Informs That Sampling Station Was Incorrectly Designated in Const Phase Environ Monitoring Program.Corrected Program Encl
ML18017A793
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 01/28/1980
From: Mcduffie M
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8002040550
Download: ML18017A793 (11)


Text

ACCESSION NUR l ACYL!50 400 50 401 50-402 AUTHeNAMV MCoof'F'IE,MD A AECIP,NAME OEAfUAgH~ R.

HEGyLAIOHy I HMATION OISTHI8UTION SyS (Rro

8002040550 DOCS DATE: 80/01/28 NOTARIZED! ND Shearon Harris Nuclear Power Plant~

Onit ii Caiol Shearon Harris Nuclear Power Planti On'it 2i carol Shearon Harris Nuclear Power Plantr On'it 3i Carol AUTHOR AFFILIATION Carolina Power L Light Co.

DECI f'IENT AFFILIATION Office of Nuclear Aeactol Regulation S) ina

'ina

'I na DOCKET 05000400 05000401 05000402 SUUJECT; Informs that sampling station was incorrectly designated in const phase environ monitoring program,Correcterd program

encl, DIS I'H18UTION CODE:

C0028 COPIES I<ECE;IVEO;LTR ~ ENCL I

SllE':

nviron.

omments, f-9 ~

~ MW~SVWWWWMWWMWSVMW~WWWW~WWWWM~WSMWIWWMMWMWWIAWe%%teWWMW~MMWWOH MHNWpOMWW~~OW ACTION!

REC IP IEN1 copIEs IO CODE/NAME LTTH ENCI 05 PH mWac.os~ c

-1 18 LA~WW~~

I 1

1 RECIPIENT ID CUOE/NAME 17 BC'w~~ ~

Ao W,cpu~~

COPIES Lf'TA" E,NCL ii INTFRNAL; EX I EHNAI.;

0 REG FILE 0

10 CST 8NF1 ANL i2 t'*EOSCIEA Brf 14 ACDEN1'NACY 16 RAD ASM'h AO EAvIAON TECH DELD 03 LPDH 20 NATL LA8 NP/U~

1 1

2 2

i i

i i

i i

ii 0

i 0

1 1

5 5

02 NRC PDR 09 ENON SPEC 8R 1i rA/EUO i3 FIYOftO~METEOH iS EFLT TRY SYS 19 DIP USE A0 SITE AAaLY 04 NSIC ACRS 1

1i i

ii i

i 1

0 1

1 i

0

'.~~

MCCrM~ W

, Wreak~

8.4o"W ~M ds~

3z-TUTAI. NUMBER DF COPIE,S REQUIRED:

L1TH ~

ENCL 23 84~goL.'

0 o

lt 1

h 1 '

il 1

N ',

P H

E a

t E

J

'll

'( ~

ll

Carolina Power & Light Company January 28, 1980 Mr. Harold R..Denton, Director Office of Nuclear Reactor Regulations United States'ucl'ear Regulatory Commission Washington, D.C.'0555 SHEARON HARRIS NUCLEAR POWER =PLANT UNITS

= NOS 1 j 2 >

~ 3 ~

AND 4 DOCKET NOS ~ 50 400 ~ 50 401 > 50 402 j AND 50 403 CONSTRUCTION 'PHASE 'ENVIRONMENTAL"MONITORING'PROGRAM '

Dear Mr. Denton:

The Construction Permit for the Shearon Harris Nuclear Power Plant (SHNPP) requires that Carolina Power

& Light Company (CP&L') conduct a compre-hensive environmental sampling, monitoring, and surveillance program adequate to determine an ecological baseline for measuring the'perational impact of the station on land and water ecosystems.

Based on this requirement and general statements made by the'RC in the Revised P'inal Environmental State-ment, CP&L'esigned' monitoring and sampling program to'atisfy these requirements.

A copy of this program was provided to'r. Andrew Cunningham of your staff during a site'isit early in 1978.

It was recently discovered" by us that one of the Little White Oak Creek sampling stations was incorrectly designated on the program provided to Mr. Cunningham; the'tation identified as LW-2 should have been ident:ified as LW-3.'

corrected* copy of this program, which designates the Little White Oak Creek sampling section as LW-3,'s attached; matter.

Please contact my staff if you have any questions concerning this Yours very truly, M. A. McDuffie Senior Vice President Engineering

& Construction MAM/jcb Attachment 411 Fayetteville Street o P. O. Box 1551 o Raleigh, N. C. 27602 Coo>

65 jfy aeee

E

~.

