ML18017A977
| ML18017A977 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 10/22/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Jackie Jones CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML18017A974 | List: |
| References | |
| NUDOCS 8003210307 | |
| Download: ML18017A977 (3) | |
See also: IR 05000400/1979019
Text
l
~R REOI
/
"I
0O
IVi
Cy
V/+n
~O
++*++
In Reply Refer To:
RII:JRH
50-400/79-19
50-401/79-19
50-402/79-18
50"403/79-18
UNITEDSTATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTAST., N.W., SUITE 3100
ATLANTA,GEORGIA 30303
OCT 22 1S79
Carolina Power and I,ight Company
ATTN:
Mr. J. A. Jones
Executive Vice President
and
Chief Operating Officer
411 Fayetteville Street
Raleigh,
NC
27602
Gentlemen:
This refers
to the
inspection
conducted
by J.
R. Harris of this office on
September
18-21,
1979, of activities authorized
by NRC Construction Permit Nos.
CPPR-158,
CPPR-159,
CPPR-160,
and
CPPR-161 for the Shearon Harris facility, and
to the discussion
of our findings held with R.
M. Parsons
at the conclusion of
the inspection.
Areas
examined
during the inspection
and
our findings
are
discussed
in the
enclosed
inspection
report.
Within these
areas,
the inspection
consisted
of
selective
examinations
of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
We have
examined
actions
you have
taken with regard to previously identified
enforcement matters
and unresolved
items.
The status of these items is discussed
in the enclosed report.
During the inspection, it was
found that certain activities under your license
appear
to be in noncompliance
with NRC requirements.
This'item and references
to pertinent requirements
are listed in the Notice of Violation enclosed herewith
as Appendix A.
This notice is sent to you pursuant to the provisions of Section
2.201 of the NRC's "Rules of Practice," Part 2, Title 10,
Code of Federal Regula-
tions.
Section 2.201 requires
you to submit to this office, within 20 days of
your receipt of this notice,
a written statement or explanation in reply including:
(1) corrective steps
which have been taken by you and the results
achieved;
(2)
corrective steps
which will be taken to avoid further noncompliance;
and (3) the
date when full compliance will be achieved.
In accordance
with Section 2.790 of the NRC's "Rules of Practice," Part 2, Title
10, Code of Federal Regulations,
a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary
that you make
a written application within 20 days to this office to
withhold such
information from public disclosure.
Any such application
must
include a full statement of the reasons
on the basis of which it is claimed that
Cg
Carolina Power and Light Company
"2-
OCT 22 1S79
the
information is proprietary,
and
should
be
prepared
so that proprietary
information identified in the application is contained in a separate
part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
Should you have
any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
C. E.
Mu
,
hief
Reactor Construction
and Engineering
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-400/79-19,
50-401/79-19,
50-402/79-18,
and 50-403/79-18
cc w/encl:
R. Parsons,
Site Manager
P. 0.
Box 10l
New Hill, NC
27562
0