Monthly Operating Rept for Jan 1993 for Harris Nuclear Plant Unit 1.W/930211 Ltr
ML18010B013
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 01/31/1993
From: Crenshaw A, Vaughn G
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HO931005, NUDOCS 9302190227
Download: ML18010B013 (10)


Text

~ - =-

ACCEI i

AUTH. NAME CRENSHAW,A.

VAUGHN,G.E.

RECIP.NAME ERAT REGULAT

>>>>7 AUTHOR AFFILIATION Carolina Power Carolina Power

'ECIPIENT

.:~:

DOCUMENT DIST INFORMATION DISTRIBUTIO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina S

Light Light AFFILIATION Co.

Co.

UTION SYSTEM STEM (RIDS)

  • 8 05000400 R'i

SUBJECT:

Monthly o ing rept for Jan 1993 for Harris Nuclear Plant Unit l. 930211 tr. D DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:Application for permit renewal filed. 05000400

'ECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 3 3 PD2-1 PD 1 1 D LE,N 1 1 D

INTERNAL: ACRS 10 10 AEOD/DOA 1 1

'AEOD/DSP/TPAB NRR/DOEA/OEAB 1

1 1

1 'E~DLPQ/LPEB10 NR~R 01 1

1 1

1 S, RGN2 1 1 EXTERNAL EGStG BRYCE g J ~ H 1 1 NRC PDR 1 1 NSIC 1 1 I

D i D

D NOTE TO ALL"RIDS", RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24

'0 p II a

  • l g

~ 1

~ k, 2

~

(~ -'.<<'g,ega t

CHILL Carolina Power & Light Company P.O. Box 165 ~ New Hill NC 27562

~

G.E. VAUGHN Vce President Hanis Nudear Plant FEB f t f99 File Number: SHF/10-15505 Letter Number: H0931005 Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PLANT DEPARTMENT UNIT NO. 1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT

Dear Sirs:

In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No. 1, Carolina Powe'r 6 Light Company herewith submits the report of operation statistics and shutdown experience for the month of January 1993.

Yours very truly, G. E. Vaughn Vice President Harris Nuclear Plant

, APC:kjc Enclosure cc: Mr. S. D. Ebneter (NRC-RII)t.

Mr. J. E. Tedrow (NRC-SHNPP) 18.130 MIS/MTH-OPR.RPT/1/OS4 P ~I

( 9SOEX90ZV7 VSOisi.

PDR ADOCK 05000400 R ~ FDR

~ I

~b J )

.0, DOCKET NO.: 050-400 UNIT: Harris Unit 1 DATE: January 1993 COMPLETED BY: Amanda Crenshaw OPERATIONS

SUMMARY

Harris Unit 1 operated at 100.00 percent Availability Factor for the referenced month and a 100.9 percent Capacity Factor. There was one significant power reduction. Details are provided on the Unit Shutdowns and Power Reduction Sheets.

There are 157 fuel assemblies in the reactor vessel and 847 spent fuel assemblies stored in the spent fuel pools. 413 of the spent fuel assemblies are BWR, which were shipped to Harris from CP&L's Brunswick Plant. 210 of the spent fuel assemblies are from CPSL's Robinson Plant.

MISXMTH-OPR.RPTX2%OS4

CPhL CO ~ ANT PERFORMANCE DATA SYSTEM PAGE RUH DATE 82/05/93 OPERATIHG DATA REPORT RPD36-000 RUH TIME >8:57:23 HARRIS UNIT 1 DOCKET HO. 858-400 COMPLETED BY AMAHDA CREHBHAW OPERATING STATUS TELEPHONE (919)362-2888 UNIT NAME: HARRIS UNIT 1 NOTES

2. REPORTING PERIOD: JANUARY 93 I
3. LICENSED THERMAL POWER (MWT): 2775 See Operations Summary.
4. NAMEPLATE RATING (GROSS MWE): 950.9 I
5. DESIGN ELECTRICAL RATIHG <NET MWE): 980.0
6. MAX DEPENDABLE CAPACITY <GROSS MWE): 928.0
7. MAX DEPENDABLE CAPACITY <NET MWE): 860.8 8 IF CHAHGES OCCUR IH CAPACITY RATIHGS (ITEMS 3 THRU 7) BIHCE LAST REPORT i GIVE REASONS: None.

POWER LEVEL TO WHICH RESTRICTED IF ANY <HET MWE): None.

3 8. REASONS FOR RESTRICTION IF AHY: N/A THIS YR TO CUMUL MON'EH DATE ATIVE HOURS IH REPORTIHG PERIOD 744.80 744.00 50449.08 1 2. NUMBER OF HOURS REACTOR CRITICAL 744.00 744.00 48312.98

13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00 HOURS GENERATOR ON LIHE 744.00 744.00 39888.18

$ 5. UNIT RESERVE SHUTDOWN HOURS .08 .00 .00

16. GROSS THERMAL EHERGY GEH. (MWH) 2806564.76 2006564.76 $ 85357678.28
17. GROSS ELEC. ENERGY GEH. (MWH) 688813.88 688833.88 35182854.88
18. HET ELEC. ENERGY GENERATED (MWH) 645579.00 645579.00 32651255.88 UNIT SERVICE FACTOR 388.88 188.88 78.89
20. UNIT AVAILABILITYFACTOR 388.88 188.88 78.89 2$ . UNIT CAP. FACTOR (USING MDC HET) 188.90 188.98 75.26
22. UNIT CAP. FACTOR (USING DER NET) 96.43 96.43 71.93
23. UNIT FORCED OUTAGE RATE .80 .00 3.98
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AHD DURATION OF EACH):

None.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IH TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION I

HIS/MTH-OPR, RPT/3/OS4

F ~

A 4'

'CPM CO " ~ AHT PERFORMANCE DATA SYSTEM PAGE RUH DATE 02/05/93 APPENDIX B AVERAGE DAILY POWER LEVEL RPD39-000 RUH TIME -1 0: 57: 22 HARRIS UNIT I DOCKET HO. 050-400 COMPLETED BY AMAHDA CRENSHAW TELEPHONE (919)362-2808 JANUARY <993 i

DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-HET) (MWE-NET) 884 886 879 18 887 878 887 877 20 887 875 21 884 886 884 593 885 677 880 884 888 10 890 887 888 886 888 28 884 883 883 30 867 888 887 3 ~ 16 8 MIS/MTH-OPR.RPT/4/OS4

'I

~

UNIT SHUTDOWNS AND POWER REDUCTION UNIT NAME: Harris, I

DATE: 02/04/93 O COMPLETED BY: A. P. Crenshaw F TELEPHONE: (919) 362-2808 REPORT MONTH: January 1993 O

R~

e a

y s Method of Licensee P Duration 0 Shutting Down Event System Component Cause and Corrective Action No. Date e (Hours) Reactor~ Report ¹ Code 4 Code 5 to Prevent Recurrence 93401 930107 F 0.0 A N/A CB VALVE Reduced unit power to 10% to repair Steam Generator "A" bowl drain isolation valves. Valves were tightened and the drain plug downstream of the valves was replaced. Unit was returned to 100% power on January 8, 1993.

1 2 3 4

.F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled ~

A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG+1 51)

E-Operator Training 5 License Examination 5-Reduced Load F-Administrative 6-Other 5 G-Operational Error (Explain) Exhibit 1 -Same Source H-Other (Explain)

~ j, ).

~ ~