Summarizes NRC Guidelines for Preparation of Environ Rept, as Discussed at 790508 Meeting
ML18017A532
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 05/29/1979
From: Mcduffie M
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 7906010192
Download: ML18017A532 (6)


Text

....lk C

REGULATORY FORMATION DISTRIBUTION SY

,'M (RIDS)

ACCESSION NBR:7906010192 DOC ~ DATE! 79/05/29 NOTARIZED! NO FACIL'50 400 SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1 g CAROLINA

(

50-401 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 2 CAROLINA 50 002 SHEARON HARRIS NUCLEAR POWER PLANT UNIT 3 p CAROLINA AUTH~ NAME AUTHOR AFFILIATION MCDUFFIEiM,A, CAROLINA I OWER L LIGHT CO ~

RECIP,NAME RECIPIENT AFFILIATION NORD OFFICE'F NUCLEAR REACTOR REGULATION SUB JECT; SUMMARIZES NRC GUIDELINES FOR PREPARATlON OF ENVIRON REPT AS DISCUSSED AT 790508 MEETINGS DISTRIBUTION CODE+

C002B COPIES RECEIVED+LTR J ENCL ~

SIZE:

TITLE! ENV IRON e COMMENTS ~

DOCKET 05000400 05000401 05000002 P'C ~

~ rs

~

~

ee a

a e

a a w~~

~

w A

RECIPIENT ID CObE/NAME ACTION:

05 PM 5 epg~g 18 LA Ctg ~

INTERNAL:

0 07 I8E 10 CST BNFT ANL 12 AD SITE TECH 15 EFLT TRT SYS 19 DIR DSE AD SITE ANALY

'XTERNALS 03 LPDR 20 NATL LAB COPIES LTTR ENCL REC'IP IENT ID CODE/NAME 17 BC GP8 g-AD hood 02 NRC PDR 09 ENVN SPEC BR 11 TA/EDO 10 ACDENT ANALY 16 RAD ASMT BR AD ENVIRON TECH OKLD OLl NS I C ACRS COPIES LTTR ENCL L-TR.

1IAsscl'L~

gC q (pl~

~/z-3 0

TOTAL NUMBER OF COPIES REQUIRED o LTTR 28 ENCL g4

0 E

a

~l

@~a~

Carolina Power & Light Company May 29, 1979 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission TORY DOOj(ET F(

Washington, D.

C.

20555 E CQ('

SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NOS.

1, 2, 3, AND 4 DOCKET NOS. 50-400, 50-401, 50-402, AND 50-403 OPERATING LICENSE ENVIRONMENTAL REPORT

Dear Mr. Denton:

On May 8, 1979, representatives from Carolina Power

& Light Company met with representatives from the NRC's Environmental Projects Branch to dis-cuss the preparation of the Shearon Harris Nuclear, Power Plant (SHNPP)

Environmental Report (ER), which is to be submitted

'to the NRC'taff in June, 1980.

We found the meeting productive and helpful in establishing an acceptable approach to preparing the SHNPP ER.

As a result of the meeting, it is our understanding that the fol-lowing guidelines accurately summarize an approach acceptable to the NRC staff:

1.

The Operating License ER should be as self-contained as possible without duplicating the Construction Permit ER.

Sections of the Operating License ER containing information which has not changed should reference the appropriate section of the Construction Permit ER with a statement that the information requires no update.

In instances where the information has

changed, the section should be rewritten without reference to the Construction Permit ER.

2.

The focus of the Operating License ER should be on those sections which discuss the environmental effects of station operation.

These sections must contain the information required by Regulatory Guide 4. 2, Revision 2.

3.

If the environmental or socioeconomic impacts of construction have been found to be appreciably different (better or worse), this should be discussed in the Operating License ER.

For example, if we predicted a peak work force of 4,000 and the actual peak was 5,000, this should be identified.

4.

Changes to the originally proposed design which have already been presented and reviewed by the staff should not be identified as changes in the Operating License ER.

For example, the change in the cooling tower blowdown discharge location was reviewed by the staff during the fall 1977 SHNPP hearings.

It is not necessary to explain these changes again; we need only reference the fall 1977 hearings.

~808910 i>~~,

5 ooQ 411 Fayetteville Street

~ P. O. Box 1551

~ Raleigh, N. C. 27602

~5 i/~

(,'Q j)GQ '

Mr. H.

R. Denton 1~29, 1979 5 ~

>><<rm<<ion that is identical to that found in the SHNPP FSAR may be referenced.

For example, Section 2.5 "Geology" is fully discussed in the FSAR and need only be referenced.

6.

Since SHNPP is a four-unit plant, effects of station operation should be analyzed for the worst case (four-unit operation) even though for a significant period of time there will be less than four units operating.

7.

Much of the information in the Operating License ER is supported by references to other publications.

Copies of these references need not be submitted with the ER.

Please advise. us if our understanding of these guidelines is di,f-ferent from yours.

Yours very truly, MAM/mf M. A. McDuffie Senior Vice President Engineering and Construction