ML18017A682

From kanterella
Jump to navigation Jump to search
Forwards Quarterly Seismic Monitoring Rept for Jul-Sept 1979
ML18017A682
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 10/29/1979
From: Mcduffie M
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML18017A683 List:
References
NUDOCS 7911010378
Download: ML18017A682 (4)


Text

/"

REGULATORY INFORMAL'N DISTRIBUTION SYSTEM (Rlg)

ACCESSION NBR: 7911010378 DOC DATE; 79/10/29 NOTARIZED: NO DOCKS' Plants Unit ii Carolina

~

FACIL:50-000 Shearon Harris Nuclear Power )0 50 401 Shearon Harris Nuclear Power Plants Unit 2i Carolina 05000401 50-402 Shearon Harris Nuclear Power Plants Unit 3i Carolina BYNAME 05000402 AUTH AUTHOR AFFILIATION 9~3 MCDUFFIEiM.A. Carolina Power 8 Light Co, REC IP NAME

~ RECIPIENT AFFILIATION DENTONiH.R. Office of Nuclear Reactor Regulation

SUBJECT:

Forwar ds quar terly seismic monitoring rept for Jul "Sept 1979s DISTRIBUTION CODE: B001B COPIES RECEIVED'.I TR l ENCL f SIZE:g +J TITLE: PSAR/FSAR AMDTS and Related Correspondence

(

NOTES'ECIPIENT IPIENT COPIES COPIES REC ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL ACTION'5 PM COINER 1 1 AD LEER 0 BC LulR +D 1 0 LA LMR >~ 0 INTERNAL: 01 1 1 02 NRC PDR 1 1 06 I 8  ? 2 ,08 OPERA LIC BR 1 1 09 GEOSC IEN BR 10 QAB 1 1 11 MECH ENG BR 1 1 12 STRUC ENG BR 1 1 13 MATL ENG BR 2 2 15 REAC SYS BR 1 1 16 ANALYSIS BR 1 1 17 CORE PERF BR 1 1 18 AUX SYS BR 1 1 19 CONTAIN SYS 1

?0 I 8 C SYS BR 1 1 21 POWER SYS BR 1 1 2? AD SITE TECH 1 0 ACCDNT ANLYS 1 1 27 EFFL TRT SYS 1 1 28 RAD ASMT BR 1 29 KIRKWOOD 1 1 AD FOR ENG 0 AD PLANT SYS 1 0 AD REAC SAFETY 1 0 t

AD SITE ANLYS IS 1 0 DIRECTOR NRR 1 0 HYDRO-METEOR BR 2 2 MPA 1 OELD 1 0 EXTERNAL: 03 LPDR 1 1 04 NSIC 0'd 30 ACRS 10 10 ORE.

S; A'Ed C Gas'E'g Er&

~S OTAL NUMBER OF COPIES REQUIRED: LTTR FNCL 40

)

4

~ 1 1

h l

V 1

h'

CRT Carolina Power & Light Company October 29, 1979 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D.C. 20555 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NOS. 1, 2, 3, AND 4 DOCKET NOS. 50-400, 50-401, 50-402, AND 50-$ 03 SEISMIC MONITORING PROGRAM

Dear Mr. Denton:

Carolina Power 6 Light Company is hereby providing by attachment the third quarterly report of the Shearon Harris Nuclear Power Plant (SHNPP) Seismic Monitoring Program. This report includes data covering the period July 1, 1979 through September 30, 1979.

Yours very truly, Q4Z 4'.

A. McDuffie Senior Vice President Engineering & Construction MAM/gcb Attachment o~

0 411 Fayetteville Street o P. 0, Box 1551 o Raleigh, N. C. 27602 f9ly pro> 7g

k J,l I

l v.