gA~ RECy
LQ(i
4tp
+
O~
Cy
++**+
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTAST., N.W., SUITE 3100
ATLANTA,GEORGIA 30303
JUL 1 0 t979
In Reply Refer To:
RII:RDB
50-400/79-10
50-401/79-10
50-402/79-09
50-403/79"09
Carolina Power and Light Company
ATTN: Mr. J. A. Jones
Executive Vice President
Engineering, Construction and Operation
411 Fayetteville Street
Raleigh,
NC
27602
Gentlemen:
This refers
to the inspection
conducted
by
RE D. Bradley of this office on
June
12-15,
1979,
of activities
authorized
by
NRC Construction
Permit
Nos.
CPPR-158,
CPPR-159,
CPPR-160,
and
CPPR-161 for the Shearon Harris Nuclear Power
Plant facility, and to the discussion of our findings held with R.
M. Parsons
at
the conclusion of the inspection.
Areas
examined
during the inspection
and
our findings
are
discussed
in the
enclosed
inspection
report.
Within these
areas,
the inspection
consisted
of
selective
examinations
of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector,
Within the scope of this inspection,
no items of noncompliance
were disclosed.
One
new unresolved
item resulted
from this inspection
and is discussed
in the
enclosed report.
This item willbe examined during subsequent
inspections.
In accordance
with Section 2.790 of the NRC's "Rules of Practice", Part 2, Title
10,
Code of Federal Regulations,
a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document
Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary
that you make
a written application within 20 days to this office to
withhold such
information
from public disclosure.
Any such application
must
include
a full statement
of the reasons
on the basis of which it is claimed that
the
information is proprietary,
and
should
be
prepared
so that proprietary
information identified in the application is contained in a separate
part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
Z9 08160
Carolina Power and Light Company
JUP 10 1S79
Should you have any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
Charles
E.
urphy
Chief
Reactor Construction
and Engineering
Support Branch
Enclosure:
Inspection Report Nos. 50-400/79-10,
50-401/79-10,
50-402/79-09,
and 50-403/79-09
cc w/encl:
R. Parsons,
Site Manager
P. 0.
Box 101
New Hill, NC
27562