NRR E-mail Capture - Seabrook - Acceptance of Requested Licensing Action License Amendment Request to Remove Limitation to Perform Certain Surveillance Requirements During Shutdown and Changes to Adm Tech Specs
ML18016B034
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 01/16/2018
From: Justin Poole
Plant Licensing Branch 1
To: Browne K
NextEra Energy Seabrook
References
L-2017-LLA-0407
Download: ML18016B034 (2)


Text

NRR-DMPSPEm Resource From: Poole, Justin Sent: Tuesday, January 16, 2018 2:53 PM To: Browne, Kenneth Cc: Danna, James

Subject:

SEABROOK - ACCEPTANCE OF REQUESTED LICENSING ACTION RE: LICENSE AMENDMENT REQUEST TO REMOVE LIMITATION TO PERFORM CERTAIN SURVEILLANCE REQUIREMENTS DURING SHUTDOWN AND CHANGES TO ADM TECH SPECS (EPID L-2017-LLA-0407)

SUBJECT:

SEABROOK STATION UNIT NO. 1 - ACCEPTANCE OF REQUESTED LICENSING ACTION RE: LICENSE AMENDMENT REQUEST TO REMOVE LIMITATION TO PERFORM CERTAIN SURVEILLANCE REQUIREMENTS DURING SHUTDOWN AND CHANGES TO ADMINISTRATIVE TECHNICAL SPECIFICATIONS (EPID L-2017-LLA-0407)

By letter dated December 1, 2017, NextEra Energy Seabrook, LLC submitted a license amendment request for Seabrook Station Unit No. 1. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 130 hours5.417 days <br />0.774 weeks <br />0.178 months <br /> to complete. The NRC staff expects to complete this review by your requested date of November 30, 2018. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me.

Justin C. Poole Project Manager NRR/DORL/LPL I U.S. Nuclear Regulatory Commission (301)415-2048 1

Hearing Identifier: NRR_DMPS Email Number: 94 Mail Envelope Properties (Justin.Poole@nrc.gov20180116145200)

Subject:

SEABROOK - ACCEPTANCE OF REQUESTED LICENSING ACTION RE:

LICENSE AMENDMENT REQUEST TO REMOVE LIMITATION TO PERFORM CERTAIN SURVEILLANCE REQUIREMENTS DURING SHUTDOWN AND CHANGES TO ADM TECH SPECS (EPID L-2017-LLA-0407)

Sent Date: 1/16/2018 2:52:51 PM Received Date: 1/16/2018 2:52:00 PM From: Poole, Justin Created By: Justin.Poole@nrc.gov Recipients:

"Danna, James" <James.Danna@nrc.gov>

Tracking Status: None "Browne, Kenneth" <Kenneth.J.Browne@nexteraenergy.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2897 1/16/2018 2:52:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: