ML18011A245
| ML18011A245 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 11/30/1993 |
| From: | Robinson W, Shannon Rogers CAROLINA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| HO-931044, NUDOCS 9312200016 | |
| Download: ML18011A245 (8) | |
Text
ACCELERATED DI, RIBUTION DEMONST ATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION ROGERS,S.
Carolina Power 6 Light. Co.
ROBINSON,W.R.
Carolina Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400 R
SUBJECT:
Monthly operating re 993 for Shearon Harris Nuclear Power Pla
/931215 l DISTRIBUTION CODE I IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:Application for permit, renewal filed.
D 05000400 /
RECIPIENT ID CODE/NAME PD2-1 LA LE,N INTERNAL: ACRS AEOD/DSP/TPAB NRR/DRIL/RPEB RGN2 EXTERNAL EGGG BRYCE iJ H
NSIC COPIES LTTR ENCL 3
3 1
1 10 10 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DOA R
-DQ OEAB RE FILE 01 NRC PDR, COPIES LTTR ENCL 1
1 D
D D
A D
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 24 ENCL 24
ga J
1 ~
Carolina Power & Light Company Harris Nuclear Plant PO Box 165 New Hill NC 27562 OEC 1
5 59~
File: HO-931044 Serial HNP-93-865 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATIONS REPORT Gentlemen:
In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No. 1, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of November 1993.
Very truly yours, W. R. Robinson Vice President Harris Nuclear Plant SGR:dmw Attachments c:
Mr. S. D. Ebneter (NRC-RII)
, Mr. N. B. Le (NRR)
Mr. J. E. Tedrow (NRC-SHNPP) 9312200016 931130 PDR ADOCK 05000400 R.,
ZDR.
HIS/HTH-OPR. RPT/1/OS 4 State Road 1134 New Hill NC l$ (
4 A
h CI I
'All f
DOCKET NO.:
050-400 UNIT:
Harris Unit 1 DATE:
November 1993 COMPLETED BY:
Sheila Rogers OPERATIONS
SUMMARY
Harris Unit 1 operated at 100 percent Availability Factor for the referenced month and a 102.00 percent Capacity Factor.
There were no significant power reductions.
There are 157 fuel assemblies in the reactor vessel and 1167 spent fuel assemblies stored in the spent fuel pools.
719 of the spent fuel assemblies are BWR, which were shipped to Harris from CP&L's Brunswick Plant.
224 of the spent fuel assemblies are from CP&L's Robinson Plant.
HIS/HTH-OPR. RPT/2/OS%
A CP&L CO RUN DATE 12/07/93 RUN TIME 14:01:55 PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1 PAGE 1
RPD36-000 OPERATING STATUS DOCKET NO. 050%00 COMPLETED BY SHEILA ROGERS TELEPHONE (9191 362-2573 1.
2.
3.
4.
5.
6.
7 ~
8.
UNIT NAME: HARRIS UNIT 1 RfPORTING PERIOD:
NOVEMBER 93 LICENSED THERMALPOWER (MWT): 2775 NAMEPLATE RATING (GROSS MWE): 950.9 DESIGN ELECTRICAL RATING (NET MWE): 900.0 MAXDEPENDABLE CAPACITY (GROSS MWE): 920.0 NOTES:
SEE OPERATIONS
SUMMARY
MAXDEPENDABLE CAPACITY (NET MWE): 860.0 IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
NONE 9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE 10.
REASONS FOR RESTRICTION IF ANY: N/A THIS MONTH 11.
HOURS IN REPORTING PERIOD 720.00 12.
NUMBER OF HOURS REACTOR CRITICAL 720.00 13.
REACTOR RESERVE SHUTDOWN HRS
.00 14.
HOURS GENERATOR ON LINE 720.00 15.
UNIT RESERVE SHUTDOWN HOURS
.00 16.
GROSS THERMALENERGY GEN. (MWH) 1996068.60 17.
CROSS ELEC. ENERGY GEN. (MWH) 671 992.00 18.
NET ELEC. ENERGY GENERATED (MWH) 631 602.00 19.
UNIT SERVICE FACTOR 100.00 20.
UNIT AVAILABILITYFACTOR
'1 00.00 21.
UNIT CAP. FACTOR (USING MDC NET) 102.00 22.
UNIT CAP. FACTOR (USING DER NET) 97.47 23.
UNIT FORCED OUTAGE RATE
.00 24.
SHUTDOWNS SCHfD. OVfR NEXT 6 MONTHS (TYPE, DATE, 8016.00 7989.41
.00 7977.45
~00 21911559.84 734541 8.00 6896045.00 99.52 99 52 100.03 95.59
.00 AND DURATION 57721.00 47558.31
.00 47033.63
.00 1 25262665.28 41 760259.00 38901 721.00 81A8 81.48 78.37 74.88 3.39 OF EACH):
YR TO DATE CUMULATIVE 25.
26.
ACHIEVED INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION UNIT SCHEDULED FOR SHUTDOWN ON MARCH 5, 1994 FOR RfFUELING OUTAGE NUMBfR 5.
I 1'F SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST HTS/HTH-OPR.RPT/3/OS4
~
~
-'I A
CP&L CO PLANT PERFORMANCE DATA SYSTEM RUN DATE 12/07/93 APPENDIX B -
AVERAGE DAILY POWER LEVEL RUN TIME 14:01:54 HARRIS UNIT 1 PAGE 1 RPD39-000 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919) 362-2573 NOVEMBER 1993 DAY 3
I 4 10 12 13 14 15 16 AVG. DAILYPOWER LEVEL (MWE-NET) 882 883 882 877 871 875 884 883 883 881 881 879 873 865 861 870 DAY 17 19 20 21 22 23 24 25 26 27 28 29 30 AVG. DAILYPOWER LEVEL (MWE-NET) 868 879 880 871 876 879 879 880 879 880
.872 877 884 883 HIS/HTH-OPR.RPT/4/OS4