REGULA1'ORY ACCESSION NBH e 800128031b FACIAL:50>>400 bheai on Aarri 50 401 Shearon Harri 50 402 Shearon Herri AUTH BYNAME AUTHUR A

MCOUFFIEr M ~ A, Carot ina RECB NAME HECIP IEN PAHArOeDe C i'ght IN MATION DIS fRIBUTION SYST (HlDS)

DOC ~ DATE: 80/01/21 NOTARIZED:

NO s Nucteai Power Plantr Unit 1i Carolina s Nuclear Power Planti Unit 2r Carolina s Nuc'lear Power Plant~

Un'it Si Carol"ina FFII IATIUN Power 8 Light Co.

T AFI ILIATION Water Reactors Branch DOCKEI'SOOlI40O 05000401 05000402 AS SUBJEC1:

Submits revision of paragraph 4 ~ 4 of Technical Procedure TP 02 re placement of C'lass I piping 8 dust banks in previously pieced backfi)I,Addi tests needed for areas where depth of fill under pipes is greater than 10 Ft.

DISTRIBUTION CODE'001S COPIES RE'CEI VED: LTR

/ ENCL M SIZE:~

TII'LE:

f SAA7FSAR AMDTS"and Related Correspondence N

vr ~

O fES ~

RECIPIENT ID COOE'./NAME ACTION:

05 PA W~N~R BC Lung 4g COPIES r.'rTH INC ii RECIPIENT ID CuDE/NAME AD L~8 IA C CAR O'D COPIES LTrA 'FN 1

INTEHNAI:

EG~I E 09 I:EOSCIEN BR 11 MECR BAG BA 13 MATL ENC BA 16 ANALYSIS BH 18 AUX 878 BH 20 I 5

C SYS BH 22 AD SlTK "fECFI 27 EFFC 'ter 87S 29 KIAKWOUD AD I LANT SYS AD SITE ANLYSIS HYDRO-MENTEUR BR OELD 1

2 1

2 1

1 1

i 1

1 1

02 NRC PDH 08 OPERA'.IC BR 10 QAB 12 STRUC ENG BH 15 HEAC SYS BA i"t CQRB PILAF BR i 9 CONTAIN SY8 21 POWER bYS BR 26 ACCDNT AALYS 28 HAD ASMT HH AD FOH ENG AD REAC SAFETY DIRECTOR NRA MPA 1

i ii 1

1 1

ii 0

i 0

1 0

EXTERNALS 03 I.PDR 30 AcHS 1

10 04 NSIC

~gg)

"g J I380 TOTAI. NUMBER OF COPIES HE,QUIRE,D:

LT1R 51 FNCL

lt

Carolina Power & Light Company January 21, 1980 Mr. Olan D. Parr, Chief Light Water Reactors Branch No.

3 Division of Project Management United States Nuclear Regulatory Commission Washington, D.C.

20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS. 1, 2, 3, AND 4 DOCKET NOS. 50-400, 50-401, 50-402, AND 50-403 CLASS I PIPING AND DUCT BANK AREAS

Dear Mr. Parr:

On November 6, 1979, Carolina Power

& Light Company (CP&L) submitted the plans and profiles of original ground and fillcontours, and the planned locations for all Class I piping and electrical conduit in previously placed backfill material.

CP&L committed to follow the requirements per paragraph 4.4 of Technical Procedure TP-02 "Soil Control Program Fill and Backfill for Plant Grade, Plant Building and Reservoir Concrete Structures."

Based on conversat:ions with Mr. Owen Thompson of your staff, it was agreed that additional testing requirements were needed to address those areas where the depth of previously placed fillmaterial under pipes or duct banks is greater than ten feet.

Accordingly, paragraph 4.4 of TP-02 will be revised to read as follows:

l.

In-place density testing shall be completed in previously placed fillduring excavation.

Test locations shall be at vertical inter-vals of 2.5 feet below the surface down to and also at the elevation required for setting pipes or duct banks.

This applies to all fill except blasted random fill. Note:

The 12 inch sandcone, in accor-dance with ASTM D1556, shall be used for ripped material:

When the depth of existing fillremaining under pipes or duct banks is less than 10 feet no additional in-place testing will be required other than proof rolling (item 4).

When the depth of existing fill remaining under pipes or duct banks is greater than 10 feet', addi-tional.in-place testing of the fillbeneath pipes and duct banks will be completed by one of, or a combination of the following methods:

411 Fayetteville Street o P. O. 8ox 1551 o Raleigh, N. C. 27602 806128e Be ~I 5lie

Mr. Olan D. Parr a) in-place density testing in test pits in or near to the exca-vation for pipes and duct banks.

The tests are to be made at 2.5 feet vertical intervals from the bottom of the excavation down to 5 feet or less above original ground.

b) density testing of undisturbed tube samples taken from test borings in or near the excavation for pipes and duct banks.

The samples are to be taken at 2.5 feet vertical intervals from the bottom of the excavation down to original ground.

c) standard penetration testing (SPT) in test borings in or near the excavation for pipes and duct banks, and correlations between SPT and in-place density tests for the materials encountered.

SPT,locat'ions to be made at 2.5 feet intervals from the bottom of the excavation down to original ground.

Correlations between in-place density tests and SPT may be made at elevations above the bottom of the excavation and extra-polated to the lower depth intervals where only SPT values are available.

The influence of overburden pressure and coarse particles on SPT values will be considered in the correlations.

The proper placement of backfill in the test pits and test holes will be verified per the requirements of TP-02.

2.

The test frequency of tests shall be one for every 75 linear feet of trench approximately along the'centerline.

3.

A proctor curve in accordance with ASTM D698 (or a "one point proctor" to verify an existing curve) shall be developed for each density test.

4.

A nonconformance report shall be issued and the Area Engineer shall be notified if the in-place density is below 95% Standard Proctor.

5.

After density testing is completed and prior to placing bedding

material, the entire surface area of fillmaterial shall be p'roof rolled to identify any soft fillmaterial.

6.

Proof rolling shall be completed with four passes of a sheepfoot or vibratory roller under 100% monitoring by a qualified'oil inspector.

The Area Engineer shall be notified if any soft areas are identified prior to removal and replacement with suitable material.

I

Mr. Olan D. Parr Carolina Power'6 Light Company believes" this revision adequately addresses your concerns regarding the placement of Class I piping and dust banks in previously placed fill. Please formalize your technical concurrence with our criteria to allow NRC Region II Inspection and Enforcement to release their hold on this construction activity.

Contact us if you desire any discussion or clarification of this submitted material.

Yours very truly, M. A. McDuffie Senior Vice President Engineering and Construction MAM/jcb cc: