ML18017A523

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-400/79-06,50-401/79-06, 50-402/79-05 & 50-403/79-05 on 790402-05.No Noncompliance Noted
ML18017A523
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 04/19/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML18017A521 List:
References
NUDOCS 7905250017
Download: ML18017A523 (4)


See also: IR 05000400/1979006

Text

~s RpQy,

(4

0

In Reply Refer To:

RII:RDB

50-400/79-06

50-401/79-06

50-402/79-05

50-403/79-05

UNITEDSTATES

NUCLEAR REGULATORYCOMMISSION

REGION II

101 MARIETTASTREET, N.W.

ATLANTA,GEORGIA 30303

APR 19 1979

Carolina

Power and Light Company;

Attn:

J.

A. Jones

Executive Vice President

Engineering,

Construction

and Operation

411 Fayetteville Street

Raleigh, North Carolina

27602

Gentlemen:

I

This refers to the inspection

conducted

by R.

D. Bradley of this office

on April 2-5,

1979 of activities authorized

by NRC License Nos.

CPPR-158,

CPPR-159,

CPPR-160

and

CPPR-161 for the Shearon Harris Nuclear Power

Plant facility, and to the discussion of our findings held with R.

M.

Parsons

at the conclusion of the inspection.

Areas

examined during the inspection

and our findings are discussed

in

the enclosed

inspection report.

Within these

areas,

the inspection

consisted

of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observations

by the inspector.

Within the scope of this inspection,

no items of noncompliance

were

disclosed.

We have

examined actions

you have taken with regard to previously identi-

fied enforcement matters.

These are discussed

in the enclosed

inspection

report.

your contractor) believe to be~~

make

a written application witHi

such information from public dr/p1

include

a full statement

of the(

claimed that the information i

o rietary, it is necessary

that you

n 20 days to this office to withhold

osure.

Any such application must

reasons

on the basis of which it is

proprietary,

and should be prepared

so

In accordance

with Section 2.790 of the NRC's "Rules of Practice",

Part 2, Title. 10,

Code of Federal Regulations,

a copy of this letter and

the enclosed

inspection report will be placed in the NRC's Public

Document

Room. If this report con ains

any information that you (or

P 9 0 5 2, 5 0 0 t l

r

P .

l

Carolina Power and

Light Company

-2-

APR l. 8 >979

that proprietary information identified in the application is contained

in a separate

part of the document.

If we do not hear from you in this

regard within the specified period,

the report will be placed in the

Public Document

Room.

Should you have any questions

concerning this letter,

we will be glad to

discuss

them with you.

Sincerely,

7 Charles

E. Murphy, Chief

Reactor Construction

and

Engineering Support Branch

I

Enclosures:

Inspection Report Nos. 50-400/79-06,

50-401/79-06,

50-402/79-05

and

50-403/79-05

cc w/enclosures:

R.

M. Parsons

Site Manager

Shearon Harris Nuclear Power Plant

Post Office Box 101

New Hill, North Carolina

27562

I

/

4 ~