ML18017A682

From kanterella
Jump to navigation Jump to search
Forwards Quarterly Seismic Monitoring Rept for Jul-Sept 1979
ML18017A682
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 10/29/1979
From: Mcduffie M
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML18017A683 List:
References
NUDOCS 7911010378
Download: ML18017A682 (4)


Text

/"

REGULATORY INFORMAL'N DISTRIBUTION SYSTEM (Rlg)

ACCESSION NBR: 7911010378 DOC ~ DATE; 79/10/29 NOTARIZED:

NO FACIL:50-000 Shearon Harris Nuclear Power Plants Unit ii Carolina 50 401 Shearon Harris Nuclear Power Plants Unit 2i Carolina 50-402 Shearon Harris Nuclear Power Plants Unit 3i Carolina AUTH BYNAME AUTHOR AFFILIATION MCDUFFIEiM.A.

Carolina Power 8 Light Co, REC IP ~ NAME RECIPIENT AFFILIATION DENTONiH.R.

Office of Nuclear Reactor Regulation DOCKS'

)0 05000401 05000402 9~3

SUBJECT:

Forwar ds quar terly seismic monitoring rept for Jul "Sept 1979s DISTRIBUTION CODE:

B001B COPIES RECEIVED'.I TR l ENCL f SIZE:g +J TITLE: PSAR/FSAR AMDTS and Related Correspondence

(

NOTES'ECIPIENT ID CODE/NAME ACTION'5 PM COINER BC LulR +D INTERNAL: 01 06 I 8

09 GEOSC IEN BR 11 MECH ENG BR 13 MATL ENG BR 16 ANALYSIS BR 18 AUX SYS BR

?0 I 8

C SYS BR 2?

AD SITE TECH 27 EFFL TRT SYS 29 KIRKWOOD AD PLANT SYS t

AD SITE ANLYS IS HYDRO-METEOR BR OELD EXTERNAL: 03 LPDR 30 ACRS COPIES LTTR ENCL 1

1 1

0 1

1

?

2 1

1 2

2 1

1 1

1 1

1 1

0 1

1 1

1 1

0 1

0 2

2 1

0 1

1 10 10 REC IPIENT ID CODE/NAME AD LEER LA LMR >~

02 NRC PDR

,08 OPERA LIC BR 10 QAB 12 STRUC ENG BR 15 REAC SYS BR 17 CORE PERF BR 19 CONTAIN SYS 21 POWER SYS BR ACCDNT ANLYS 28 RAD ASMT BR AD FOR ENG AD REAC SAFETY DIRECTOR NRR MPA 04 NSIC COPIES LTTR ENCL 0

0 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 0

1 0

1 0

1 0'd ORE.

S; A'Ed C Gas'E'g Er&

) OTAL NUMBER OF COPIES REQUIRED:

LTTR

~S FNCL 40

4

~

1 1

h l

V 1

h'

CRT Carolina Power & Light Company October 29, 1979 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D.C.

20555 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NOS. 1, 2, 3, AND 4 DOCKET NOS. 50-400, 50-401, 50-402, AND 50-$ 03 SEISMIC MONITORING PROGRAM

Dear Mr. Denton:

Carolina Power 6 Light Company is hereby providing by attachment the third quarterly report of the Shearon Harris Nuclear Power Plant (SHNPP)

Seismic Monitoring Program.

This report includes data covering the period July 1, 1979 through September 30, 1979.

MAM/gcb Attachment Yours very truly, Q4Z 4'.

A. McDuffie Senior Vice President Engineering

& Construction o~

$0 411 Fayetteville Street o P. 0, Box 1551 o Raleigh, N. C. 27602 f9lypro> 7g

k J,l I

l v.