ML18017A523
| ML18017A523 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 04/19/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Jackie Jones CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML18017A521 | List: |
| References | |
| NUDOCS 7905250017 | |
| Download: ML18017A523 (4) | |
See also: IR 05000400/1979006
Text
~s RpQy,
(4
0
In Reply Refer To:
RII:RDB
50-400/79-06
50-401/79-06
50-402/79-05
50-403/79-05
UNITEDSTATES
NUCLEAR REGULATORYCOMMISSION
REGION II
101 MARIETTASTREET, N.W.
ATLANTA,GEORGIA 30303
APR 19 1979
Carolina
Power and Light Company;
Attn:
J.
A. Jones
Executive Vice President
Engineering,
Construction
and Operation
411 Fayetteville Street
Raleigh, North Carolina
27602
Gentlemen:
I
This refers to the inspection
conducted
by R.
D. Bradley of this office
on April 2-5,
1979 of activities authorized
by NRC License Nos.
CPPR-158,
CPPR-159,
CPPR-160
and
CPPR-161 for the Shearon Harris Nuclear Power
Plant facility, and to the discussion of our findings held with R.
M.
Parsons
at the conclusion of the inspection.
Areas
examined during the inspection
and our findings are discussed
in
the enclosed
inspection report.
Within these
areas,
the inspection
consisted
of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observations
by the inspector.
Within the scope of this inspection,
no items of noncompliance
were
disclosed.
We have
examined actions
you have taken with regard to previously identi-
fied enforcement matters.
These are discussed
in the enclosed
inspection
report.
your contractor) believe to be~~
make
a written application witHi
such information from public dr/p1
include
a full statement
of the(
claimed that the information i
o rietary, it is necessary
that you
n 20 days to this office to withhold
osure.
Any such application must
reasons
on the basis of which it is
proprietary,
and should be prepared
so
In accordance
with Section 2.790 of the NRC's "Rules of Practice",
Part 2, Title. 10,
Code of Federal Regulations,
a copy of this letter and
the enclosed
inspection report will be placed in the NRC's Public
Document
Room. If this report con ains
any information that you (or
P 9 0 5 2, 5 0 0 t l
r
P .
l
Carolina Power and
Light Company
-2-
APR l. 8 >979
that proprietary information identified in the application is contained
in a separate
part of the document.
If we do not hear from you in this
regard within the specified period,
the report will be placed in the
Public Document
Room.
Should you have any questions
concerning this letter,
we will be glad to
discuss
them with you.
Sincerely,
7 Charles
E. Murphy, Chief
Reactor Construction
and
Engineering Support Branch
I
Enclosures:
Inspection Report Nos. 50-400/79-06,
50-401/79-06,
50-402/79-05
and
50-403/79-05
cc w/enclosures:
R.
M. Parsons
Site Manager
Shearon Harris Nuclear Power Plant
Post Office Box 101
New Hill, North Carolina
27562
I
/
4 ~