilte Street o P. O. Box 1551 o Raleigh, N. C. 27602 8003210 G ~"8

~ 5 E