Forwards IE Insp Repts 50-400/79-18,50-401/79-18, 50-402/79-17 & 50-403/79-17 on 790904-07.No Noncompliance Noted
ML18017A713
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 10/18/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML18017A711 List:
References
NUDOCS 7911210093
Download: ML18017A713 (2)


See also: IR 05000400/1979018

Text

~l,

~S REQy~

~o

Cy

~c

O

0

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

In Reply Refer To:

RII:RDB

50-400/79"18

50-401/79-18

50-402/79"17

50-403/79-17

OCT 1 8 1979

Carolina Power and Light Company

ATTN:

Mr. J. A. Jones

Executive Vice President

and

Chief Operating Officer

411 Fayetteville Street

Raleigh,

NC

27602

Gentlemen:

This refers

to the

inspection

conducted

by R; D. Bradley of this office on

September

4-7,

1979, of activities authorized

by

NRC Construction

Permit Nos.

CPPR-158,

CPPR-159,

CPPR-160,

and

CPPR-161 for the Shearon Harris Nuclear Power

Plant facility, and to the discussion of our findings held with R.

M. Parsons

at

the conclusion of the inspection.

Areas

examined

during the

inspection

and

our findings

are

discussed

in the

enclosed

inspection

report.

Within these

areas,

the inspection

consisted

of

selective

examinations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

Within the scope of this inspection,

no items of noncompliance

were disclosed.

One

new unresolved

item resulted

from this inspection

and is discussed

in the

enclosed report.

This item willbe examined during subsequent

inspections.

In accordance

with Section 2.790 of the NRC's "Rules of Practice", Part 2, Title

10, Code of Federal Regulations,

a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document

Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary

that you make

a written application within 20 days to this office to

withhold such

information from public disclosure.

Any such application

must

include

a full statement of the reasons'on

the basis of which it is claimed that

the information is proprietary,

and

should

be prepared

so that proprietary

information identified in the application is contained in a separate

part of the

document. If we do not hear from you in this regard within the specified period,

the report willbe placed in the Public Document Room.

Carolina

Power and Light Company

Should you have

any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

C. E. Murp

, Chief

Reactor Construction

and Engineering

Support Branch

Enclosure:

Inspection Report Nos. 50-400/79-18,

50 401/79

18 p 50 402/79

17 y

GIld 50 403/79

17

cc w/encl:

R. Parsons,

Site Manager

P. 0.

Box lOl

New Hill, NC

27562