Forwards Insp Rept 50-400/94-05 on 940115-0218 & Forwards Notice of Violation.Violations Indicate Recurring Problems W/Conduct of Filter Backflushing Evolutions & Ability to Identify Problems W/Plant Computer Sys in Reasonable Time
ML18011A389
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/09/1994
From: Jaudon J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robinson W
CAROLINA POWER & LIGHT CO.
Shared Package
ML18011A390 List:
References
NUDOCS 9403150185
Download: ML18011A389 (5)


See also: IR 05000400/1994005

Text

FORD I

REGULATORY ZNFORMATION DISTRIBUTION SYSTEM (RIDS)

V

ACCESSION NBR:9403150185

DOC.DATE: 94/03/09

NOTARIZED:

NO

~

~

~

ACZL:50-400 Shearon Harris Nuclear

Power Plant, Unit 1, Carolina

AUTH.NAME

AUTHOR AFFILIATION

JAUDON,J.P.

Region

2 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

ROBINSON,W.R.

Carolina

Power

& Light Co.

DOCKET

05000400

S

05000400

I:

NOTES:Application for permit renewal filed.

SUBJECT: Forwards

insp rept 50-400/94-05

on 940115-0218

& forwards

notice of violation.Violations indicate recurring problems

w/conduct of filter backflushing evolutions

& ability to

identify problems w/plant computer

sys in reasonable

time.

DISTRIBUTION CODE:

IEOID

COPIES

RECEIVED:LTR L ENCL 3

SIZE:

+

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

RECIPIENT

ID CODE/NAME

PD2-1

PD

INTERNAL: ACRS

AEOD/DSP/ROAB

AEOD/TTC

NRR/DORS/OEAB

NRR/DRIL/RPEB

,NRR/PMAS/ILPB1

NUDOCS-ABSTRACT

OGC/HDSl

RES/HFB

EXTERNAL

EG&G/BRYCE F J II ~

NSIC

COPIES

LTTR ENCL

1

1

2,

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

LEFN

AEOD/DEIB

AEOD/DSP/TPAB

DEDRO

NRR/DRCH/HHFB

NRR/DRSS/PEPB

NRR/PMAS/ILPB2

O~D'IR~

CREG~~

02

RGN2

FILE

01

NRC

PDR

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

0

~

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM P!-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION

LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

24

ENCL

24

Docket No.:

50-400

License No.:

NPF-63

Carolina

Power

and Light Company

ATTN: Mr.

W.

R. Robinson

Vice President

- Harris Plant

Shearon Harris Nuclear

Power Plant

P. 0.

Box 165

Mail Code:

Zone

1

New Hill, NC 27562-0165

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

NRC

INSPECTION

REPORT

NO. 50-400/94-05

This refers to the inspection

conducted

by J.

Tedrow of this office on

January

15 - February

18,

1994.

The inspection

included

a review of

activities authorized for your Harris facility.

At the conclusion of the

inspection,

the findings were discussed

with those

members of your staff

identified in the enclosed

inspection report.

Areas

examined during the inspection

are identified in the report.

Within

these

areas,

the inspection consisted

of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observation of

activities in progress.

Based

on the results of this inspection,

certain of your activities appeared

to be in violation of NRC requirements,

as specified in the enclosed

Notice of

Violation (Notice).

The violations are of concern

because

they indicate

recurring problems with the conduct of filter backflushing evolutions

and your

ability to identify problems with the plant computer

system within a

reasonable

time.

In December

1991, the operators failed to implement

procedures

properly for the backflushing of the recycle evaporator feed'ilter

which resulted

in increased

airborne activity in the Waste Processing

Building.

A.non-cited violation

(NCV 400/91-27-02)

was issued for this

incident.

In August 1992, the operators failed to implement procedures

properly to backflush the seal

water return filter which resulted

in a

challenge to the system relief valve.

A Severity Level

IV violation was

issued for this incident

on September

17,

1992.

With regard to the recurring

problems with the plant computer system,

a similar failure occurred in January

1992 when operators failed to detect

an

ERFIS failure.

The

NRC expects

licensees

to learn from previous failures

and to take effective corrective

actions.

Therefore,

you are requested

to give particular attention to your

response

relative to the identification of the root cause of these

problems

and your corrective action to prevent recurrence.

>engr>-

9403150185

940309

PDR

ADOCK 05000400

8

PDR

Carolina

Power

and Light Company

2

In addition, the enclosed

Inspection

Report identifies activities that

violated

NRC requirements

that will not be subject to enforcement

action

because

the licensee's

efforts in identifying and/or correcting the violation

meet the criteria specified in Section VII.B. of the Enforcement Policy.

You are required to respond to this letter

and should follow the instructions

specified in the enclosed

Notice when preparing your response.

In your

response,

you should

document the specific actions

taken

and

any additional

actions you plan to prevent recurrence.

After reviewing your response

to this

Notice, including your proposed corrective actions

and the results of future

inspections,

the

NRC will determine

whether further

NRC enforcement

action is

necessary

to ensure

compliance with NRC regulatory requirements.

In accordance

with 10 CFR 2.790, of the NRC's "Rules of Practice,"

a copy of

this letter and its enclosures will be placed in the

NRC Public Document

Room.

The responses

directed

by this letter

and the enclosed

Notice are not subject

to the clearance

procedures

of the Office of Management

and Budget

as required

by the Paperwork Reduction Act of 1980,

Pub.

L. No. 96.511.

Should you have

any questions

concerning this letter,

please

contact

us.

Sincerely,

Original signed

by:

Johns

P. Jaudon/for

Jon

R. Johnson,

Acting Director

Division of Reactor Projects

Enclosures:

1.

Notice of Violation

2.

NRC Inspection

Report

cc w/encls:

Mr.

W. S. Orser

Executive Vice President

Nuclear Generation

Carolina

Power

& Light Company

P.

O.

Box 1551 - Mail Code:

CPB

12

Raleigh,

NC 27602

Mr. H.

W. Habermeyer,

Jr.

Vice President

Nuclear Services

Department

Carolina

Power

& Light Company

P. 0.

Box 1551 - Mail OHS7

Raleigh,

NC 27602

(cc w/encls cont'd - See

page 3)

Carolina

Power

and Light Company

(cc w/encls cont'd)

D.

C. McCarthy,

Manager

Regulatory Affairs

P. 0.

Box 165

New Hill, NC 27562-0165

H.

Ray Starling

Vice President

- Legal Department

Carolina

Power

and Light Company

P. 0.

Box 1551

Raleigh,

NC 27602

Dayne

H. Brown, Director

Division of Radiation Protection

N.

C. Department of Environment,

Health

5 Natural

Resources

P. 0.

Box 27687

Raleigh,

NC 27611-7687

Ms. Gayle

B. Nichols

Staff Counsel

SC Public Service

Commission

P. 0.

Box 11649

Columbia,

SC 29211

bcc w/encls:

H. Christensen,

RII

N. Le,

NRR

Document Control

Desk

NRC Resident

Inspector

U.S. Nuclear Regulatory

Commission

Route

1,

Box 315B

New Hill, NC 27562

RII:DRP

JStarefos:tj

03/3 /94

RII: RP

JTedrow

03/g /94

RI

DRP

HChristensen

03/P /94

RII:DRP/

DVerrelli

03/

/94

r c

03

/94