ML18017A612
| ML18017A612 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 07/13/1979 |
| From: | Parr O Office of Nuclear Reactor Regulation |
| To: | Jackie Jones CAROLINA POWER & LIGHT CO. |
| References | |
| NUDOCS 7908100182 | |
| Download: ML18017A612 (4) | |
Text
Distribution
)
Docket Fil es NRC PDR Local PDR LWR 83 File D. Vassallo D.
Ross S.
Varga F. Williams
- 0. Parr
... Miner
. Rushbrook R. Mattson Docket Nos. 50-400/401/402/403 S.
Hanauer J.
Knight R. Tedesco R.
DeYoung V. Moore W. Kreger
>>< ~3
>S78 M. Ernst R. Denise OELD IE (3)
BCC: JBuchanan TAbernathy ACRS (16) t1r. J.
A. Jones Executive Vice President - Engineering Construction and Operations Carolina Power 5 Light Company 336 Fayetteville Street
- Raleigh, t<orth Carolina 27602
/j)/v'pili,
~~4<(
6(ti~--
Dear Mr. Jones:
SUBJECT:
SHEARON HARRIS NUCLEAR POWER PLANT, UNITS 1, 2, 3, AND 4-SEISMIC t10NITORING PROGRAM On April 30, 1979, you provided the first report from your Seismic Monitoring Program.
The report sumnarized the first eighteen months of data from the seismograph installed to monitor any seismicity which might accompany filling of the reservoir at the Shearon Harris Site.
We have reviewed the report and noted that no seismic activity was detected in the plant site area.
In order to help us to better understand the data, we request that you provide, in your next data report, the information listed in the attached Enclosure.
Please contact us if you desire any discussion or clarification of the information requested.
Sincerely, Origtn~t 84".ned bV
- o. f). parr Olan D. Parr, Chief Light Mater Reactors Branch No.
3 Division of Project Management
Enclosure:
As Stated cc w/enclosure:
See next page 9 Gag Q~(p~
OFFIOd~
OQd4IABId~
BIAfd~
LWR //3:LP."
~ ~ I ~ ~ ~ ~ ~ ~ ~ ~ ~ I
~ ~ ~ ~ ~ ~
~
SMiner/LLt 7/ gg /79
~ PCRW SLO (9-16) HECK 0240 L!/BC ODParr
~ ~ ~
~
~ ~ ~ ~ ~ ~ ~ ~ ~
~
~ ~
~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~
~ f ~
~
~
~ ~ ~ I I ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~
7/]g /79 Q U 4 OOVOHHMIHTI'IIIHTIHOOHHICOI I ~ 4 ~
444 4 ~ 4
I n
4l
Mr. J.
A. Jones JUL g3
~gag cc:
George F. Trowbridge, Esq.
Sggq, Pittman, Potts, 7I owbridge 8 thdden 1800 M Street, N.
W.
Washington, D.
C.
20036 Richard E. 'Jones, Esq.
Associate General Counsel Carolina Power 8 Light Company 336 Fayetteville Street Raleigh, North Carolina,'27602 Thomas S.
- Erwin, Esq 115 W. Morgan Street Ra 1 ei g h, North Ca rol i na 27602 Jesse C. Brake, Esq.
Associate Attorney General State of North Carolina P.
0.
Box 629'aleigh, North Carolina
-27602 Alan S. Rosenthal, Esq.,
Chairman Atomic Safety and Licensing Appeal Board U. S.
Nuclear Regulatory Comnission Washington, D.
C.
20555 Michael C. Farrar, Esq.
Atomic Safety and Licensing Appeal Board S.
Nuclear Regulatory Coamission Washington, D.
C.
20555 Dr. John H.
Buck Atomic Safety and Licensing Appeal Board U. S.
Nuclear Regulatory Coranission Washington, D.
C.
20555 Mr. -Glenn 0. Bright Atomic Safety and Licensing Board Panel U. S.
Nuclear Regulatory Commission Washington, D.
C.
20555 Dr. J.
V. Leeds, Jr.
10807 Atwell Drive
- Houston, Texas
//096
,Wake County.Public Library 104 Fayetteville Street Ral,eigh, North Carolina 27601 Dennis P.
Myers Attorney Genera 1 '
Offi ce State of North Carolina P.
0.
'Box 629 Ral ei gh, North Carol ina 27602 Ivan W. Smith, Chairman Atomic Safety and Licensing Board Panel U. S.
Nuclear Regulatory Commission Washington, D.
C.
20555
ENCLOSURE RE(VEST FOR ADDITIONAL INFORMATION SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NOS. 50-400/401/402/403 GEOSCIENCES BRANCH Who are the personnel who set up the seismic network, analyze the
- records, maintain the instruments, and write the data reports'?
.Is there a seismology consultant who reviews the analyst's work'?
Include several sample records.
Identify the cultural events and state those signal characteristics used to identify cultural events.
Identify teleseismic events on the records.
Calculate magnitudes of several teleseismic events recorded at the network to confirm the network's response.
What is your explanation for the lack of earthquakes near the plant site during the first eighteen months of network operation?