Text
P~
'b.......,
Carolina P,
er< >i~PI Cbi11pany
. ~ >
July 9, 1979 g )0L12 ~9: Ol Mr. James P. O'Reilly, Director Region II U. S. Nuclear Regulatory Commission 101 Marietta Street, N.W.
Atlanta, Georgia 30303 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS
~ 1 ~
2 j 3 AND 4 DOCKET NOS. 50-400, 50-401, 50-402 AND 50-403 IE BULLETIN 78-12B
Dear Mr. O'Reilly:
In response to IE Bulletin 78-12B, Carolina Power il Light Company submitted a letter on May 29, 1979, which stated that ve vere satisfied that the generic report submitted to you by Chicago Bridge and Iron Company on April 29, 1979, on the weld materials used to fabricate the reactor pressure vessels for the Shearon Harris Nuclear Power Plant (SHNPP) Units 1 and 2, adequately represented our vessels.
Our letter also stated that the generic report for the reactor pressure vessels for SHNPP Units 3 and 4, manufactured by Combustion Engineering, was not yet available.
We, therefore, requested a 30 day review period, subsequent to the submittal of the generic report by Combustion Engineering, before responding regarding the pertinence of the report to our Unit 3 and 4 reactor pressure vessels.
Combustion Engineering submitted their generic report to the NRC on June 8, 1979.
Carolina Power 6 Light Company and Westinghouse Electric Corporation, our supplier, have reviewed this report and are satisfied that it adequately represents data for the reactor pressure vessels for SHNPP Units 3 and 4 with the following corrections:
P 1.
Section IV, page 2, Contract No.
7472 a.
Change W-71 to S-73.
b.
Change Shearon Harris 83 to Shearon Harris 04.
2.
Section IV, page 3, Contract No. 10973 a.
Change W-73 to S-73.
b.
Change Sheron Harris 83 to Shearon Harris 83.
79osxeo >4 411 Fayouovillo Street
~ P. O. Box 1551
~ Raleigh, N. C. 27602
) lo~~>
OFhICIALCOPY
Mr. James P. O'Reilly July 9, 1979 This completes Carolina Power
& Light Company's response to IE Bulletin 78-12B in connection with the Shearon Harris Nuclear Power Plant. If you have any questions concerning this matter, please contact our staff.
Yours very truly, M. A. McDuffie Senior Vice President Engineering 6 Construction MAM/gcb cc:
U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Division of Reactor Construction Inspection Washington, D.C.
20555