ML18016A581
| ML18016A581 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 09/11/1998 |
| From: | Kuo P Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML18016A582 | List: |
| References | |
| NPF-63-A-082 NUDOCS 9809170062 | |
| Download: ML18016A581 (8) | |
Text
<PS RE0>
~4
~o Op I
ClO I
Cy
~ Cy gO
++*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 OLNAPO E
8 LI T
N al D
I 1
END T
ICEN E
Amendment No.
82 License No. NPF-63 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Carolina Power 8 Light Company, (the licensee), dated March 12, 1998, as supplemented by letter dated August 14, 1998, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facilitywilloperate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
Accordingly, the license is amended by changes to the Technical Specifications, as indicated in the attachment to this license amendment; and paragraph 2.C.(2) of Facility Operating License No. NPF-63 is hereby amended to read as follows:
9809i70062 9809ii PDR ADOCK 05000400 P
,1 (2) c i al ci a' vip e
I r
i P
The Technical Specifications contained in Appendix A, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, as revised through Amendment No.
82, are hereby incorporated into this license.
Carolina Power 8 Light Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of issuance.
FOR THE NUCLEAR REGULATORYCOMMISSION P o-Tsin Kuo,.Acting Director roject Directorate II-1 ivision of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
September 11, 1998
TT ENT LIC E
E DME T 0 8
ILITYO E IN EN 5<0 Replace the following page of the Appendix A Technical Specifications with the enclosed page.
The revised area is indicated by a marginal line.
Re v
P 3/4 9-15
~se ~ae 3/4 9-15
REFUELING OPERATIONS FUEL HANDLING BUILDING EMERGENCY EXHAUST SYSTEM SURVEILLANCE REQUIREMENTS (Continued) 4.9.12 (Continued) 2.
Verifying. within 31 days after removal. that a laboratory analysis of a representative carbon sample obtained in accordance with Regulatory Position C.6.b of Regulatory Guide 1.52. Revision 2, March 1978 'eets the laboratory testing criteria of Regulatory Position C.6.a of Regulatory Guide 1.52, Revision 2, March 1978.
by showing a methyl iodide penetration of less than 1.0X when tested at a
temperature of 30'C and at a relative humidity of 70K in accordance with ASTM D3803.
After every 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> of charcoal adsorber operation by verifying'ithin 31 days after removal. that a laboratory analysis of a, representative.
carbon sample obtained in accordance with Regulatory Position C.6.b of Regulatory Guide 1.52.
Revision 2, March 1978 'eets the laboratory testing criteria of Regulatory Position C.6.a of Regulatory Guide 1.52. Revision 2
~ March 1978.
by showing a methyl iodide penetration of less than 1.0X when tested at a temperature of 30'C and at a relative humidity of 70K in accordance with ASTM D3803.
d.
At least once per 18 months by:
1.
Verifying that the pressure drop across the combined HEPA filters and charcoal adsorber bank is not greater than 4. 1 inches water gauge while operating the unit at a flow rate of 6600 cfm + 10K.
2.
Verifying that.
on a High Radiation test signal, the system automatically starts and directs its exhaust flow through the HEPA filters and charcoal adsorber banks.
3.
Verifying that the system maintains the spent fuel storage pool area at a negative pressure of greater than or equal to 1/8 inch water gaugers relative to the outside atmospheres during system operation at a flow rate of 6600 cfm + 10K,and 4.
Deleted 5.
Verifying that the heaters dissipate 40 + 4 kW when tested in accordance with ANSI N510-1980.
After each complete or partial replacement of a HEPA filter bank.
by verifying that the unit satisfies the in-place penetration leakage testing acceptance criteria of less than 0.05K in accordance with ANSI N510-1980 for a DOP test aerosol while operating the unit at a flow rate of 6600 cfm + 10K.
SHEARON HARRIS - UNIT 1 3/4 9-15 Amendment No.
82