ML18017A481

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 79-01, Environ Qualification of Class IE Equipment. W/List of 11 Systematic Evaluation Program Plants for Which No Action Is Required
ML18017A481
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 02/08/1979
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
References
NUDOCS 7902280520
Download: ML18017A481 (3)


Text

~5 REay, fp

~4 0

nO I

O~

IP +**++

UNITED STATES

&e ~>I44 C NUCLEAR REGULATORY COMMISSIOh REGION II 101 MARIETTASTREET, N.W.

ATI.ANTA,GEORGIA 3O303 pl04L4 In Reply Refer TOI RII:JPO 50-400, 50-401, 50-402 and 50-403 Carolina Power and Light Company Attn:

Mr. J.

A. Jones Executive Vice President Engineering, Construction and Operation 411 Fayetteville Street

Raleigh, North Carolina 27602 Gentlemen:

Enclosed is IE Bulletin 79-01.

It requires action by you with regard to power reactor facilities with an operating license except for the 11'SEP plants which are listed in Enclosure 3.

This Bulletin is also being sent for information to the ll SEP plants and all power reactor facilities with a construction permit.

No action or written response is required for construction permit facilities or the 11 SEP plants.

Should you have questions regarding this Bulletin or the actions required of you, please contact this office.

Sincerely, 0%

James P. O'Reilly

'~ Director

Enclosures:

1.

IE Bulletin No. 79-01 2.

List of IE Bulletins Issued in the past 12 months 3.

List of SEP Plants (ll)

+n /nlrb

>so ~~8O<M

0

]

A

~ 8 t

0 Carolina Power and Light Company cc w/encl:

Mr. Roland Parsons, Site Manager Shearon Harris Nuclear Power Plant P. 0. Box 101 New Hill, North Carolina 27562