Forwards Insp Rept 50-400/92-27 on 921024-1120 & Notice of Violation.Encl Insp Rept Identifies Activities That Violated NRC Requirements That Will Not Be Subject to Enforcement Action Because Efforts Correcting Violation Meet Criteria
ML18010A961
Person / Time
Site: Harris 
Issue date: 12/08/1992
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Watson R
Carolina Power & Light Co
Shared Package
ML18010A962 List:
References
NUDOCS 9212290054
Download: ML18010A961 (5)


See also: IR 05000400/1992027

Text

FORD l

C4

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9212290054

DOC.DATE: 92/12/08

NOTARIZED: NO

'ACIL:50-400 Shearon Harris Nuclear

Power Plant, Unit 1, Carolina

AUTH.NAME

~

~

~

~

AUTHOR AFFILIATION

RRELLI,D.M.

Region

2 (Post

820201)

ECIP.NAME

RECIPIENT AFFILIATION

WATSON,R.A.

Carolina Power

& Light Co.

DOCKET

05000400

,

D

I

/

05000400 F

NOTES: Applica tion for permit renewal fi led.

SUBJECT:

Forwards

insp rept 50-400/92-27

on 921024-1120

& notice of

violation. Encl insp rept identifies activities that violated

NRC requirements

that will not be subject to enforcement

action because efforts correcting violation meet criteria.

DISTRIBUTION CODE: IEOID

COFIES RECEIVED:LTRI ENCL 3

SIZE: 3+

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

RECIPIENT

ID CODE/NAME

PD2-1

PD

INTERNAL: ACRS

AEOD/DEIB

AEOD/TTC

NRR MORISSEAUED

NRR/DLPQ/LPEB10

NRR/DREP/PEPB9H

NRR/PMAS/ILRB12

OE D~

REG FILE

02

EXTERNAL: EG&G/BRYCEEJ.H.

NSIC

COPIES

LTTR ENCL

1

1

2

2

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

LE,N

AEOD

AEOD/DSP/TPAB

DEDRO

NRR/DLPQ/LHFBPT

NRR/DOEA/OEAB

NRR/PMAS/ILPB

NUDOCS-ABSTRACT

OGC/HDS1

RGN2

FILE

01

NRC PDR

~ COPIES

LTTR ENCL

1

1

1

1

1

1

1

-1

1

1

1

1

2

2

1

1

1

1

1

1

1

1

NOTE TO ALL RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM P 1-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION

LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

26

ENCL

26

Docket No. 50-400

License

No.

NPF-63

OEC

8

!992

Carolina

Power

and Light Company

ATTN:

Hr.

R. A. Watson

Senior Vice President

Nuclear Generation

P. 0.

Box 1551

Raleigh,

NC 27602

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC INSPECTION

REPORT

NO. 50-400/92-27)

This refers to the inspection

conducted

by J.

Tedrow of this office on

October

24 - November 20,

1992.

The inspection

included

a review of

activities authorized for your Harris facility.

At the conclusion of the

inspection,

the findings were discussed

with those

members of your staff

identified in the enclosed

inspection report.

Areas

examined during the inspection

are identified in the report.

Within

these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observation of

activities in progress.

Based

on the results of this inspection,

certain of your activities appeared

to be in violation of NRC requirements,

as specified in the enclosed

Notice of

Violation (Notice).

In addition, the enclosed

Inspection

Report identifies

activities that violated

NRC requirements

that will not be subject to

enforcement

action

because

the licensee's

efforts in identifying and/or

correcting the violation meet the criteria specified in Section VII.B. of the

Enforcement Policy.

You are required to respond to this letter and should follow the instructions

specified in the enclosed

Notice when preparing your response.

In your

response,

you should document the specific actions

taken

and

any additional

actions

you plan to prevent recurrence.

After reviewing your response

to this

Notice, including your proposed

corrective actions

and the results of future

inspections,

the

NRC will determine whether further

NRC enforcement

action is

necessary

to ensure

compliance with NRC regulatory requirements.

In accordance

with 10 CFR 2.790, of the

NRC's "Rules of Practice,"

a copy of

this letter and its enclosures will be placed in the

NRC Public Document

Room.

The responses

directed

by this letter

and the enclosed

Notice are not subject

to the clearance

procedures

of the Office of Management

and Budget

as required

by the Paperwork Reduction Act of 1980,

Pub.

L. No. 96.511.

92i2290054 92i208

PDR

ADOCK 05000400

8

PDR

~Eol

OEC

g

PR'arolina

Power and Light Company

2

Should you have

any questions

concerning this letter,

please

contact us.

Sincerely,

QRlOIHAL ggs'.

pAVIO M V~pz LU

David N. Verrelli, Chief

Reactor Projects

Branch

1

Division of Reactor Projects

Enclosures:

1.

Notice of Violation

2.

NRC Inspection

Report

cc w/encls:

G.

E.

Vaughn

Vice President

Harris Nuclear Project

P. 0.

Box 165

New Hill, NC

27562

C. S. Hinnant

Plant General

Hanager

Harris Nuclear Plant

P. 0.

Box 165

New Hill, NC

27562

C.

S. Olexi k, Jr.,

Hanager

Regulatory Compliance

Harris Nuclear Project

P. 0.

Box 165

New Hill, NC

27562

H.

Ray Starling

Vice President

- Legal Department

Carolina

Power

and Light Co.

P. 0.

Box 1551

Raleigh,

NC

27602

Dayne

H. Brown, Director

Division of Radiation Protection

N.

C. Department of Environment,

Health

8 Natural

Resources

P. 0.

Box 27687

Raleigh,

NC

27611-7687

(cc w/encls cont'd - See

page 3)

Carolina

Power

and Light Company

(cc w/encls cont'd)

Hs. Gayle

B. Nichols

Staff Counsel

SC Public Service

Commission

P. 0.

Box 11649

Columbia,

SC

29211

bcc w/encls:

H. Christensen,

RII

N. Le,

NRR

Document Control

Desk

NRC Resident

Inspector

U.S. Nuclear Regulatory

Commission

Route

1,

Box 315B

New Hill, NC

27562

DEC

8

l992

RI

'DRP

D o

ts:tj

12/P/92

RII:D P

HChristensen

12/9 /92