Amend 89 to License NPF-63,changing Table Notations for TS Table 3.3-4, Engineered Safety Features Actuation Sys Instrumentation Trip Setpoints
ML18016B025
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 07/28/1999
From: Peterson S
Office of Nuclear Reactor Regulation
To:
Shared Package
ML18016B026 List:
References
NPF-63-A-089 NUDOCS 9908030027
Download: ML18016B025 (8)


Text

0 Cy 00 IVl 0

qO

++**+

UNITEC STATES NUCLEAR REGULA".ORY COMMISSION WASHINGTON, D.C. 2055&0001 CAROLINAPOWER 8 LIGHTCOMPANY et al.

DOCKET NO. 50-400 SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1 AMENDMENTTO FACILITYOPERATING LICENSE Amendment No.

89 License No. NPF-63 The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Carolina Power 8 Light Company, (the licensee),

dated February 26, 1999, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facilitywilloperate in conformity with the application, the provisions of the Act, and th'e rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment wilt not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

Accordingly, the license is amended by changes to the Technical Specifications, as indicated in the attachment to this license amendment; and paragraph 2.C.(2) of Facility Operating License No. NPF-63 is hereby amended to read as follows:

9'908030027 9'F0728 PDR ADQCK 05000400 P

PDR

)

II

(2)

Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, as revised through Amendment No. 89, are hereby incorporated into this license.

Carolina Power & Light Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of issuance.

FOR THE NUCLEAR REGULATORYCOMMISSION P.

Attachment:

Changes to the Technical Specifications Sheri R. Peterson, Chief, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Date of Issuance:

July 28, 1999

~ ~

ATTACHMENTTO LICENSE AMENDMENTNO.

89 FACILITYOPERATING LICENSE NO. NPF-63 DOCKET NO. 50400 Replace the following page of the Appendix A Technical Specifications with the attached revised page.

The revised page is Identified by amendment number and contains marginal lines indicating the areas of change.

Remove Pa e

3/4 3-36

~Insert Pa e

3/4 3-36

TABLE 3.3-4 Continued TABLE NOTATIONS I

Time constants utilized in the lead-lag controller for Steam Line Pressure-Low are r, ) 50 seconds and 7', (

5 seconds.

CHANNEL CALIBRATION shall ensure that these time constants are adjusted to these values.

The time constant utilized in the rate-lag controller for Steam Line Pressure-Negative Rate--High is ) 50 seconds.

CHANNEL CALIBRATION shall ensure that this time constant is adjusted to this value.

The indicated values are the effective, cumulative, rate-compensated pressure drops as seen by the comparator.

SHEARON HARRIS UNIT 1 3/4 3-36 Amendment No.

89

~\\