ML18017A781

From kanterella
Jump to navigation Jump to search
Submits Seismic Monitoring Program Fourth Quarterly Rept Covering Oct-Dec 1979
ML18017A781
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 01/23/1980
From: Mcduffie M
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8001290346
Download: ML18017A781 (6)


Text

REGULATORY I

)RHATION DISTRIBUTION SYS (RIDS)

ACCESSION NBR:8001290396 OOC ~ DATE: 80/01/23 NOTARIZED:

NO FACICs50 400 Shearon Harri s Nuc'1 ear Power Pl antg Oni t iE Carol ina 50-001 8hearon Aarr i s Nuc 1 ear Power P') ant i Oni t 2i Car ol ina SO 002 Shearon Herris blue'lear Power Plant~

On'it 3r Carolina AUTH INANE AUTHOR AFFILIATION NCOOFF1EEN ~ A, Carotina Power 8 Light Co AELIP,'NAME REC kl'IENf AFF ILIA' ION DE.N'f~NEH ~ RE Off>ce of Nuclear Reactor Regulation DOC 0

05000401 05000402

SUBJECT:

Submits seismic monito.ring program fourth quarterly rept covering Oct Dec 1979. 162 culture) events w/S~P of -less than few seconds recorded. 150 confirmed as explosions by respopsible companies or agencies, DISTRISUTION CODE:

SOOIS COPIES RECEIVED:LTR d ENCL'/

SIZE:

TITLE: PSAR/FSAR 'ARDTS eod Related Coicespoodence N

P t' OTES ~

ACTION ~

RECIPIENT COPIES ID CODE/NAME C'ffH ENCL 05 PH~~c C ~" i BC ~~@.~ Q i

0 RECIPIENT ID CODE'./NA~E AD LA ~~ram%

COPIES LTTR EACL.

i 1

0 INTERNAL~

0 1~RES 06raE 09 GEOSCIEN BR 11 HECR EAG 8R i3 NATL FHC- &H 16 ANALYSIS SR i8 AUX 'S'ii'S BA 20 I 8

C SYS BR 22 AO SkrE TECH 27 EFFL'AT SPS 29 KIRKWOOO AO PLANT SPS AD SITE AALYSIS HYDRO lUIETEdH 8R OELD EXTERNALs 03 LPOR 30 ALAS 1

1 2

1 1

2 2i ii 1

1 ii 0

0 2

0 1

1 10 10 02 NRC PDR 08 OPERA LIC BR 10 QAB i2 STRUC ENG BR iS REAC SYS BA i7 CORE PERF BR 19 CONTAIA SYS 2i POWER SY3 BR 26 ACCDAT AALYS 28 AAb A'Sl>i '8H Ab FOR ENG AD AEAC SAFETY DIRECTOR NAB Hf'A 0P NSIC 1

1 i

i 1

1 i

i i

iiiii i

0 i

0 i

0 i

0 A

~ e TOTAL NUMBER OF COPIES REQUIREDe LTTR ~

ENCL 00

k 1

k s'

~

~

h f

'1 4

Carolina Power & Light Company January 23, 1980 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States'uclear Regulatory Commission Washington, D.C.

20555 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NOS..1, 2,. 3, AND 4 DOCKET NOS. 50-400, 50-401, 50-402, AND 50-403 SEISMIC MONITORING PROGRAM

Dear Mr. Denton:

Carolina Power

& Light Company is hereby providing by attachment the fourth quarterly report of the Shearon Harris Nuclear Power Plant (SHNPP)

Seismic Monitoring Program.

This report includes data covering the period October 1, 1979 through December 31, 1979.

Yours very truly, M. A. McDuffie Senior Vice President Engineering

& Construction SDP/jcb Attachment tlIPP 411 Fayetteville Street o P. O. Box 1551 o Raleigh, N. C. 27602 800Xa gO

'4 N~

QUARTERLY DATA REPORT SHNPP SEISMIC MONITORING PROGRAM OCTOBER 1 1979

DECEMBER 31 1979 Carolina Power 6 Light Company has completed another quarter of operation of its seismic monitoring program at the Shearon Harris Nuclear Power Plant site near New Hill, North Carolina.

During this period a total of 162 cultural events were recorded with, an S-P, of less than 5 seconds.

No local earthquakes were 'detected.

Of these 162 events, 150 were confirmed as being explosions by the responsible companies or agencies.

The remaining 12 events displayed the signature and arrival pattern of previously identified cultural events and all of them occurred during daylight hours.

Only one of these events was recorded on a weekend or holiday:

Date D~a GMT at Sta.

4 S-P at Sta.

4 Probable Source 11-12-79 Veteran's Day 21:30:23.0 3.6 Garner Quarry The signature and arrival pattern of this event are identical to 6 other events recorded during this quarter that were confirmed as being explosions from the Garner Quarry.

l II