HNP-97-109, Communicates Change in Util Plans Re Implementation of GL 88-17 Requirements for Plant.Procedures Will Be Revised & Operations Personnel Will Be Briefed on Evolution Prior to Conducting Vacuum Fill,Should Util Decide to Use Vacuum

From kanterella
(Redirected from ML18012A779)
Jump to navigation Jump to search
Communicates Change in Util Plans Re Implementation of GL 88-17 Requirements for Plant.Procedures Will Be Revised & Operations Personnel Will Be Briefed on Evolution Prior to Conducting Vacuum Fill,Should Util Decide to Use Vacuum
ML18012A779
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/12/1997
From: Robinson W
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-88-17, HNP-97-109, NUDOCS 9705190172
Download: ML18012A779 (6)


Text

ACCESGION NBR:

FACIL:50-400 AUTH.NAME ROBINSONIW.R.

RECIP.NAME CATEGORY 1 REGULAT..

INFORMATION DISTRIBUTION STEM (RIDS) 9705190172 DOC.DATE: 97/05/12 NOTARIZED:

NO Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTHOR AFFILIATION Carolina Power

& Light Co.

RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

DOCKET I 05000400

SUBJECT:

Communicates change in util plans re implementaion of GL 88-17 requirements for plant. Procedures will be revised a

operations personnel will be briefed on evolution prior to conducting vacuum fill,should util decide to use vacuum.

DISTRIBUTION CODE:

A001D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal:

General Distribution NOTES:Application for permit-renewal filed.

05000400 RECIPIENT ID CODE/NAME PD2-1 LA LE,N INTERNAL: ACRS NRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS2 EXTERNAL: NOAC COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD2-1 PD F

QENZ~

NRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT NRC PDR COPIES LTTR ENCL 0

D 0

E N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPTER REQUTRED:

LTTR 14 ENCL Q

(a I

Carolina Power & Light Company PO Box 165 New Hill NC 27562 William R. Robinson Vice President Harris Nuclear Plant MAY 1

2 1997 United States Nuclear Regulatory Commission ATTENTION:Document Control Desk Washington, DC 20555 SERIAL: HNP-97-109 SHEARON HARRIS NUCLEARPOWER PLANT DOCKETNO. 50-400/LICENSE NO. NPF-63 GENERIC LETTER 88-17, "LOSS OF DECAYHEATREMOVAL" RESPONSE MODIFICATION

Dear Sir or Madam:

The purpose of this letter is to communicate a change in Carolina Power & Light Company's (CP&L) plans regarding implementation of Generic Letter 8S-17 requirements for the Harris Nuclear Plant (HNP).

By letter dated January 3,

19S9, CP&L informed the NRC of plans to implement each expeditious recommendation contained in the generic letter at HNP. To address recommended action P6 of the generic letter, which required two available or operable means of adding inventory to the Reactor Coolant System (RCS), the letter stated that "Technical Specifications require that one high pressure injection pump be operable during cold shutdown" and "Since the generic letter specifically disallows credit for inventory addition via the decay heat removal pumps, a second path must necessarily be passive in nature; for example, a gravity feed from the refueling water storage tank to the RCS could be used."

HNP had later implemented a further restriction to require that the pressurizer manway be removed when the refueling water storage tank (RWST) was being relied upon as the second means ofadding water.

By letter dated April4, 1997, HNP informed the NRC that during the RCS vacuum fillprocess, which would be used for the first time during refueling outage 7, the pressurizer manway.would be bolted in place.

This, coupled with other malfunctions, could render gravity feed from the RWST ineffective.

Therefore, CP&L stated that during this time period, the racked out, but available, Charging/Safety Injection Pump (CSIP) would be consider'ed the second means of adding inventory into the RCS in the event of a loss of decay heat removal capability.

CP&L planned to revise applicable operating procedures and brief Operations personnel regarding this change.

9705i90f72 970512 PDR ADOCK 05000400'f.

P PDR ff!ffff!fill!Illllf Ill filllllll/I/lfll State Road113st NewHill NC Tel 919362-2502 Fax 919362-2095

f'!

. KLcument Control Desk

, SEIUAL: HNP-97-109 At management's discretion, the vacuum fill process will not be used during recovery from refueling outage 7.

Therefore, the applicable operating procedures may not be revised at this time to designate the racked out CSIP as a second means for RCS inventory control.

During recovery from refueling outage 7, CPS'ill rely on gravity feed from the RWST as the second water addition means of RCS inventory control in the event of a loss of decay heat removal capability as discussed inthe January 3, 1989 letter. Should HNP decideto use the vacuum fill process in the future, the procedures willbe revised and Operations personnel willbe briefed on the evolution prior to conducting the vacuum fill.

Questions regarding this matter may be referred to Ms. D. B. Alexander at (919) 362-3190.

Sincerely, W. R. Robinson Vice President Harris Nuclear Plant MGW c: