Text
~S REOy
P
~4
0
e
flO
O~
+~
~O
+**g+
In Reply Refer To:
RII:RDB
50-400/79"15
50-401/79-15
50-402/79"14
50-403/79-14
UNITEDSTATES
NUCLEAR REGULATORY COMMISSION
REGION 11
101 MARIETTAST., N.W., SUITE 3100
ATLANTA,GEORGIA 30303
$ pp 051979
Carolina Power and Light Company
Attn:
J. A. Jones
Senior Executive Vice President
and Chief Operating Officer
411 Fayetteville Street
Raleigh, North Carolina
27602
Gentlemen:
This refers to the inspection
conducted
by R. D. Bradley of this office
on August 13-16,
1979 of activities authorized by NRC Construction
Permit Nos.
CPPR-158,
CPPR-159,
CPPR"160
and
CPPR-161 for the Shearon
Harris Nuclear Power Plant facility, Unit Nos.
1, 2,
3 and 4,
and to the
discussion of our findings held with R.
M. Parsons
at the conclusion of
the inspection.
Areas
examined during the inspection
and our findings are discussed
in
the enclosed
inspection report.
Within these areas,
the inspection
consisted of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observations
by the inspector.
Within the scope of this inspection,
no items of noncompliance
were
disclosed.
In accordance
with Section 2.790 of the NRC's "Rules of Practice",
Part 2, Title 10,
Code of Federal Regulations',
a copy of this letter and
the enclosed inspection report will be placed. in the NRC's Public
Document
Room. If this report contains
any information that you (or
V91018D 07+
Co
Carolina Power and
Light Company
SEF Oglgyg
your contractor) believe to be proprietary, it is necessary
that you
make
a written application within 20 days to this office to withhold
such information from public disclosure.
Any such application must
include
a full statement
of the reasons
on the basis of which it is
claimed that the information is proprietary,
and should be prepared
so
that proprietary information identified in the application is contained
in a separate
part of the document.
If we do not hear from you in this
regard within the specified period, the report will be placed in the
Public Document
Room.
Should you have
any questions
concerning this letter,
we will be glad to
discuss
them with you.
Sincerely,
Reactor Construction
and
Engineering Support Branch
Enclosures:
Inspection Report Nos. 50-400/79-15,
50-401/79-15,
50-402/79-14
and
50-403/79-14