IV

CONSTRUCTION PERMIT REQUIREMENTS -3F (2)

SHEARON HARRIS NUCLEAR POWER PLANT CONSTRUCTION PERMIT BIOLOGICAL MONITORING PROGRAM ACCOUNTABILITY:

MANAGER, ENVIRONMENTAL.TECHNOLOGY SECTION Page 1 of 5 T

e of Stud Parameter(s)

Measured or Assessed

~Pre cene Stations Sample Area, or Route Duration AQUATIC Water Chemistry Physical-chemical:

Temperature Dissolved Oxygen Conductivity pH Chemical Analyses:

(See Table.l)

Monthly Monthly River stations (B-l, B-2, B-3, D-l, D-2,and D-3)

Stream stations (BK-2, BK-3 CC-l, Lkf-3, LW-8, TJ-l, W-l,

$0-3 and W-42)

River stations (B-2 and Dq2)

Stream stations (BK-.2, BK-3, CC-1, LW-3, LW-S, TJ-l, W-l, W-3 and W-42)

One. year after -all units are in operation One year after all units are in operation Periphyton and plankton Distribution and abundance Quarterly River stations (B-l, B-2, B-3, D-l, D-2 and D-3)

Stream stations (BK-2, BK-3, CC-l, LW-S, TJ-1, W-1 and W-42)

One year=

after all units

.are in operation Benthos Distribution and abundance Quarterly River stations (B-l, B-2, B-3, D-l, D-2 and D-3)

Stream Stations (BK-2, BK-3, CC-1, LW-S, W-l, W-42. and TJ-1)

.One year after all units are in operation Fisheries Distribution,. abundance, food habits, and age/growth Quarterly River transects (B-C and D)

Stream stations (BK-2, BK-3, CC-1, LW-8, LW-3, W-3 and TJ-1)

One year after all units are in operation

I ~

)

~~

~

T e of Stud Parameter(s)

Measured or Assessed

~Fre uenc

Stations, Sample Area, or Route Page 2 of 5 Duratacn kQ TERRESTRIAL Vegetation Quantitative determi-nations by quarter point analysis Qualitative observation Biennial (1978, 1980, etc.)

Three times/

year (spring, summer, fall)

SA-3 and. SA-4 SA-l, SA-2, SA-3, SA-4 and throughout the site area One year after all units are'n operation Avifauna Relative abundance and species diversity Quarterly

1) - Holleman's Crossroad-Buckhorn Dam Route 2)

Merry Oaks-Buckhorn Dam Route Until reser-voir flood g

blocks ro One year-a ter

~ all units are in operation Mammals Relative abundance, species diversity,and distribution Quarterly SA-1, SA-2, SA-3 and SA-4 One-year after all units are Terrestrial.Verte-brates (amphibians reptiles, birds and mammals)

Qualitative observation for occurrence and distribution Quarterly SA-l, SA-2, SA-3, SA-4 and throughout the site area One. year after all units are

.in operation Note:

1)

Stream Stations LW-3, LW-8, TJ-1, W-l, W-3, Terrestrial Station SA-1 and avifauna survey route II1 will be discontinued as the reservoir is filled.. Aquatic sampling transects will be established in the reservoir.

2)

Reporting requirements are limited to maintaining current data and procedures on file for access by the NRC Office of Inspection and Enforcement.

I iC I

I IC'

Page 3 of 5 SHEARON HARRIS-.NUCLEAR POWER PLANT POTENTIAL NPDES MONITORING REQUIREMENTS ACCOUNTABILITY:

hfANAGER, ENVIRONMENTAL TECHNOLOGY SECTION T

e of Stud Parameter(s)

Measured or Assessed

~Fre uenc Stations,-Sample Area, or Route

.Duration Suspended Solids Total suspended solids-To be determined by the NPDES Permit

Page 4 of 5 BIOLOGICAL SAMPLING STATIONS Shearon Harris Nuclear Power Plant Station Creek Name Location I.

BK-3 CC-1 (S-4)

LW-3 LW-8 (S-7)

TJ-1 W-1 (S-3)

W-3 (S-5)

W-42 (S-2)

BK-2 (S-1)

D, BC and B

Buckhorn Creek Cary Branch Little White Oak Creek

'homas Creek Tom Jack Creek White Oak Creek White Oak Creek Buckhorn Creek Buckhorn.Creek

,Cape Fear River 50 m downstream of Route lll6 bridge 30 m upstream of.Route 1127 bridge Route 1127 25 m upstream of Route 1134 bridge 15 m downstream of Route 1132 bridge 20 m downstream of Route 1914 bridge Route 1127 70 m downstream of Highway 42 bridge From Route 1921 From Route 1921 II.

SA-1 SA-2 SA-3 SA-4 Old field off Route 1914 Field off Route 1132 Pine-mixed hardwoods off Route 1127 Mixed hardwoods off Route 1115 III. Wildlife Survey Routes

>ferry.Oaks to Cape Fear River (Routes 1911 and 1912, NC 42 and Route 1921)

Holleman's Crossroads to Cape Fear River (Route 1130, 1914, 1912, NC 42 and Route 1921)

Table 1

Page 5 of 5 Water Chemistry Parameters Measured pH Alkalinity (as CaCO )

Chloride Conductivity Hardness Ammonia Total Kjeldahl Nitrogen Nitrate C.O.D.

Total Phosphate Total Orthophosphate Dissolved Silica

.Total Solids Total Suspended Solids Total Dissolved Solids (Glass Fiber Filter)

Total Dissolved Solids (0.45 u Filter)

Chromium +6 Mercury Total Aluminum Total Calcium Total Copper Total Iron Total Lead Total Magnesium Total Manganese Total Nickel Total Zinc Sulfate Turbidity Total Organic Carbon

.Total Volatile Solids Total Sodium